• Concrete Pump Truck Camc 8*4 56m Cement System 1
  • Concrete Pump Truck Camc 8*4 56m Cement System 2
Concrete Pump Truck Camc 8*4 56m Cement

Concrete Pump Truck Camc 8*4 56m Cement

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete Pump Truck Camc 8*4 56m Cement 

Product Details

Basic Info.

Model NO.:AH5430THB0L4

 

Type:Concrete Pump

Machining Process:Hydraulic

 

Certification:ISO9001: 2000, CE

Condition:New

 

Power:Diesel

Emission Standard:Euro II&III&IV

 

Truck Type:Concrete Pump Truck

Seats:≤5

 

Tire Certification:ISO

Drive Mode:8*4

 

Vertical Reach:56m

Export Markets:Global

Additional Info.

Trademark:CAMC

 

Packing:by Container/Nude Packing/Roro Ship

Origin:China

 

Production Capacity:10000 Units/Year

Product Description



Complete vehicle                  Performance indexunitAH5430THB0L4 ( 56m 8*4 )
Max. theo. concrete output (L./H.) m 3 /h150
Max.concrete pumping pressureMpa9
Concrete cylinder diameter×strokemm260×2200

mm2200
Pumping frequency/min22
Distribution valve type
S
Overall dimensionmm14380*2495*3990
Total weightkg42805
Hopper volumem 30.6
Inside diameter of delivering pipemm125
Loading heightmm1400
Clean systemCapacity of water tankL600
Water supplyL/min10
Water pressureMpa4
Arm sectionsModel
RZ
Maximum height from the groundm55.6
 Maximum horizontal delivery distancem51.6
Maximum depthm42.8
Angle of revolution.0~365
Angle of development angle1.90
2.180
3.180
4.236
5.225
6.85
7./
Leg span LONGITUDINAL SPANmm10374
formalFront Leg spanmm9400
Back Leg spanmm11780
one sideFront Leg spanmm6200
Back Leg spanmm7390
Hydraulic system
High pressureMpa32
Low pressureMpa/

Low pressure/22
High pressure//

Low pressurem 3 /h140
High pressurem 3 /h/




Hydraulic Oil tankL800
hydraulic pump pressureMpa400
Chassischassis model
HN5432THBB43D5M4J
Drive mode
8*4
Max speedkm/h89
 Minimum turning radiusm9.6
Braking lengthm35
Number of axles
4
Tyremm12.00-20,12.00R20 
Oil tankL400
Engine       Engine

output powerkw/(r/min)338(1900)
DisplacementL11.81
Emission 
EuroII , III , IV

Concrete Pump Truck Camc 8*4 56m Cement

Concrete Pump Truck Camc 8*4 56m Cement


Q: How to achieve the concrete pump pendulum for the change?
3. Proximity switch or stroke switch is a commutation signal to the pendulum, swing swing in place, from the pendulum to the main cylinder a commutation signal.
Q: How to determine the concrete pump truck blocking the site
When the delivery pressure gradually increased, and the hopper material does not decline, the pipeline outlet is not expected, the pump vibration, piping is also accompanied by a strong vibration and displacement, can be judged to be blocked.
Q: What is the price of concrete pump truck?
The most expensive two or three hundred thousand years, expensive millions.
Q: 90KW concrete pump should be used in the number of generators?
To normal long running 90KW concrete pump, 150KW generator is not enough, because the device to start the current
Q: What is the working principle and structure of a concrete pump truck?
Pumping device for the piston concrete pump, the use of hydraulic cylinder to drive the concrete cylinder piston for reciprocating motion, with the hopper, distribution valve with the completion of inhalation and removal of concrete, in order to achieve the purpose of transport.
Q: How to cooperate with concrete mixers and concrete pump trucks
the pump to hit the material in the material Where the pump can lift the height of more than 40 meters
Q: What are the standards for the use of concrete pumps?
The concrete pump should be firmly fixed before use, support four feet to make the tire from the ground, or remove the tire.
Q: Building concrete pump is how to bulk cement (concrete) to the high
At the same time, another main cylinder under the action of the pressure, to promote the main cylinder of the piston rod out and at the same time to push the concrete piston out of the concrete tank, through the slide valve Y port into the concrete pipe.
Q: What is the meaning of cast - in - place concrete secondary grouting?
Recycled concrete secondary grouting refers to the concrete pouring after solidification; with grouting equipment will be designed slurry (usually cement slurry, water, highway for a certain ratio of cement, sand) into the concrete due to solidification and shrink
Q: Can the tower crane be filled with concrete pump tube?
(3) the weight of the hanging material is not clear or overload is not allowed to be suspended; (4) the bulk of the bundle is not strong or the material is not full of loading and unloading; (2)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords