Concrete Pump Truck Camc 8*4 53m Cement Cyh52y
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Concrete Pump Truck Camc 8*4 53m Cement Cyh52y
Product Details
Basic Info.
Model NO.:AH5420THB0M4
Type:Concrete Pump
Machining Process:Hydraulic
Certification:ISO9001: 2000, CE
Condition:New
Power:Diesel
Emission Standard:Euro II&III&IV
Truck Type:Concrete Pump Truck
Seats:≤5
Tire Certification:ISO
Drive Mode:8*4
Vertical Reach:53m
Export Markets:Global
Additional Info.
Trademark:CAMC
Packing:by Container/Nude Packing/Roro Ship
Origin:China
Production Capacity:10000 Units/Year
Product Description
Complete vehicle | Performance index | unit | AH5420THB0M4 ( 53m8*4 ) | |
Max. theo. concrete output (L./H.) | m 3 /h | 150 | ||
Max.concrete pumping pressure | Mpa | 9 | ||
Concrete cylinder diameter×stroke | mm | 260×2200 | ||
mm | 2200 | |||
Pumping frequency | /min | 22 | ||
Distribution valve type | S | |||
Overall dimension | mm | 14380*2495*3990 | ||
Total weight | kg | 41870 | ||
Hopper volume | m 3 | 0.6 | ||
Inside diameter of delivering pipe | mm | 125 | ||
Loading height | mm | 1400 | ||
Clean system | Capacity of water tank | L | 600 | |
Water supply | L/min | 10 | ||
Water pressure | Mpa | 4 | ||
Arm sections | Model | RZ | ||
Maximum height from the ground | m | 52.7 | ||
Maximum horizontal delivery distance | m | 48.7 | ||
Maximum depth | m | 38.1 | ||
Angle of revolution | . | 0~365 | ||
Angle of development angle | 1 | . | 90 | |
2 | . | 180 | ||
3 | . | 180 | ||
4 | . | 236 | ||
5 | . | 225 | ||
6 | . | 85 | ||
7 | . | / | ||
Leg span | LONGITUDINAL SPAN | mm | 10374 | |
formal | Front Leg span | mm | 9400 | |
Back Leg span | mm | 11780 | ||
one side | Front Leg span | mm | 6200 | |
Back Leg span | mm | 7390 | ||
Hydraulic system | pump pressure | High pressure | Mpa | 32 |
Low pressure | Mpa | / | ||
pump times | Low pressure | times/ min | 22 | |
High pressure | times/min | / | ||
displacement | Low pressure | m 3 /h | 140 | |
High pressure | m 3 /h | / | ||
Hydraulic Oil tank | L | 800 | ||
hydraulic pump pressure | Mpa | 400 | ||
Chassis | chassis model | CYH52Y | ||
Drive mode | 8*4 | |||
Max speed | km/h | 88 | ||
Minimum turning radius | m | 9.6 | ||
Braking length | m | 35 | ||
Number of axles | 4 | |||
Tyre | mm | 315/80R22.5 | ||
Oil tank | L | 400 | ||
Engine | Engine | |||
output power | kw/(r/min) | 294 /(1800) | ||
Displacement | L | 15.68 | ||
Emission | EuroII , III , IV |
- Q: What is the difference between the construction of a concrete pump and a concrete distributor?
- Pumping sub-trailer pump and car pump, drag pump delivery range is relatively large, then take the tube in the past can (in the case of pumping pressure allowed), the drawback is relatively bulky, pouring concrete need to arrange people to install pipe,
- Q: How the concrete pump truck is fuel tank?
- Concrete Piston Cylinder Piston / Piston Seal Ring No matter what material is used to create a total leakage due to wear, the main cylinder is designed and manufactured in the presence of the oil unit, ie, on each main cylinder,
- Q: 90KW concrete pump should be used in the number of generators?
- To normal long running 90KW concrete pump, 150KW generator is not enough, because the device to start the current
- Q: Is it easy to use fine stone concrete pump?
- , High-efficiency construction equipment; fine stone concrete transport equipment for construction, roads, mines and other works of fine stone concrete or mortar delivery, installation of jet accessories do spray pump for concrete, mortar, refractory materials and landscaping soil spray throwing.
- Q: How to prevent concrete pump blockage
- Improper operation: the operator to concentrate, to avoid abnormal pressure gauge readings; pumping speed to meet the equipment requirements; pumping more than the amount of material can not be lower than the stirring shaft; Tan degree to control in the 80-230mm; downtime control in 15
- Q: Why concrete pump down to play always block the tube
- In addition to pay attention to pipeline laying, there are also in the concrete pouring process should also pay attention to a certain amount of concrete slump can not be too large, 120-140mm on it
- Q: What is the calculation of the unit price of concrete pump?
- Correctly formulating the unit price of construction machinery is an important aspect of controlling the project cost reasonably.
- Q: What is the meaning of cast - in - place concrete secondary grouting?
- Grouting equipment is divided into two kinds of mechanical and manual, the building is more manual, (like the peasant playing the kind of hand pump with pesticide).
- Q: Why is my concrete pump often appear plugging phenomenon?
- When pumping, the operator must observe the remaining material in the hopper at any time, and the material shall not be lower than the stirring shaft. If the material is too small, it will be easy to inhale the air and cause the plugging.
- Q: Can the tower crane be filled with concrete pump tube?
- (9) ribs and wire rope direct contact without protection measures are not allowed to hang; (10) six or more strong winds are not allowed to hang.
Send your message to us
Concrete Pump Truck Camc 8*4 53m Cement Cyh52y
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 1500 PCS/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords