• Concrete Pump Truck Factory Supply 52m Truck Mounted System 1
  • Concrete Pump Truck Factory Supply 52m Truck Mounted System 2
Concrete Pump Truck Factory Supply 52m Truck Mounted

Concrete Pump Truck Factory Supply 52m Truck Mounted

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete Pump Truck Factory Supply 52m Truck Mounted 

Product Details

Basic Info.

Model NO.:CLW Concrete Boom Pump Truck

 

Certification:ISO9000, CCC, TS16949, EPA, EEC, RoHS, CE

Transmission Type:Manual

 

Emission Standard:Euro III

Displacement:8.7L

 

Engine Type:4 Stroke

Payload:25t

 

Fuel:Diesel

Drive Mode:6x4

 

Maximum Horsepower:<200hp

Condition:New

 

Description:Truck Mounted Concrete Hydraulic Pump

Capacity:28cbm

 

Concrete Outlet Pressure:10.5MPa

Feeding Height:Height

 

Fuel Type:Diesel

Tire:9.00r20, 6 Pieces+1 Spare Tire

 

Driving Model:4X2 6X4 6X2 8X4

Warranty:1 Year for 3 Parts(Engine, Gearbox, Axle)

 

Package:Bulk, RO-RO, Container, Naked

Color:Red, White, Green, Black, Gold, Blue

 

Export Markets:Global

Additional Info.

Trademark:CLW

 

Packing:Naked Package and Waxed Before on Board

Standard:ASME Standard, ISO,SGS,BV,CCC,SONCAP AND OTHERS

 

Origin:Hubei, China Made Concrete Mixer Truck

HS Code:8701909000

 

Production Capacity:100000PCS/Year

Product Description




Item

Unit

HB50K

Pumping system

Theoretical throughput

m³/h

120/170

120/170

Pumping concrete pressure

MPa

12/8

12/8

Number of theoretical pumping

times/min

18/27

17/24

 Transport cylinder inner diameter*stroke

mm

Φ260*2000

Φ260*2200

Feeding height

mm

1480

1480

Placing boom

Structure type


6RZ

7RZ

Placing boom max height/depth/radius

m

50/35.71/44.5

50/34.9/45.5

Turning angleof the boom

.

±270

±270

Others

High and low pressure switch-over


Auto

Auto
 
 
 

Concrete Pump Truck Factory Supply 52m Truck Mounted

Concrete Pump Truck Factory Supply 52m Truck Mounted


Q: How to achieve the concrete pump pendulum for the change?
The main cylinder on the concrete pump commutation / swing cylinder commutation is by the proximity switch or trip switch to complete.
Q: What are the precautions for the use of concrete car pumps?
If the amount of large and high floor, then the proposed use of pump to pump, more money to come.
Q: What is the method of washing the concrete pump?
1 direct water law 1) check the cutting ring and the eye plate between the wear and tear, which is decided to directly wash the law of the key to success.
Q: What is the difference between a concrete pump and a concrete pump
The concrete pump is a special machine for conveying concrete. It is equipped with special pipes to transport concrete along the pipeline to the pouring site.
Q: What is the price of concrete pump truck?
The most expensive two or three hundred thousand years, expensive millions.
Q: How the concrete pump truck is fuel tank?
The hydraulic oil (transfer oil) drives the piston movement of the other main cylinder (passive cylinder) by connecting the tubing but causes leakage of the oil due to wear. When the active cylinder piston is running to the bottom, the piston of the passive cylinder has not yet run
Q: What is the history of the concrete pump
And once again this record refresh, and a full wait for 20 years, this time the protagonist has become a Chinese enterprise.
Q: What measures should be taken in the construction of the underground garage
The overall load should be considered, and the load distribution can be optimized by increasing the way of laying the subrack box, less reinforcement and strength of the roof, and reduce the cost
Q: What is the meaning of cast - in - place concrete secondary grouting?
Cast concrete is cast at the construction site. Unlike prefabricated concrete, most buildings are constructed using cast-in-place concrete.
Q: How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
The time required for pouring concrete drains depends on the slump of concrete, the time of plasticizing, the height of pumping, the length of the pipe, the resistance to pumping, the temperature, and so on.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords