CNBM Tons of Potassium Sulfate (SOP) Project with Hydrochloric Acid
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tons of Potassium Sulfate Project
General
CNBM is committed to building the best fertilizer factory for customers. With many years of experience in design and construction of potash fertilizer production line, our team continuously improve on technology and equipments of SOP production line, which can make more economic benefits and extend the lifetime of the equipments. CNBM built the SOP plant in many countries, such as Philippines, Indonesia, India, Egypt, etc. The high quality service has won the public praise for CNBM, the Clients are also willing to repurchase to expand the scale of production line. Although potash fertilizer production line is a mature technology, but CNBM has unique technology which is different from others. The proposal is is for potassium sulfate Plant with the capacity of 100,000MTPA in powder.
Reference list
No. | Case | Date |
1 | The project of SOP in Iran for 40,000 MTPA | In 2017 Year |
2 | The project of SOP granulation in Philippines for 10,000 MTPA | In 2015 Year |
3 | The project of SOP in Egypt for 100,000 MTPA | |
4 | The project of SOP in Egypt for 60,000 MTPA | |
5 | The project of SOP granulation in Egypt for 20,000 MTPA | |
6 | The project of SOP in Egypt for 20,000 MTPA | In 2013 Year |
7 | Technical consultant of Sop in Saudi for 20,000 MTPA | |
8 | Overhaul the furnace in Indonesia | In 2011 Year |
9 | The project of Calcium Chloride in Egypt for 30,000 MTPA | |
10 | The contractor of SOP in Philippines for 20,000MTPA | In 2008 Year |
11 | Overhaul the furnace in Indonesia | In 2007 Year |
12 | The contractor of SOP in Philippines for 10,000MTPA | In 2006 Year |
13 | The equipment supplier of SOP in Indonesia for 10,000MTPA | In 2004 Year |
14 | The contractor of SOP in Philippines for 10,000MTPA |
Scope of Supply
The project basic and detailed engineering design, including the process details, layouts, arrangements, technical specifications, and all other required items technical aspects.
Detailed engineering which will be required for the operation and maintenance of the plant.
Specifications and procurement of equipment as required for the use and operation of process.
Complete technical documentation and instructions required for fulfillment of erection, preparation for start-up, performance testing, operation and any other special equipment.
Equipment packing and China inland transportation and transport from China port to Iran port.
Supervision of Installation, commissioning and start-up of the plant.
Supply of erection material as piping, pipe fittings, valves, flanges, gaskets, bolting material, instrumentation, tubing, paints for protection against corrosion and heat insulation material.
Training of personnel at our site during the unit construction and initial operation.
Exclusion Items in Scope of Supply
Civil and Architecture detail design.
Civil construction, include plant and general buildings; lighting; lightening protection; communication system; road; pavement; etc.
Power substation; transformer system (becoming 380 V; 3 phase; 50 Hz), main-power cable and related system which out of the battery limit.
Emergency power supply system
Laboratory apparatus
Fire-fighting system.
Raw materials and part of utilities for this plant.
Any government permit related to the equipment; system; building utilization.
Local customs clearance and inland transportation to project site for import portion.
Any tax and duty in country where plant located.
Bank charges incurred outside of China
Round ticket of engineer,accommodation,meals, communication for engineer and workers
Working permit and such related expenses for overseas technicians/engineers and project management staffs.
Utilities consumption which used for the installation work including water, electric .etc.
The large equipments and tools for installation, which include crane, welder, cutting machine , forklift hoist ,other tools and assistant workers for installation.
Note: the sand, red brick and wooden for building furnace is not included in supply scope.
Battery Limits
Item | Battery Limit |
Raw Material | |
MOP | At inlet of feed hopper |
Sulphuric acid | Will be provided at the inlet of day tank in battery limits with isolation valve |
Product | |
Potassium Sulphate | Inlet of SOP Product Silo |
HCL | To HCL Pipeline of HCL Tank Farm |
Utilities | |
Compressed air | Will be provided at one point within battery limits with isolation valve |
Process water | Will be provided at one point within battery limits with isolation valve |
Cooling Water | Will be provided at one point within battery limits with isolation valve |
Natural gas | Will be provided at one point within battery limits with isolation valve |
Others
1.1 Chinese codes and standards shall be adopted during Engineering design. All equipment and material shall be made by the manufacturer with in China, including some manufacturer of Sino-foreign joint venture or some manufacturer adopted foreign technology.
1.2 CNBM has capability to make the supervision of installation for the Plant; precondition as below:
All the equipment should be on site;
The civil job should be finished, cleaning the site
The client should give good cooperation on labor and installation tools.
1.3 This proposal is made based on the normal condition of security, exclude Force Majeure. Once we receive Safety Precaution from Ministry of Foreign Affairs and Chinese Embassy, we will not dispatch workers to site and also can not guarantee the schedule.
Pictures
3D drawings :
- Q: Kill, destroy, or wreck machinery?
- Destroy
- Q: what produces the most carbon monoxide animals or machinery (cars, businesses, etc.}?
- Carbon Dioxide, Carbon Monoxide!
- Q: You purchased a piece of machinery for $180,000. The machine's salvage value is $5,000 and its useful life span is 10 years. a) Using Straight Line Depreciation, what is the annual depreciation?b) Write an equation that relates Value to Time using the information given above.c) What would be the machine's value at the end of 6 years?d) What would be its value after 14 years?
- a) (180,000 - 5,000) / 10 = $17,500 per year b) Value = Purchase Price - (Annual Depr. * Years in Service) Not sure if this is what you're looking for. c) 180,000 - (17,500 * 6) = $75,000 d) Anytime after 10 years, value will simply be Salvage Value ($5,000).
- Q: The development trend of mechanical specialty
- Zhaopin experts believe that this phenomenon and construction machinery job requirements of higher professional, so most of the recruitment related professional background of job seekers are closely related. At the same time, mechanical engineering and automation expertise is strong, but also prompted some job seekers to choose the skilled workers, the higher technical requirements of blue collar jobs.
- Q: Please help me with the question above! I really really need it!If you help me thanks! lt;3
- That's incredibly complex. My hospital has literally hundreds of departments. Here's a few (I'm kind of mixing the jobs and departments together): E/R, neurology, adult medicine, child medicine, psychiatric wards and psychiatrists, social workers, counselors, surgeons with various specialties. . . The list is endless. Janitors and maintenance staff. Security people. Receptionists. Pharmacy and pharmacists. Even a gift shop. Nutritionists. Physical rehab people. X-ray techs. Cafeterias and cafeteria workers. Think of anything health related, and if you have a decent hospital in your area - trust me, they will have a department for it. ------------- I guess I didn't address the machinery thing - but same deal - it's an endless, endless list. . . MRI machines, blood pressure machines, even simple scales to weigh people on, centrifuges (blood lab), ovens (patients have to eat you know). Hospitals are just like HUGE technically advanced places where you go in and hope you aren't going to die that day (to me, at least).
- Q: but I'm here in the country?
- Farm machinery is very loud, so it might be that.
- Q: This is what i've got so far:-.horses and machinery do most of the work..one man can till the same field with a group of horses which once required 6.cheaper food from overseas resulted in farms closing down.i only need 2 more.thanks
- Rightio, well, there were the Lowell Mills, which, though gave way to more jobs and actually gave women a role in the workforce, took away the jobs of seamstresses and such, and also took away the at home job of people who simply made their own clothes, because it made it cheaper to just buy mass produced clothes. Your cheaper food claim is inaccurate, actually, because though imported food was cheaper, it was no longer cheaper with the protective tariffs we imposed on it, so that we would buy local food as opposed to foreign goods.
- Q: Please try to explain in detail.Thanks.
- The bacteria would have to acquire mammalian DNA; the easiest way is to have it absorb the DNA into a plasmid (known as recombinant DNA); this can be induced by heat shock treatment after mixing the DNA with bacteria. This has been done with the genes for producing the enzyme, Insulin, in humans, and E. Coli bacteria (however, this insulin structure lacks certain sugars and does not function properly). Once the DNA is in a bacterial plasmid, the bacteria have ribosomes that can generate the proteins.
- Q: pls provide.
- The straight line method of depreciation says there will be a set amount of depreciation each year. For this problem we will need to know what the starting value is, what the residual value is (the lowest amount it can get to) and how many years the machinery will be in use. I am not sure what the $450K is, starting or residual, but lets suppose it is starting, with a residual value of 0 and a 9 year life. (Starting Value - Residual Value) / Life = SLM Depreciation per year. (450,000-0)/9 = $50,000 The residual value tells you that the machinery cannot be depreciated less than 0.
- Q: Material costs, machinery costs, management costs, labor costs accounted for the proportion of construction projects
- (1) labor costs (2) materials (3) mechanical royalties (4) other direct costs (5) subcontract cost (6) indirect costs: indirect costs under the following item: 1, 2, management staff salaries, employee benefits, costs 3, fixed assets 4, low value consumable amortization, office expenses,
Send your message to us
CNBM Tons of Potassium Sulfate (SOP) Project with Hydrochloric Acid
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords