• CMAX TC4808 Tower Crane Gained Approvals of CE System 1
  • CMAX TC4808 Tower Crane Gained Approvals of CE System 2
  • CMAX TC4808 Tower Crane Gained Approvals of CE System 3
CMAX TC4808 Tower Crane Gained Approvals of CE

CMAX TC4808 Tower Crane Gained Approvals of CE

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
4T
Maximum Lifting Height(M):
110M
Rated Loading Capacity:
4T
Span:
48M
Rated Load Moment:
4t

Brief introduction

CNBM covers an area of 320,000 square meters, with registered capital of 120 million Yuan, and has a team of over 1,000 employees, including about 150 technicians and 100 marketing personnel. Advanced coating line, CNC machining center, CNC intersecting line cutter, welding robot and various kinds of detection equipment guarantees high quality products.

Detail of CMAX TC4808

Feature:Tower Crane 

Condition:New         

Model Number:TC4808

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of CMAX TC4808

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 

Specification of CMAX TC4808

Free standing height (m)

31.5

Max height with attachment (m)

110

Working range can be adjustedm

38、43、48

Min working rangem

2.25

Max lifting capacityt

4

Tip load @ 50mt

0.8

Hoist mechanism

Falls

2

4

Lifting capacityt

1.5-2

3-4

Speedm/min

0-80

0-40

Motor

YZRDWF225M-4/8-15/15/3.5KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4/8/16-3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

0-0.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.58

Counterweightt

44m jib length

56

13

15.05

Mast section sizeL×W×Hm

1.6×1.6×3m

Working temperature

-40+60

Total power (KW)

23

Power supply requirement (KVA)

170KVA for generator

Cable type ( within 40 meters from site power source to lower

 electric box of tower crane )

25mm232, 5 cores

Startup voltage & current

380V×95%=361V       170A

Rated working voltage & current

380V                   108A

 

Images of CMAX Tower Crane

 CMAX TC4808 Tower Crane Gained Approvals of CE

CMAX TC4808 Tower Crane Gained Approvals of CE

FAQ about CMAX Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

  

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working

 

Q:Structure

A:Tanks to the advanced design tools, such as electro-mechanical design, CAD design, optimization design, and modular design, the tower crane proves to be a kind of optimum construction equipment that shows not only superb strength, stiffness and fatigue resistance but also outstanding comprehensive performance and reliability.

 

 

Q: can somebody give me good info on this. its a martial art im very interested in leaning and i would like some background info on it first thx
No. You can make an argument that some body type may find it easier, but to say a particular style of martial art is only for one body type (tall skinny) is ridiculous. My White Crane teacher was barely 5'5 and thin, and he had no problem whipping my classmates who are in the 6' height range. Don't worry about your size. Forget the video and find a teacher. Crane is good, but so is any style that is taught by a good instructor. Besides, you are 15 and still have at least 5 more years of growth. If you start now, by the time you reach your max height, you will have been training at least 5 years and I'll bet anything your height is not going to be a concern for you.
Q: Many schools I visited claim to teach styles like white crane and even Okinawa/Japanese Karate has come from white crane styles, however I seldom see techniques, kata, forms, or drills that encompass crane concepts of even crane movements. Why is that? At some traditional schools kung-fu/karate it is easy to see the animal influence but at others there is none. Does this also indicate a lack of understanding or incomplete training. What do you think.
The problem looks more like your issue than anyone else, and in your personal definition of crane. Crane has influences a number of styles and is still quite clearly there, your just choosing not to see it. And you could have found a video on youtube to show your point. Anther failing of yours.
Q: Can you eat those suckers ?
No, no, no.....eat chicken and leave the cranes alone.
Q: Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q: What is the calibration value of a tower crane?
Tower crane calibration value is to benchmark material to be calibrated by standard liquid titration value, calibration to parallel mark three times, take the average value, if the requirement is not strict, error within 3 per thousand, strictly within 1 per thousand.Main performance parameters of tower crane:1. Lifting weight G1. weight G - was the quality of the heavy lift. The unit is t.2. rated lifting weight Gn allows crane lift weights together with the quality of the sum of the spreader.3. maximum weight Gmax - normal work conditions under the crane, the maximum permissible rated lifting weight lifting.Two, range LL - 1. range of level ground when the crane is positioned between the spreader, no-load vertical center line to the center line of the rotary horizontal distance. The unit is m.2. biggest Lmax - crane, jib angle or the minimum car in arm the limit position of the amplitude.3. Lmin minimum amplitude - jib angle or trolley jib in maximum limit position within the range.
Q: so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
The cranes hook to the side of the building and climb the steel frame as it is being built. The crane can only reach a few stories so it has to climb each story's steel frame as it is finished.
Q: Under what circumstances does a tower crane require third party testing?
New clothes, relocation or transformation should be examined by the quality and Technical Supervision Bureau
Q: I've been watching Passions for years and I don't understand what in the world is going on between Fancy and Pretty Crane... what did Pretty do to her??
i really want to know but they have not said yet. and i am a daily passions watcher :] record it every day !
Q: Mother, whose heart hung humble as a button the bright splendid shroud of your son,Do not weep. War is kind. Please help thanks for reading
This is a very critical and harsh poem. Stephen Crane seems to have a more pessimistic outlook on life than other poems he has written, and nowhere else does that pessimistic outlook come through in his poetry than here. The pattern of the poem affixes a cynical, satirical statement after every statement of War is kind. For example, War is kind, Hoarse booming drums of the regiment, little souls who thirst for fight, these men were born to drill and die. The unexplained glory flies above them. Especially when Crane says the unexplained glory flies above them, he is making a powerful statement by questioning whether all the death and destruction is really worth it. This questioning is very important, because many wars are not really for what they seem to be for. There are exceptions of course, perhaps World War II and the fight to end the holocaust, perhaps the Civil War and the fight to end slavery, but for the most part, wars are usually conflicts between cultures over natural resources and disagreements over cultural values. The glory of war, the patriotism, the nationalism; Crane is trying to state that all of these emotions we associate with most wars are really made up so that generally people will feel better about their actions in the long term. Crane questions whether or not war is ever really worth anything to anybody in this poem. Crane clearly does not think so, considering the level of sarcasm he uses throughout the poem, especially at the end when he powerfully states Mother whose heart hung humble as a button On the bright splendid shroud of your son, Do not weep. War is kind. This is very powerful, and Crane very clearly points out that the glory of war and honor of battle are not worth much to a parent whose son has died, or wife whose husband has died, or child whose father has died. Crane's questioning of warfare is very relevant in today's war when we are as a country in what many people would call a meaningless war.
Q: how to make an simple electromagnetic crane?
STEP 1 Buy a Crane Step 2 put a electromagnet on iy Step 3 stick ur name on it you get DIY crane

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords