• CMAX TC4808 Tower Crane Gained Approvals of CE System 1
  • CMAX TC4808 Tower Crane Gained Approvals of CE System 2
  • CMAX TC4808 Tower Crane Gained Approvals of CE System 3
CMAX TC4808 Tower Crane Gained Approvals of CE

CMAX TC4808 Tower Crane Gained Approvals of CE

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
4T
Maximum Lifting Height(M):
110M
Rated Loading Capacity:
4T
Span:
48M
Rated Load Moment:
4t

Brief introduction

CNBM covers an area of 320,000 square meters, with registered capital of 120 million Yuan, and has a team of over 1,000 employees, including about 150 technicians and 100 marketing personnel. Advanced coating line, CNC machining center, CNC intersecting line cutter, welding robot and various kinds of detection equipment guarantees high quality products.

Detail of CMAX TC4808

Feature:Tower Crane 

Condition:New         

Model Number:TC4808

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of CMAX TC4808

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 

Specification of CMAX TC4808

Free standing height (m)

31.5

Max height with attachment (m)

110

Working range can be adjustedm

38、43、48

Min working rangem

2.25

Max lifting capacityt

4

Tip load @ 50mt

0.8

Hoist mechanism

Falls

2

4

Lifting capacityt

1.5-2

3-4

Speedm/min

0-80

0-40

Motor

YZRDWF225M-4/8-15/15/3.5KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4/8/16-3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

0-0.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.58

Counterweightt

44m jib length

56

13

15.05

Mast section sizeL×W×Hm

1.6×1.6×3m

Working temperature

-40+60

Total power (KW)

23

Power supply requirement (KVA)

170KVA for generator

Cable type ( within 40 meters from site power source to lower

 electric box of tower crane )

25mm232, 5 cores

Startup voltage & current

380V×95%=361V       170A

Rated working voltage & current

380V                   108A

 

Images of CMAX Tower Crane

 CMAX TC4808 Tower Crane Gained Approvals of CE

CMAX TC4808 Tower Crane Gained Approvals of CE

FAQ about CMAX Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

  

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working

 

Q:Structure

A:Tanks to the advanced design tools, such as electro-mechanical design, CAD design, optimization design, and modular design, the tower crane proves to be a kind of optimum construction equipment that shows not only superb strength, stiffness and fatigue resistance but also outstanding comprehensive performance and reliability.

 

 

Q: Is tower crane a tower crane?
Yes, the tower crane is commonly known as the "standard" in the industry. It is called tower crane.
Q: For starters im nine and i dont know how to win the claw game ive tried like a million times (exagerating) and i never get it! Can someone be kind and tell me plz! I have seen prizes that i really want and most of them are animals! I am an animal lover and ive seen dolphins or puppy stuffed animals and i never can get them! :( plz help any one if u can i would really appreciate it!
Is this a video or online game?
Q: How do you erect a crane. surely you would need a crane to make a crane.?
Yes you need a crane to erect a crane. A large mobile crane is required to erect a tower crane but the mobile crane is much more expensive so it saves money by only being on site for a few days to erect/dismantle the tower crane.
Q: On Batman Begins what is Dr. Crane's full name?
johnathan crane..no middle was mentioned..if i'm not mistaken...
Q: Can the tower crane personnel install the construction elevator?
As for the hoisting equipment, the licensed crane erection worker can install the construction elevator.
Q: How do tower cranes rise?
The weight and concrete foundation shall be made in advance and marked, and the ground ground endurance shall be no less than 20T per square meter. The chassis and standard sections are then assembled on this basis. The standard section of tower crane is the main part of the main part of tower crane. It is also the main role of heightening the height of tower crane". In the construction process, tower crane accompanied by the rise of buildings, naturally need to heighten. When the tower is hoisted, the upper frame is raised upwards with the jack up, so that there is a space between the tower body and the frame, and the standard section of the tower body is installed in the space. In this way, the purpose of the tower crane is realized.
Q: im doing and essay and i need help on what motivated him to write this poem. im in 9th grade
War Is Kind Stephen Crane
Q: I'm talking about one of the ones where the cabin and the worker is high up in the air. You cant exactly remove a part of the bottom of the cranes structure because it would fall on top of you but you cant remove the cabin because its so high up and what can get up that high to remove it except another crane BUT how did that get built ?Thank you.
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q: are crane flies the most venomous insect in the world,or is this just an urban myth?
Chuck Norris is the most lethal of all!!!!!!!!!!!!!!!!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords