CMAX HOT SELLER TOWER CRANE TOPKIT TC5010
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
|
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: Hello, i am goin in on Dec 5 to write the millwright C of Q for the 3rd time. On the test there was a question that went something like this The crane is rated 40Ton, with a boom lenght of 40ft and at an angle of 70 deg. The jib is 8ft long on a 10 deg angle. What is the sefe working load. The numbers are not correct but that is how the question is phrased. Please help me with the formula. I cannot find it anywhere.
- Safe Working Load Formula
- Q: Can anyone give me a very accurate slow step-by-step video of how to make the prison break crane perfectly?Its hard to follow the directions on a diagram online so I need a good video.
- They used a helicopter to break out of prison. Breakout with Charles Bronson and Robert Duvall (1975)
- Q: More specifically, do Sandhill Cranes eat squirrels?
- No! They eat fish and amphibians. .
- Q: I see crane flies everywhere but I've never seen them eat anything.
- Occasionally, its larvae will feed on mosquito larvae. Crane fly larvae mostly feed on roots of forage crops, turf grasses and seedling field crops.
- Q: Who invented the tower crane, please?
- In 1923, a prototype of modern tower crane was built. The first relatively complete modern tower crane appeared in the same year. Our tower crane started from Shanghai in 1950.
- Q: I give up...Somebody who understands The Decemberists please tell me what a Crane's Wife is and what the song is about. I love the song, I sing along loudly, but I don't have a clue.
- I found this on wikipedia. The Crane Wife is an old Japanese tale. While there are many variations of the tale, a common version is that a poor man finds an injured crane on his doorstep (or outside with an arrow in it), takes it in and nurses it back to health. After he releases the crane, a woman appears at his doorstep with whom he falls in love and marries. Because they need money, his wife offers to weave wondrous clothes out of silk that they can sell at the market, but only if he agrees never to watch her making them. They begin to sell them and live a comfortable life, but he soon makes her weave them more and more. Oblivious to his wife's diminishing health, his greed increases. He eventually peeks in to see what she is doing to make the silk she weaves so desirable. He is shocked to discover that at the loom is a crane plucking feathers from her own body and weaving them into the loom. The crane, seeing him, flies away and never returns.
- Q: What are the types of tower cranes?
- The tower crane is divided into: fixed tower crane mobile tower crane self lifting tower crane mobile tower crane is divided into: rail type tire type automobile type self lifting tower crane is divided into: attachment type climbing uses: concrete with cage for loading and unloading installation general building mixed
- Q: Where do Cranes (the bird), typically live in ohio?
- yes
- Q: how do you say paper crane in japanese?
- Origami is paper folding in general, whereas 折鶴 おりづる oridzuru means folded paper crane, or in context, people just use tsuru (crane).
Send your message to us
CMAX HOT SELLER TOWER CRANE TOPKIT TC5010
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords