Chinese C6 LED Indoor/Outdoor Halloween Lights
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description
Trade assurance new C7 outdoor and indoor LED holiday lighting.
Specification
Light color | Red/Yellow/Bule/Green/White/Warm white/Orange/Purple/Pink/RGB |
Wire color | green/black/white |
Bulb spacing | 6inch(as your special order) |
Packaging Details | color box/mail box/white box |
Light source | Incandescent / LED |
Lifetime | 2000 hours |
Cetification | UL/CE/CSA/SAA |
Work environment | Indoor/Outdoor |
Wire Diamater | 14/18/20AWG |
Input voltage(v) | 110/220V |
Warranty(years) | 2 years |
Working Temperature | -20℃~85℃ |
Lamp body material | Copper and plastic |
Packaging & Shipping
1. Inner packing: opp bag or color box
2. Outer packing: carton
3. Shipping: depends on customer's requirements
Application
Company Information
CNBM,China National Building Material Group Corporation is the largest group corporation in China for building materials and equipment industry. It was incorporated in 1984 upon the approval from the State Council. It is one of the 143 large-scale groups under the administration of the State - owned Assets Supervision and Administration Commission of the State Council. There are over 300 subordinate factories and companies in our Group; 2 public listed companies in Hong Kong, 4 Public listed companies in China mainland; 11 publicly listed companies in which CNBM has a substantial percentage of shares. The business scope of CNBM covers from manufacturing and sales of building materials to scientific research and design, engineering, import and export trade. In many of these fields, CNBM is playing the leading role.
Warmly welcome your any inquiries or request ! You will be impressed by our superior quality, quick delivery date and attractive price. Contact us now!
Our Services
1.OEM Service
Your own design is appreciated; we can make the approval sample according to your golden sample.
2. QC Service
a) Before the order to be confirmed, we should check the material & color of fabric by sample which should be strictly.
b) We will be tracing the different phase of production from the beginning.
c) Every bad quality will be checked & cleaned before packing.
d) Before delivery clients could send one QC or point the third party to check the quality.
e) We will try our best to help clients when problem occurred.
3. After-sale Service
a) EXW, FOB, C&F are also available for us.
b) If the products need certificate, we can also provide.
FAQ
1.Q:What's your payment terms?
A: T/T or L/C
2.Q:When could you send me the samples
A:2-3days
3.Q:Can I customize the strip length?
A: Yes
4.Q:Do you also sell other kinds led lights?
A:Yes, we also supply led bulbs, spotlights, led light, led tube light ,ceiling light etc.
- Q:What typeof lighting is best for fish aquarium
- i have a marineland led setup on a 55 gal freshwater, easy to maintain,plenty of light,no bulbs to replace.
- Q:Can anyone explain me what exactly does Sub-light and Sub-light communication means ?
- Sub-light just means slower than the speed of light. So sub-light communication means any communication that is slower than the speed of light. eg writing a letter to someone.
- Q:Can light spot move faster than light itself?
- Give 10 points to Kirchwey. Imagine a laser that spins around like a lighthouse. Point it so that once every revolution, its would point at the moon. Given that the moon's distance from earth is ~1.25 lightseconds, all the laser needs to do is exceed a speed of 1/ (2π *1.25 seconds) = 0.127 revs/second or once every 7.8 seconds for an observer on earth to say the dot on the moon was exceeding the speed of light. If you were on the moon, you would also conclude that the dot exceeded the speed of light, but you have to take into account the speed of light to make that calculation. (I only answered because you have different answers from two reputable people).
- Q:I have a venza and i change the lights to hid lights now i want to put the original lights on it again but i cant remember wich ones go to the fog lights and the headlights can someone help me out with this thank you
- the head lights will fit in the head light connectors, and the fog light bulbs will fit in the fog light connectors.
- Q:Solar LED garden lights technical parameters in the 40WP is what it means
- Wp is the abbreviation of the peak power of solar cells, that is, Wp = Wpeak
- Q:By law when are you suppose to turn your lights on?
- This is UK law: You MUST - ensure all sidelights and rear registration plate lights are lit between sunset and sunrise - use headlights at night, except on a road which has lit street lighting. These roads are generally restricted to a speed limit of 30 mph (48 km/h) unless otherwise specified - use headlights when visibility is seriously reduced (see Rule 226). Night (the hours of darkness) is defined as the period between half an hour after sunset and half an hour before sunrise). (Rule 226) You MUST use headlights when visibility is seriously reduced, generally when you cannot see for more than 100 metres (328 feet). You may also use front or rear fog lights but you MUST switch them off when visibility improves You MUST NOT use front or rear fog lights unless visibility is seriously reduced (as they dazzle other road users and can obscure your brake lights. You MUST switch them off when visibility improves.
- Q:Does gravity have any impact on the speed of light? For instance, suppose light from a distant star reaches Earth after 10 minutes. Could it be possible that due to the gravitational force of a celestial object in the path of the light, there is delay in light reaching us? What are the factors that affect the speed of light?
- i'm no physicist, so i will in basic terms grant you with a lay guy's view from what i examine through the years. fact: It has lengthy been prevalent that gravitational forces interestingly act immediately over the completed universe. it takes approx 8 minutes for the gentle from the daylight to achieve earth yet we experience the gravitational effect almost with out delay, for this reason it style of feels the speed of gravity is a few distance more advantageous than the speed of sunshine. certainly it is been reported that the speed of gravity and gentle were an identical on the starting up of the tremendous bang in spite of the undeniable fact that the speed of sunshine is slowing down in view that. this concept if genuine it is going to replace the way we view physics: a million/ for starters c isn't consistent as einstein led us to trust. 2/ possibly using this understanding lets produce a propulsion gadget in holding with gravitational ideas and go back and forth the universe at warp speeds many situations that of c. 3/ interior the distant destiny if gentle is slowing down this universe is going to be an fairly darkish position. as for the planets dropping there orbit because the daylight with out delay vanishing i ask your self ought to they initiate orbiting jupiter or our alledge binary brown dwarf movie star. or ought to there be a residue effect from the gravitons debris? taking in account that those are very sturdy theories (yet theories under no circumstances the a lot less) it ought to look that you're brilliant examine the area below for further information.
- Q:how do you take light photography on a nikon D3100, HELP!?!
- All photography is light photography.
- Q:Court lights 70w how much money
- How much money you want to give you what grade of the lights, if blindly pursue the low price
- Q:Gen `1:3 And God said, let there be light and there was light. but in Gen 1:16 And God made two great lights, the greater light to rule the day, and the lesser light to rule the night.......So what light is it when he said let there be light? is not the sun/stars....what then?
- relax, it was just some crazy gramppa trying to explain where light came from. anyway, obviously the moon does not emit it's own light.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Chinese C6 LED Indoor/Outdoor Halloween Lights
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords