• building steel hex nut casted/formwork tie rod nut/formwork building systems 5 System 1
building steel hex nut casted/formwork tie rod nut/formwork building systems 5

building steel hex nut casted/formwork tie rod nut/formwork building systems 5

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

color:
galvanized or self color

Packaging & Delivery

Packaging Detail:Crates,or Pallets, or Big bags,or Customed following customer
Delivery Detail:20days

Specifications

1.surface galvanized or self color
2.process casting
3.size custom made
4.material casted steel or ductile iron

1.surface galvanized or self color
2.process casting
3.size custom made
4.material casted steel or ductile iron  

5.Supply Ability: 50000 sets per month

6.Custom Made: Available

Our main products involve the Wing Nut, Formwork Clamp,  Nut, Base Jack Nut,   Slope Plate, Walter Plate, Pressed Plate,  Tie Rod, Scaffolding Coupler, Round Coupler, Pins, Washers, Steel Cone, Iron Cone, Concrete parts, Lock Nut, Flanged Wing Nut, Anchors, Lifting Anchors, Sockets, Lifting Clutch, Recess Former and other casted and pressed Formwork Accessories, Scaffolding Accessories etc.

   Our selling network spread all over the world, the current main customers come from the Europe, the Middle East, the America and the Africa.

1. We are one of the biggest factory on formwork and scaffolding accessories

2. We have more than 10 years experience on manufacturing and exporting.

3. We have the advanced equipment and process flow and excellent quality control.

4. We have the competitive price.

5. We have the completed sales and service team so that we can offer the best service



Q: What issues need to pay attention to the construction of high-level scaffolding
The use of the end of the scaffolding (including the construction of accessories) should be returned to the library, classified storage. Open dumps, the site should be smooth, good drainage, under the support pad, and covered with a sheet, accessories, parts should be stored indoors. Wuxi Dongfang scaffolding scaffolding factory products strictly according to JOD-1999 and OD15001-1205 standards, a type of mobile scaffolding scaffolding, scaffolding, roulette scaffolding, scaffolding and scaffolding accessories.
Q: Scaffolding installation and precautions?
The backing plate and the base should be placed on the positioning line accurately.2, when the erection of the column, the outer diameter of the steel pipe is strictly prohibited, the adjacent column of the docking fasteners shall not be in the same height, staggered distance should meet the structural requirements.
Q: How to calculate the fastener type steel pipe scaffold
The provisions of 1.1.4 in steel pipe scaffold structure thin-walled steel structure design, involved in the weld connection, the stability coefficient of the axial compression members, should use the "technical specification for Cold-Formed Steel Structures" (GBJ18-87).1.1.5 provides for the design and calculation of scaffolding:(1) the calculation of the overall stability of the frame (can be converted into the calculation of the stability of the opposite pole);(2) checking the strength, stability and stiffness of horizontal bar;(3) calculation of strength and stability of attached and continuous wall;(4) anti overturning checking;(5) checking of foundation and supporting structure.
Q: The role of the external scaffolding and the relevant provisions?
Scaffolding outside the building in the construction of the building is an indispensable important tool for erection. Its role: first, can make the construction personnel in different parts of the operation of the high; two is to ensure the safety of construction personnel in the high altitude operation
Q: What are the dangers of scaffolding
The scaffold and bar for use of instability, binding is not strong or break and fall; the improper operation of the impact and accident etc.;Improper operation generally have the following situations:A. overexert, causing physical instability;B. in the frame and pull the car back walking;C. crowded collision;D. many people handling or installation of heavier components;Ice and snow on the E. frame is not clear, causing the slide.
Q: The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
Schedule A.0.2 role: the calculation of scaffolding, the need to calculate the bearing capacity of the scaffolding
Q: What are the main safety problems when dismantling the scaffold
3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
Q: I had my scaffold done on friday, and it's still very sore and swollen. My boyfriend's accidentally caught it a couple of times but not badly and i was wondering if the pain and swelling is normal and if there's anything i can do for it. I've been cleaning it with savlon and have been careful with it x
u shud check f its swollen and if there is more painin go to the doctors
Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
Q: Bowl buckle type steel pipe scaffolding should set up a few people
The utility model relates to a bowl buckle joint which is composed of an upper bowl buckle, a lower bowl buckle, a cross bar joint and a limit pin on the upper bowl buckle. A limiting pin is arranged on the vertical rod to weld the lower bowl buckle and the upper bowl buckle. Welding plug on the bar and the diagonal bar. When the utility model is assembled, the transverse rod and the inclined rod are inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords