linear air vent diffusers for air conditioning use
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification of Air Diffuser
Supplying Air Diffusers
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed
-Powder Coated RAL 9010/9016
Usage of Air Diffuser
The grille is suitable for ceilling sidewall, soffit or cill mounting and may be used for supply or extract applications.
Typical installations include offices, shops, hotels and most commercial or industrial buildings.
Available as standard in white polyester powder coat finish.
Other polyester powder coat finishes are also available as an option.
FAQ of Air Diffuser:
1, What's size do u have for round type diffuser?
A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm聽
2, Do u still have other types ?
A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc
3, What's the most early delivery time?
A: Within 25 days for each 40'fcl
- Q: Home to use to warm, but want to use Finney's cooling water heater, do not know how to combine?
- To warm the general use of fireplaces, water heaters for life hot water, does not affect. If you want the two sets, it involves the system integration, and need to see your system and want to achieve the function to match the controller and control valve, and for the HVAC professional is not a complex State sleep pumpkin mixed, but do not understand or very hard....
- Q: The working principle of the heat transfer station
- A heat source through the pipeline to the heat transfer station, and into the heat exchanger, heat exchanger through the heat exchanger, the primary heat exchange to the secondary heating pipe, the secondary heating pipe leads to hot users.
- Q: Which man knows the construction of temporary heating program, please tell me ah! Thank you!
- Try to avoid coal heating, you can use some safe electrical heating equipment, such as: air conditioning, silicon hot oil heater, electric heater, solar fan, etc....
- Q: Electric heating, is buried or how, how to do the big wire
- Look at how much power you use for the heating stove
- Q: To warm the system main material and auxiliary materials which include what
- 1, to warm the main material parts are: wall-hung boilers, heating the main channel, sub-catchment, to warm pipe, such as temperature control. Large houses are also equipped with heating circulating water pump (from the pressurized effect), constant temperature mixing valve (energy saving and good comfort) and so on. These devices are the main part of the warm floor, but also to warm the main supplies, especially the boiler and to warm the tube, the basic occupation of the vast majority of the warmth of the ridge to bogey Yao Xu surprised only super-fee; Some are: reflective film, extruded board (insulation board), steel wire mesh, the border insulation strips, to warm the staples, insulation casing, raw materials, such as ball valve. The price of these auxiliary materials is not high, more varieties, the market is complex, but these accessories are warm to install the important details of the heating system to the energy-saving effect and insulation effect is to warm the auxiliary materials are inseparable.
- Q: What is the basic task of heating engineering? The heating system is composed of some parts
- The basic task of heating engineering is to meet the needs of the heat load components: heat, heat, hot users
- Q: Home gas boiler why the circulating pump is always non-stop turn?
- Gas boiler water pump will automatically start and stop according to the water temperature, under normal circumstances during the water pump is kept non-stop. Because the pump operation can make the system temperature uniformity, the temperature inside the furnace can reflect the system temperature. But not all brands of fireplaces are so. So the pump motor is not working properly.
- Q: The pressure to look at the floating spring faint tempered tents touching up in the 1.5 or so, after the opening of the heat will be similar to the heat will see the temperature will rise but it is not put out hot water, and the ground is not hot feeling. But also to open what valve? What is the black valve below the machine? More
- Any boiler before starting the machine to pay the water to see if the water pressure gauge pointer is between 1 - 1.5bar. If the water pressure in the above range, open the gas pipe valve, power on, set the machine in the winter position, set the heating temperature, usually the upper limit of the floor heating temperature can be set to 55- -60 degrees Celsius, radiator heating up to 75-85 degrees Celsius (if the radiator is not anti-hot protection, it is best to set the temperature a little lower). After normal ignition do not have to ignore it. Bath: see the water pressure gauge pressure is normal, open the gas valve, power on, set the machine in the summer position (if it is winter, that is set in the winter position), the hot water temperature is set at 42-45 degrees Celsius Between, open the hot water head, until the water temperature is appropriate and stable after you can start bathing. Antifreeze: water pressure gauge pressure is normal, the machine power plug (do not boot), the gas path open (must ensure that the gas source) can be. The above operation applies to Faroe, Haas, Ariston, Bosch, Squirrel, Beretta and other brands of boiler
- Q: What does building HVAC include?
- Heating (heating) ventilation air conditioning
- Q: Radiator parallel system how to take pictures
- The installation of the radiator is divided into two forms: the installation and installation of the radiator. The installation steps include the installation of the pipe, the installation of the radiator, the installation of the boiler, the pressure test and the customer acceptance. Trouble, need to slot and install the set of water, for the decoration of the housing, the general choice to install the radiator, installed both convenient and not damage the indoor decoration effect. 1. Laying the pipeline in advance with the customer to communicate with the location of the radiator after the installation of the need for the layout of the pipeline, the pipeline is generally in the ceiling, baseboard and other hidden places, the laying of the tube as much as possible not to affect To the interior decoration or take up too much space. 2. Install the radiator in the process of installing the radiator to the radiator to be stable, and to use the level of measurement to see if the installation is smooth, and then the valve connection and inlet and outlet valves connected, after checking the correct The pipe clamp is reinforced. 3. Installation of the wall-mounted boiler The installation of the boiler should be noted that with the open line and electrical equipment separated from the flammable and explosive materials can not be on the hair to promote the safety of the body, Table and gas stove should be more than 300mm distance. 4. Stress test and customer acceptance Construction workers in the pipe stamping test when there is no run, run, drain, drop and other phenomena, confirmed by the customer after the inspection can be accepted.
Send your message to us
linear air vent diffusers for air conditioning use
- Loading Port:
- Ningbo
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 999999 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords