Ventilation Aluminum Insulated Flexible Duct
- Loading Port:
- Guangzhou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 80000m m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of Aluminum Flexible Duct for HVAC:
Aluminum Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible, it is easy to run around and through obstacles in the building.
Flexible Duct Usage:
-Applied in air conditioning/ventilation systems
-Tear and puncture resistant
-Corrosion resistant
-High flexibility
-Convenient installation
-No toxic gas emission
2.Main Features of Aluminum Flexible Duct for HVAC:
1. It's a range of fully flexible un-insulated aluminum PVC laminated ducting, it is easy to connect to ducting
2. Highly flexible
3. Excellent resistance to chemicals
4. Small bending radius
3. Aluminum Flexible Duct for HVAC Images
4. Aluminum Flexible Duct for HVAC Specification
PROPERTIES | VALUE |
DIARANGEMETER | 80~1200MM(3”~48’’) |
TEMPERATURE RANGE | -30~+250℃ |
VELOCITY OF AIR FLOW (MAX) | 20 m/s |
WORKING PRESSURE | 2500 Pa |
BENDING RADIUS | 0.54*D |
STANDARD LENGTH | 7.6M OR 10M |
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
①What’s the Application for the products?
Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible,it is easy to run around and through obstacles in the building.
② What’s the Advantages for the products?
No need special tools for cutting
In case of fire no toxic gas are emitted
The product have been successfully tested for fire resistance
Can be bent in any direction
③ How long can we receive the product after purchase?
In the purchase of product within two working days, We will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 7 to 10 working days can be served.
- Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
- External wall insulation should pay attention to what the details?
- Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
- Common scaffold brace is the U-type care, "construction of fasteners steel scaffolding safety technical regulations" (JGJ Gong Gong Duo Ji-tao pan Revenge two 130-2011) provides "adjustable support bearing capacity design value is not Should be less than 40kN, the support plate thickness should not be less than 5mm ", the general calculation using 30kN.
- Q: Air to water heater host and air conditioning host is not the same
- You can try asphalt! Is the kind of paving the way! Very useful!
- Q: Air conditioning ventilation when the sound is a big reason
- According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
- Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
- You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
- Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
- The general level of more than 12 layers when you need to use.
- Q: Air conditioning machine work when the sound is too much reason
- This is based on the density of benzene board decision, not what you said, know it buddy.
- Q: What is the whole heat exchange fresh air ventilator?
- Depends on the main control panel is not cold and warm, single cold common motherboard. Only a generic motherboard can be changed. In the single cold air-conditioning on the outdoor machine to install the appropriate specifications of the four-way valve, adjust the amount of refrigerant to the appropriate level can be.
- Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
- 2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
- Q: Ventilation is very good, why still have to install fresh air system
- Also known as foam board, EPS board, is containing volatile liquid blowing agent of the polystyrene beads can be preheated by heating, heated in the mold and the formation of white objects
Send your message to us
Ventilation Aluminum Insulated Flexible Duct
- Loading Port:
- Guangzhou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 80000m m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords