• Flexmaster Flexible Duct - Aluminium Flexible Duct in Low Price from China System 1
  • Flexmaster Flexible Duct - Aluminium Flexible Duct in Low Price from China System 2
  • Flexmaster Flexible Duct - Aluminium Flexible Duct in Low Price from China System 3
Flexmaster Flexible Duct - Aluminium Flexible Duct in Low Price from China

Flexmaster Flexible Duct - Aluminium Flexible Duct in Low Price from China

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Pictures of aluminium Flexible Duct

Aluminium Flexible Duct in Low Price from China

Aluminium Flexible Duct in Low Price from China

Product Description of aluminium Flexible Duct:

Features and Specification:

-Applied in Heating, Ventilation and Air Conditioning

-Non-insulated and insulated Flexible Duct offered

-Up to 150 and 250 high temperature

-Fire Retardant

-Corrosion Resistant

-High flexibility

-Convenient installation

-Non- toxic


Introduction of aluminium Flexible Duct

Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building. 

FAQ of aluminium Flexible Duct:

1.             What teperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.              Lead time: 10 days

 

 

 

 

Q: What is the effect of concrete pouring on the construction quality?
The use of the trench connection to check the pipe sealing surface is smooth, smooth, no burr. Whether the sealing surface of the sealing ring is scratched, whether the length of the sealing section of the pipe meets the requirements. These three points to ensure that certainly not leaking.
Q: How to optimize the construction management to improve the quality of construction projects
flexible waterproof casing for seismic fortification of the region, rigid waterproof casing for the pipeline to touch the tattoo Du Gu Sen single point of the wall does not bear the vibration of the building
Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
Q: On the classification of car repair, the best details Thank you Such as sheet metal workers, car circuits, etc. Thank you
There are also special materials such as bamboo, so rare, no longer introduced
Q: How to effectively deepen the construction process management to improve the quality of construction projects
Abstract: The thermal degradation and catalytic degradation of waste polystyrene plastic were carried out
Q: CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
Q: The first generation of the tube is that year out?
In general, there is also a strong ability to resist, it is likely that there may be cracking
Q: What is the difference between the D-LD2000 clamp-type flexible fittings and the KRJ-type clamp-type flexible fittings?
Polystyrene board in the basement wall from the role of waterproof protective layer is to prevent the backfill due to external forces on the destruction of the waterproof layer. That the use of multi-layer board bear two Cao Dutch 丨 sell Zhatai Chun Jun can not. Because the deformation capacity of polystyrene board is relatively large. And the deformation capacity of the multilayer board is small.
Q: Steel Reinforced (HDPE) Polyethylene Helical Corrugated Tubes Warm-Fused-Belt Is Connected or Bonded with Rubber Rings? Ask what?
EPS board (also known as benzene board) is made of polystyrene board abbreviation. There is raw materials through pre-hair, curing, molding, drying and cutting made. It can be made into different density, different shapes of foam products, but also can produce a variety of different thickness of the foam sheet. Widely used in construction, insulation, packaging, refrigeration, daily necessities, industrial casting and other fields. Can also be used to display the venue, merchandise cabinets, advertising signs and toys manufacturing. At present, in order to meet the national building energy efficiency requirements are mainly used in wall insulation, external wall insulation, to warm.
Q: To ask why the use of clamps connected to the spray pipe after the flush again after the water there will be a lot of hook link position leakage phenomenon? Thank you! The The
The use of air conditioning precautions in the instructions have been introduced on the plain, but very few consumers will carefully read the instructions

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches