All Aluminum Alloy Formwork Light Weight
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 150000 /month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
SNTO Al-Formwork Benefits
1. Light weight, high strength
The data has proved that the flexural strength of aluminum is triple higher than ordinary steel. With weight of 25KG/square meter,Aluminum formwork is the lightest formwork for construction, which makes for easy handling, but bearing 64KN/square meter.
2. Various sizes, high accuracy
The construction drawing is designed with strict structure, with little measurement error and high accuracy, which is very suitable for high rise buildings.
3. Safe and convenient construction
High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training.
4. Long time used
With the lowest average lost, aluminum formworks can be used up to 300 times.
5. Wide range used
The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.
6. Excellent quality
The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.
7. High Efficiency
According to different climatic conditions, the formworks can be removed in 18-36 hours.
8. Recyclable value
The used aluminum material is of greater recyclable value, several times higher than steel.
9. Independent support system
The gap between the formwork support is totally enough for passing, moving, and pulling.
10. Dependable safety, environmental
The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.
Why choose us?
1. Easy transaction & pleasure cooperation are our tenets all the time.
2. Every detail will be emerged in your brain clearly.
3. Don't worry about anything, we will figure it out for you with our professional technology & excellent service.
4. We aim at satisfy your demands.
5. Never the best but the most suitable plan to you, for it we are willing to put every effort determinedly.
- Q:What is an integrated climbing frame? What are the works? What are the advantages
- . It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q:The difference between the scaffold and the scaffold
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
- Q:The whole concrete wall climbing frame or good use of steel scaffolding
- It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
- Q:Advantages and disadvantages of climbing frame and floor type scaffold
- 3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
- Q:What are the maintenance and maintenance of hydraulic climbing formwork
- Whether or not the double screw nut is used on the important bolt connection, the degree of the fastening, whether the steel bar is pressed according to the rules, and the steel wires are bundled together
- Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
All Aluminum Alloy Formwork Light Weight
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 150000 /month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords