• adjustable base jack/leveling screw jack/base plate System 1
adjustable base jack/leveling screw jack/base plate

adjustable base jack/leveling screw jack/base plate

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

specification: Φ34*3.5/4.0mm, Φ38*4*500, Φ48*4mm hollow base jack,

                       Φ36*450mm solid base jack, length is upon your request

                       we support customized products, just providing your drawings

base plate: 150*150*5 /6mm, 120*120*4/4.5/5 mm , 100*100*4 mm

material: carbon structural steel Q235 or Q345

surface finsh: hot dip galvanized,electro galvanized, painted, self color etc

 

Q: How to solve the problem of scaffold pipe repair
In the construction of the bending, torsional irregular steel tube to adjust the straight, mechanical transmission, reasonable structure, high efficiency, safe and reliable
Q: What is a bowl buckle scaffold?
The buckle type multifunctional scaffold is a new type scaffold which is developed on the basis of absorbing the advanced joint and fittings of the same type of scaffold in foreign countries and combining with the actual situation of our country.
Q: Fastener type steel pipe scaffold accessories
Wall pieceEven the wall piece the upright rod is connected with the main structure together, available steel tube, fastener or embedded part. Rigid wall, also can be used as a flexible reinforced wall connecting piece of the tie bar.
Q: What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q: If I know the length , width and height of the area for the scaffold, how do I calculate the tonnage?
tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
Q: Are the terms quot;nuclear matrixquot; and quot;nuclear scaffoldquot; interchangeable? I know that when we talk about DNA compaction we say that MARs on the DNA attach to the nuclear scaffold. I am wondering if the scaffold is just a specific part of the matrix??
For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
Q: A 520 kg box sits 1.4 m from the left end. What is the tension in the right hand side wire? (g = 9.8 m/s2) ____________ Newtons
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q: The basic form of external scaffolding
The limit pin of the upper bowl buckle and the upper bowl buckle is arranged on the steel pipe upright rod according to the 60cm distance, wherein the lower bowl buckle and the limit pin are directly welded on the vertical rod. When the utility model is assembled, the notch of the upper bowl buckle is aligned with the limiting pin, the cross rod joint is inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated. Bowl buckle joints can be connected at the same time 4 bars, can be perpendicular to each other or deflect a certain angle.
Q: three examples of scaffolding, thanks
Google these 1) Independent scaffold 2) Putlog scaffold 3) Birdcage scaffold
Q: hi, ive had my scaffolding for a little over a month now, and one of the holes has started going really weird. on the top, its swollen and sore on one side, and on the bottom, its the same but on the opposite side. not sure if its infected ir being rejected by ear, which ive heard can happen. i would like to keep it in if possible,as i love it. any help welcomed :) thanks xx
I've also had my scaffolding and I had the same issue. It was totally normal, I went back to the peircing place and asked if this was regular for the piercing. They said it was and to proceed with the cleaning process etc. they said it just has scabs because its healing :)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords