• 4 Way Curved Balde Air Diffusers air conditioner System 1
  • 4 Way Curved Balde Air Diffusers air conditioner System 2
  • 4 Way Curved Balde Air Diffusers air conditioner System 3
  • 4 Way Curved Balde Air Diffusers air conditioner System 4
  • 4 Way Curved Balde Air Diffusers air conditioner System 5
  • 4 Way Curved Balde Air Diffusers air conditioner System 6
4 Way Curved Balde Air Diffusers air conditioner

4 Way Curved Balde Air Diffusers air conditioner

Ref Price:
get latest price
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
50 pc
Supply Capability:
999999 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification of Air Diffuser

 

Supplying Air Diffusers 
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed 
-Powder Coated RAL 9010/9016


Data Sheet


 1

Item

HVAC aluminum air conditioner grille

 2

Materials

Extruded Aluminum alloy (6063-T5)

 3

Blade

Blades in 45°from aluminum profile or as customer’s requirements

 4

Bar spacing

30mm as standard or as customer’s requirements

 5

Materials

0.8mm, 1.0mm, 1.2mm, 1.5mm or according to the customers’ 

 6

Surface Finish

Powder coated, Anodized , PVDF, Mill finish.

 7

Size 

Width x Height, any sizes available

 8

Powder for Finish

Environmental protection and non-toxic, and Color to keep 5 -10 years.

 9

Color

Refer to RAL colors swatch or customized colors available

 10

Design

Drawings designed according to the customers’ requirements

 11

Payment terms

T/T, L/C, PYAPAL, etc.

 12

Delivery time

Usual 15-20 work days for a 40GP container 

 13

Package details

Bubble wrap + Cartons for FCL,  Bubble wrap + Cartons + Wood-box for 

 14

Mesh

Stainless steel security mesh, Aluminum security mesh

 15

Type

Fixing and adjustable installation

  

Usage of Air Diffuser


· Adjustable aerofoil-designed blades provide users with the flexiblility to cater to their personal needs. Blades are individually adjustable from the face of the grilles.

· From extruded aluminum of minimum 1.0mm thickness. All grilles are manufactured from highly corrosion resistant heavy gauge aluminum.

· Corners reinforced with welded corner pieces for robust handling during installation. 

· Standard powder coated white finish. Painted finish will be enamel coated and oven baked. 

· Anodised finishes and other finishes are also available upon request.


 

4 Way Curved Balde Air Diffusers air conditioner

4 Way Curved Balde Air Diffusers air conditioner

4 Way Curved Balde Air Diffusers air conditioner

4 Way Curved Balde Air Diffusers air conditioner

4 Way Curved Balde Air Diffusers air conditioner


Production Line

4 Way Curved Balde Air Diffusers air conditioner

4 Way Curved Balde Air Diffusers air conditioner


FAQ of Air Diffuser:

 

1, What's size do u have for round type diffuser?

A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm

 

2, Do u still have other types ?

A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc

 

3, What's the most early delivery time?

A: Within 25 days for each 40'fcl

 

Q:Liquefied gas can be installed to warm it? And natural gas to install what is the difference between the safety factor, the amount of engineering and other aspects of contrast, liquefied gas will not trouble?
It is recommended not to liquefied gas, its concentration is relatively large, that is, the same cubic liquefied petroleum gas with the pipeline for the rush stinging fumigation smoked gas, liquefied petroleum gas combustion power is a few times the pipeline gas The boiler combustion system is set up in accordance with the pipeline gas. The use of liquefied gas will cause damage to the boiler parts.
Q:Bathroom heating tube plus wall-mounted small basket, what spare parts? What are the requirements of the connection, are directly from the bottom into the impact of hot effect?
How far is your small basket with the position of the water separator? Aluminum plastic parts are essential, outside the wire elbow / direct also,
Q:Radiator parallel system how to take pictures
The installation of the radiator is divided into two forms: the installation and installation of the radiator. The installation steps include the installation of the pipe, the installation of the radiator, the installation of the boiler, the pressure test and the customer acceptance. Trouble, need to slot and install the set of water, for the decoration of the housing, the general choice to install the radiator, installed both convenient and not damage the indoor decoration effect. 1. Laying the pipeline in advance with the customer to communicate with the location of the radiator after the installation of the need for the layout of the pipeline, the pipeline is generally in the ceiling, baseboard and other hidden places, the laying of the tube as much as possible not to affect To the interior decoration or take up too much space. 2. Install the radiator in the process of installing the radiator to the radiator to be stable, and to use the level of measurement to see if the installation is smooth, and then the valve connection and inlet and outlet valves connected, after checking the correct The pipe clamp is reinforced. 3. Installation of the wall-mounted boiler The installation of the boiler should be noted that with the open line and electrical equipment separated from the flammable and explosive materials can not be on the hair to promote the safety of the body, Table and gas stove should be more than 300mm distance. 4. Stress test and customer acceptance Construction workers in the pipe stamping test when there is no run, run, drain, drop and other phenomena, confirmed by the customer after the inspection can be accepted.
Q:What are the heating components of the heating system design?
In the design of the design, the design of the heating system is based on the basic heat consumption and the additional (corrected) heat dissipation of the envelope. The basic heat consumption refers to the sum of the stable heat transfer from the room to the outside through the various parts of the room envelope (doors, windows, walls, floors, roofs, etc.) under design conditions. Additional (modified) heat consumption refers to the heat transfer of the envelope structure changes the basic heat consumption to correct the heat consumption. Additional (corrected) calorie consumption includes the amount of heat applied to the correction, wind addition, height addition and external door addition.
Q:What is the working principle of air source heat pump and what is it?
With the principle of air conditioning is the same
Q:1200 square meters of villas need much electric heating stove
Three kilowatts
Q:The water in the heating furnace is often good
If you find a black water on the change once to maintain the heating parts.
Q:Do you forget to close the water injection valve and start the machine in the heating state will damage the three-way valve?
Not the water valve can be off the system may be overpressure by the safety valve with the three-way valve to protect the relationship is not
Q:To warm only part of the room, do not open the room will freeze it?
Winter is not open to warm, the tube is not necessarily frozen. There are three kinds of heat to the ground: boiler, air source host, ground source heat pump host. ① boiler installed indoor, the ice may be very low, this situation can not be frozen ② use of air source, ground source heat pump to provide heat source, the host In the outdoor may be frozen, the two heat sources in the ambient temperature below 3 ℃, will automatically open the antifreeze function switch, the professional installation company will be installed in the system, antifreeze, lower ambient temperature will not appear Icing phenomenon.
Q:Water tank plus electric heating tube to give warm when the heat source
If you only use this water when heating, it is possible. But pay attention to the cycle

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords