20tons Topless Tower Crane QP8030 TCP8030
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Feature: Tower Crane
Condition: New
Application: All construction projects
Max. Lifting Load: 20 tons
Max. Lifting Height: 226.9m
Span: 80m
Place of Origin: China (Mainland)
Brand Name:CNBM
Model Number: QP8030
Certification: ISO9001&CE&GHOST
Warranty: 12 Months
After-sales Service Provided: Engineers available to service machinery overseas
Color: Any
Main Fatures
TCP8030 tower crane is a company based GB/T5031-2008 《tower crane》design and manufacture of a construction crane. It can be applied widely in high-rise civilian building, bridge and water-conservancy project, big-span industrial workshop and high-rise building, etc. the tower crane is high level slewing self-erecting tower crane which adopts horizontal jib and trolley-jib. The main features as follows:
Height of the tower crane is confirmed according to height of building, lifting ability of the tower crane is independent of height.
The tower crane with features as high working speed, stead work condition and high efficiency.
Hoisting jib has 80M ranges. This meets project needs more widely.
The eyeshot of cab is well, and the cab is installed independently,which creat preferable working condition for handlers.
Location of the tower crane is reasonable, and the externality of the crane is beautiful.
Lifting jib adopts rigid double tension bars with features as light structure.
the operation is simple and the maintenance is convenient
Product Picture
Performance List
Product Descripition
Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
Our Services
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.
- Q: Tower cranes should stop working when the wind speed is greater than the magnitude.
- Tower crane work is strictly prohibited at grade 4 or above
- Q: How does a person go about becoming a Gantry Crane Operator? And what is it like?
- First you need an opportunity to operate a Gantry Crane, then you will to to get a crane operator license. Finally, you need to find a company who needs a Gantry Crane operator, but if you have located the first step, then you have found someone.
- Q: what is the crane track base ?
- Mechanical or birds?
- Q: please be specific! thank u so much
- Sorry, but there's no such thing as a Chips Ahoy Crane/Machine. I'm pretty sure I know what you're talking about, though. Chip the Wolf's Grabbing Machine, right? They deleted it a while ago. Links used to work for about a month after they deleted the machine, but now they don't. I would explain how it used to work, but it wouldn't benefit anyone at all(and it would just take up my time). fruits_7_40_12 (check out my house and yardsale)
- Q: How do they get the cranes and counterweights down off the top of buildings when finished?
- The cranes and counterweights aren't on top of the building. They are on the ground constructed with structural steel supports.
- Q: In the end of chapter 16 of Catching Fire the 2nd book of the Hunger Games it says the name she wrote in the dummy, was Seneca Crane. Who is that?!,
- Seneca Crane was the game maker for the 74th annual Hunger Games He was basically the gamemaker of the games that Katniss was first in with Peeta in the first book/movie In Catching Fire, you learn that President Snow got him killed because as gamemaker, he's responsible for the reason why two tributes (Katniss and Peeta) won the last Hunger Games, which is why Katniss has the dummy saying Seneca Crane on it.
- Q: Yeah, I think I know what cranes are used for. But in the context of building an apartment and so on, what is the role derricks there. And why is called cranes and derricks - What is the correlation between them.
- Cranes are used for lifting heavy equipment. Derricks are used to drill for oil. They are two different things.
- Q: Emergency treatment of interrupted electricity during lifting of tower crane
- It is very dangerous to stop the electricity during the lifting of tower crane. Because the slewing brake is missing, the tower crane is very dangerous because the wind rotates.
- Q: I like cranes like the ones at restaurants and Walmart and things. I decided I want one for myself, just in a smaller size. Basically I want to put in things like plush and then grab them. Most will be under 7, though some might be larger.
- This okorder /
- Q: any kind of sayings
- whoops big whoop don't walk under a crane secure the crane
Send your message to us
20tons Topless Tower Crane QP8030 TCP8030
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords