QP8030 Flat-top Tower Crane TCP8030 high quality
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Feature: Tower Crane
Condition: New
Application: All construction projects
Max. Lifting Load: 20 tons
Place of Origin: Sichuan, China (Mainland)
Brand Name: QLCM
Model Number: Q8030
Certification: ISO9001, CE Certificate, GOST
Warranty: One year
After-sales Service Provided: Engineers available to service machinery overseas
Main Features
1) TC8030 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification Parameter
Packaging & Shipping
All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.
Our Service
1.We can make special sample according to the customer’s requirement.
2. We have more than 60 professional technical team, provide best after-sales service
3. Fast delivery time
4. We have CE, ISO9001 and GS certification.
Please note that we can supply both standard mechanism and frequency mechanism, and the rope capacity can be adjusted as per clients' specific requirements.
- Q: As a building gets taller, the crane is raised. How is this done? And when the building is done, how do they get the crane back down?
- they use a process called jumping. iron workers use a special fixture to unbolt the tower and lift the crane up high enough to slide in another section and bolt it down. breaking down of the crane goes in reverse order.
- Q: What are the types of common tower cranes?
- Tower crane, tower crane. Tower crane according to its different types, there are the following classification methods.(1) according to the structural typeThe fixed tower crane by connecting a fixed tower in the foundation or structure, tower crane lifting operation.Mobile tower crane: a tower crane with running device and can walk. According to the running device, it can be divided into rail type, tyre type and caterpillar type.
- Q: please help me solve.. i really don't get itttt
- 1 horse power = 746 watt. So the work W done by the crane in 15 s is given by W = 8*746*15 J . So the distance, S through which the crane lifted 100 kg, presumably at constant speed is given by 100*9.81*S = 8*746*15 or S = [(8*746*15)/(100*9.81)] = 91.25 m
- Q: I am sick and tired of sitting in my room scared looking at a crane fly bouncing around mu walls like its on crack , is there anything i can do to keep the c*nts out
- get ur boyfriend or girlfriend to kill threm for you or your besty katy!
- Q: so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
- They put a crane on the ground, and they build 5 stories, say. Then they put the crane on top of the 5th story, and build another 5 stories, then they put it on the 10th story and build 5 more, etc. Or it's hanging on the side of the building, moving upwards as the building rises.
- Q: From what I'm understanding in the first stanza, a women lost her lover to the war because he fell off his horse...Is that right?
- Yes, Stephen Crane talks about lost love and sacrifices in his poem. The basic casualty of war. A lover, a father and son are lost in his story and those that are left behind he tries to console. The poem is noted for the ironic use of war is kind. We all know that War is really not kind. The poem’s speaker, simultaneously sympathetic with the victims of war and cynical about the purposes of war, implicitly criticizes the image of the romantic hero, showing in graphic scenes the realities of battlefield death and the emotional torment it causes for those left behind.
- Q: Like those three hundred or four hundred meter tall skyscrapers, where are the bottom of these tower cranes installed?It doesn't go up from the ground, little by littleWill the crane not fall down?
- It's just a little bit needed, and you're right!! As long as the requirements to ensure verticality, no problemBuilding technical requirements, such as Perpendicularity Error of not more than 3 millimeters per 100 meters, can be guaranteed by the building.
- Q: I need a answers to these questions for a school project.These questions are:-How and when did it occur when the Siberian White Crane got threatened and critically endangered?What are the causes of this environmental issue?What are the effects of this environmental issue?What has or is being done to prevent such and environmental issue occurring again?Thanks, it will really help me with my final mark.
- Check okorder . There is some very interesting information at this site.
- Q: What is the dumbest bird in the aviary community? Is it really the Crane?
- The owl is close to being the dumbest bird. An expert who told us this explained that its eyes were so big, there wasn't much room left in its skull for brain . . .
- Q: how a tower crane for a high rise building construction is erected?
- Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).
Send your message to us
QP8030 Flat-top Tower Crane TCP8030 high quality
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords