ZNSJ 4ft x 8ft laminated panel for shuttering film faced plywood
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
ZNSJ 4ft x 8ft laminated panel for shuttering film faced plywood
Dimensions of ZNSJ 4ft x 8ft laminated panel for shuttering film faced plywood: 1220*2240*(10-20mm),915*1830*(10-20mm)
Product Features of ZNSJ 4ft x 8ft laminated panel for shuttering film faced plywood :
1,Adopting the high quality poplar ,whole core and first grade,no holes in the middle of plywood after sawing, which can gurantee the toughness of the template;
2,Using the melamine glue from core to face, high glue concentration, which can gurantee glue adhesiveness ;
3,Adhering them manufacturing principles that each core board is with layer by layer gluing and with high pressure.Layer by layer gluing can fullly bond that impove 10-15% bonding strength. The hot pressure is 120% higher than the theoretical one ,avoiding to reduce pressure to keep the thicknes. The turnover of finished film faced plywood( Concrete formwork panel ZNSJ high quality plywood ) can be up to 10-15time, which ensure product be more durable;
4, two times sanding (secondary molding) before film facing ensure the smoothness of the template without burrs and groove marks.
Product Application of ZNSJ 4ft x 8ft laminated panel for shuttering film faced plywood: High- rise construction,building construction, forming concrete,can be widely use for building concrete .
Items | Parameters | |||||
Plywood size: | 1220*2440mm , 1830*915mm,4*8 ft,3*6ft | |||||
Plywood name | Film faced plywood, wooden formwork, wood formwork, Marine Plywood,Construction Plywood,wooden construction formwork,Concrete formwork panel,shuttering plywood, shuttering formwork,ZNSJ Marineplex Film Faced Plywood price list | |||||
Glue | Melamine glue/MR WBP | |||||
Core | pine,hardwood,eucalyptus,combi etc | |||||
F/B | Black film, brown film, anti-slip film | |||||
Thickness tolerance: | +/-0.5mm | |||||
Standard quality | natural wood face, one time hot pressing | |||||
High quality | double side film faced,twice hot pressing and sanding | |||||
thickness: | gross weight ( kg/pcs) | 20ft container (pcs) | 40ft container (pcs) | Using times | ||
13mm | 25.16 | 690 | 870 | 6~15times | ||
14mm | 27.12 | 640 | 810 | 6~15times | ||
15mm | 29.05 | 600 | 750 | 6~15times | ||
Item | Unit | Standard value | Test result | |||
Moisture | % | 6 ~14 | 9 | |||
Adhesive Force | Mpa | ≥0.7 | 0.76 | |||
Bending strength | Longitudinal | Mpa | ≥24 | 36 | ||
Cross | ≥20 | 22 | ||||
Elastic Modulus | Longitudinal | Mpa | ≥5000 | 5980 | ||
Cross | ≥4000 | 4850 |
- Q: What is the use of building wall formwork support? Thank you
- In the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket
- Q: Technical specification for construction formwork safety JGJ162-2008 who has made me please
- Safety code for construction formwork JGJ 162-20081 General Provisions1.0.1 for the implementation of the construction project template construction of China's safety production principles and policies to achieve advanced technology, economic and reasonable, easy to apply and to ensure safety in production, the development of this specification.
- Q: 1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
- General principles for the implementation of 1.0.1 in the construction of formwork engineering in China to implement the principles and policies of safe production, to achieve advanced technology, economic and reasonable, easy to apply and to ensure safety in production, the development of this specification. 1.0.2 This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction. 1.0.3 template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation work to improve the reuse rate. The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.
- Q: 86335 template support, what is the concept of those advantages
- 86335 new formwork support structureDigital steel formwork support composite structureAt present, in the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket, built into the scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction. The problem is to build and assembling workload, low construction efficiency, labour and material consuming and poor quality, waste of resources, not beautiful and difficult to adjust
- Q: Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
- Suggest that you chose to do it according to the roof beams, concrete inclined roof more difficult to operate, workers are not professional if vibration is not so dense, it is easy to Water Leakage.If you really want to use the concrete will have to change the roof to flat roof, since the construction of the team is easy to build, more secure.Cast in place concrete roof generally according to 12CM~15CM.
- Q: What is the building template support
- The main: length may be 1.17 meters and 4.39 meters between any adjustment for short distance, main keel balcony and bathroom, small room.Vice: the length of 1.15 meters, 0.8 meters and 0.4 meters specifications.Support rod: height can be adjusted between 2 meters and 4.80 meters, such as the height of the building with the connecting rod arbitrarily high.
Send your message to us
ZNSJ 4ft x 8ft laminated panel for shuttering film faced plywood
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords