• Whole Aluminum-Frame Formworks for Building Materials System 1
  • Whole Aluminum-Frame Formworks for Building Materials System 2
  • Whole Aluminum-Frame Formworks for Building Materials System 3
Whole Aluminum-Frame Formworks for Building Materials

Whole Aluminum-Frame Formworks for Building Materials

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
10000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of  Whole Aluminum Formwork Description 

Whole Aluminium Formwork System is designed to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. All main components are manufactured from high grade aluminium alloy. This structural grade aluminium has exceptional properties being extremely light in weight but also heavy-duty and durable. When incorporating this into a design which utilizes standard components and allows several possible plan and elevation variables, it provides a lightweight solution for a large area slab formwork system.

 

2. Main Features of  Whole Aluminum Formwork

-Light and easy assemble

-Simple structure.

-Competitive prices

 

3. Whole Aluminum Formwork Images

4. Whole Aluminum Formwork Specifications

1: MaximumColumn Size:900 x 900mm

(2’-11.5”x 2’-11.5”)

2: DesignConcrete Pressure: 1,800 psf (90 kN/m2)

3:StandardPanel Width 900mm, 750mm & 600mm

(2’-11.5”,2’-5.5” & 1’-11.5”)

4:StandardPanel Height: 3.0m, 2.4m, 1.2

 

5. FAQ of  Whole Aluminum Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.    

 .We can provide you the professional technical team.    

    .We can provide professional building proposal for your project.       

    . Please feel free to customize.  

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

-Packing: wood package and adhesive tape

-Shipping: by sea

     -Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.




Q:1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
3 2.1.12 flying die flying shuttering mainly by the platform board, support system (including beam, support, support, legs, etc.) and other accessories (such as lifting and walking mechanism, etc.). The utility model is a large tool type template, which is called a table mould or a table model because of the appearance of the utility model. Because it can take advantage of lifting machinery, pouring from the well under the floor of the lift out of the transfer to the upper layer of repeated use, so called flying mode. 2.1.13 tunnel mode tunnel shuttering a combination of stereotypes template, while pouring concrete wall and floor of the template, because the shape of the template like a tunnel, it is known as the tunnel model.
Q:What is the building template support
The main: length may be 1.17 meters and 4.39 meters between any adjustment for short distance, main keel balcony and bathroom, small room.Vice: the length of 1.15 meters, 0.8 meters and 0.4 meters specifications.Support rod: height can be adjusted between 2 meters and 4.80 meters, such as the height of the building with the connecting rod arbitrarily high.
Q:What is the use of building wall formwork support? Thank you
Multicard support beams with multi support beams in visa, visa in early removing system to save 32% than ordinary plywood sold cuplok supporting system construction.
Q:86335 template support, what is the concept of those advantages
86335 new formwork support structureDigital steel formwork support composite structureAt present, in the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket, built into the scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction. The problem is to build and assembling workload, low construction efficiency, labour and material consuming and poor quality, waste of resources, not beautiful and difficult to adjust
Q:Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
Suggest that you chose to do it according to the roof beams, concrete inclined roof more difficult to operate, workers are not professional if vibration is not so dense, it is easy to Water Leakage.If you really want to use the concrete will have to change the roof to flat roof, since the construction of the team is easy to build, more secure.Cast in place concrete roof generally according to 12CM~15CM.
Q:Technical specification for construction formwork safety JGJ162-2008 who has made me please
Template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation workload. To improve the reuse rate.The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords