YONGMAO STT403 tower crane
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
INFO:Topless
LIFTIMG:18/20/24T
Tip load:2.56T
ARM LENGTH:80M
HEIGHT:79.6M
Founded in the year of 1996, Yongmao is one of the key suppliers specialized in manufacturing construction machinery and engineering equipment.
We currently offer a variety of tower cranes which are broadly classified under the Topless STT series, the ST series, the Luffing STL series and the Derrick QD series, as well as crawler cranes and modified vehicles.
Yongmao tower cranes have not only been working for various domestic projects like hydroelectric power plants, nuclear power plants, shipyard, wharf, bridge, aerospace etc. but also acting in numerous construction projects all over the world.
Yongmao appreciates the reliance and confidence given by its valuable users all over the world and feels very proud of its ability and capability to contribute value added services to its users both at home and abroad.
- Q: A crane operator must ensure that the load is within load chart ratings for _________ and the __________ of the crane.A. Boom length; CenterpointB. Boom length; Load RadiusC. Center Point, Load RadiusD. Center of Gravity; Load Radius
- B. The load radius is the horizontal distance from the center of rotation of the crane to the center of gravity of the load being lifted. The load radius is a critical consideration when determining what size crane is required for most lifts. There is generally a chart that tells what that machine will lift at any boom length,
- Q: Tower crane 5610 why is it called QTZ63?
- QTZ refers to the lifting tower crane, and the 63 is the torque, the unit is tons x meters, generally in accordance with the crane's nominal gravity moment to sub model, which level is close to which model. The latter four numbers, the first two represent larger, the unit is M, and the latter two represent the largest range of maximum lifting weight, the unit is KN
- Q: the way u find them climbing with the building makes me wonder how they become this long and what is the mechanism for that
- The crane isn't growing. The cranes lift themselves up to the current top floor, build up around them, and repeat as necessary until they reach the top. The tallest cranes in the world are nowhere near as tall as the tallest skyscrapers - so the only mechanism to build very tall structures is to keep the cranes at the top of the building as it rises.
- Q: Why is there as much evidence of Icabod Crane, as there is of god??
- Ichabod wasn't headless until Chuck Norris roundhouse kicked him.
- Q: what are The performance parameters of tower cranes?
- The technical performance of tower crane is expressed in a variety of parameters, the main parameters include the range, starting weight, lifting torque, free height, maximum heightand so on; its general parameters are: a variety of speed, structure, weight, size, tail size and gauge wheelbase, etc.
- Q: You see cranes on the floor which rise about 50 metres, but sometimes, when building high sky scrapers, I see cranes on the 70th floor or the 80th floor. How do they put the the crane so high up there when it can only go up high around 60-70 metres?
- The cranes are built in the elevator shafts and moved up as needed during work progress.
- Q: I watched a man climb one once and he wasn't secured. Crazy. How much do they get?If there are any operators on here, do you get scared when you climb up/down?
- Tower crane operators are actually one of the highest paid of crane operators. It takes many years of career progression and many skills upgrading courses to reach that level. Crane operators start out with the crane trucks operating on ground level. They earn about 2k to 3k a month at this stage. They then progress to low rise cranes and then finally to high rise cranes. All the high rise crane operators are specialists in their field with many years of working experience. They would earn perhaps 7k to 8k a month.
- Q: We need to purchase spare parts. If there are any supplier in the ASEAN region as possible. We are in urgent need . We are from Viet NamThank you.Email : tuanhuynh62@yahoo,com
- they claim to have what you need. Good luck, I bet it's near impossable to get parts over there. You have a lot of work?
- Q: i have a female Doberman 4months old. running here n there, we spend time with her morning and night, four days per week we go to a big ground and walking with her more than a hour per day, is it adequate? she seems very happy and waiting for us on every evening (me and my wife) also i need an advice on her crane? i have put her in some what big (5ft 4ft) place beside my front door, not fully covered but well sheltered by the house roof/. is it ok to have an open crane like that?
- I have no idea what an open crane is? Do you mean you leave her outside all day? If so, the answer is no. Dobermans don't have the right type of coat to be left outside all day even with shelter.
- Q: how do they erect those large tower cranes you see on big building projects?
- A tower crane is usually assembled by a telescopic jib (mobile) crane of greater reach (also see self-erecting crane below) and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will often be lifted to the roof of the completed tower to dismantle the tower crane afterwards
Send your message to us
YONGMAO STT403 tower crane
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords