• YC25-8 excavator System 1
YC25-8 excavator

YC25-8 excavator

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


Established in 1989, Guangxi Yuchai Heavy Industry Co., Ltd is a Sino-foreign joint venture enterprise controlled by Yuchai Machinery Group Co., Ltd. It is located in Yulin City, which is reputed as “the city south of the Five Ridges”. Currently, Yuchai Heavy Industry’s industrial layout covers many Chinese provinces such as Tianjin, Jiangsu, Sichuan and overseas areas such as Europe, North America and Africa.

Yuchai Heavy Industry now possesses a total asset of RMB 7 billion Yuan, more than 3,500 employees including over 30 personnel who have master’s degree, doctor’s degree or title of a senior professional post. With an annual capacity to produce 20,000 sets of construction machinery, it is the major export base for small-size excavators in China and the domestic excavator manufacturer with the most complete product spectrum. It was honored as the “National Hi-Tech Enterprise” and selected as the one of the “TOP50 Construction Machinery Manufacturers in the World” in 2011.

As directed by the core concept “Green develop & harmony win-win” and the grand goal “to build the company into a hundred-billion-worth aircraft-carrier-like enterprise”, Yuchai Heavy Industry is meeting endless challenges with an aggressive spirit, and is striding forward towards its goals to “realize a sales volume of 30 billion Yuan in 2015” and to “build the world-renowned construction machinery brand”!


Operating parameters


Code

Item

Unit

YC25-8

A

Max. Digging Height

mm

3255

B

Max. Dumping Height

mm

2240

C

Max. Digging Depth

mm

2025

D

Max. Digging Radius

mm

3755

D1

Max. Horizontal Digging Length

mm

3660

E

Max. Digging Height Radius

mm

2515

F

Min. Slewing Radius

mm

1625

G

Max. Depth of Bulldozer

mm

235

H

Max. Height of Bulldozer

mm

225

 

Max. Digging Force

kN

10

Dimension parameters


Code

Item

Unit

YC25-8

 

Operating Weight

kg

3080

 

Standard Bucket Capacity

0.07

 

Engine

 

KUBOTAD1803 | Cummins A1700

 

Power of Engine

kw/rpm

22.8/2200 | 24/2200

A

Machine Length

mm

4508

B

Machine Height

mm

2400

C

Overall Width

mm

1450

D

Crawler Width

mm

300 ( Steel/Rubber )

E

Platform Slewing Radius

mm

1351

F

Crawler Length

mm

1935

G

Wheel-Base

mm

1455

H

Min. Ground Clearance

mm

320

I

Overall Height

mm

1409

J

Width of Platform

mm

1420

K

Height of Engine Hood

mm

1384

L

Height from Floor to Platform

mm

563

 

Width of Bucket

mm

517

 

Walking Speed(Low/High)

km/h

2.4/4.2

 

Platform Slewing Speed

rpm

10~12

 

Cab

 

 

Canopy

 

 

Defection Angle (Left/Right)

°

80/50


Yuchai International Imp. &Exp. (Beijing) Co., Ltd.


Q: How interested are you in the following hydraulic excavator improvements? ?Ability to Measure Machine Productivity (Payload, Cycles) ?On Machine Operator Coaching/Assistance ?Machine Protection Improvements ?Machine Security Improvements
Whoever wrote that meant in, not on. So that choice reads: How interested are you in machine operator coaching/assistance. Hope that helps.
Q: I grab more than 7 months, I was driving in the opposite direction, loading it, find leveling is not good, but I don't want to go back to home but is the direction I do open in the opposite direction to open the positive direction of multi time can meet the urgent urgent urgent in the home. Now.
Two modes of operationThe first kind is the Japanese second-hand import machine and senior veteran driver as the representative, the left hand handle of the front, back, left and right corresponding control is the excavator's right rotation, left rotation, bucket extension and bucket recovery. We used to be referred to as "front and back spin"".The second type is the domestic new machine and the new generation of young drivers as representatives, left hand handle of the front, back, left, right, respectively, corresponding to the control of the excavator's bucket stick, bucket recovery, left rotation and right rotation. The habit is referred to as "left and right spin"".There are people who have called these two modes, "mobile phone" and "mobile phone", but due to the lack of a unified nomenclature, caused the differences on the way, before and after rotation is called mobile phone, the mobile phone is called reverse rotation, but also to rotate around the mobile phone is called, before and after the rotation is called reverse mobile phone. So to avoid confusion, said only this, before and after the rotation and rotation, to note here is "mobile phone" is refers to the rotation, and rotation or rotation before and after the "anti mobile phone", two kinds of the different mode of operation is only the left hand excavator operating handle, right invariant handle mode.
Q: My leopard gecko looks lonely in his cage and i was thinking about getting him a friend, another gecko. Would it be okay if i did? I know Geckos are solitary animals but i want another gecko but i only have room for one cage so i was wondering if i could put them in the same cage.
What size tank do you have? if you have a 20+gallon that is fine. 10 its too little... oh and if you have a male, dont get another male because they can get very aggresive and kill one another. if you have a female you can get another female or get a male. i really hope this helps...(make sure you have lots of room for both!) -TFG
Q: is an excavator operator required to have a crane ticket to do pipe laying in australia?
Any skilled operator will be required trade license on a particular equipment he is operating. If they will use excavator to lay pipe then no need for crane ticket.
Q: Hello,My mother's co-worker accidentally dug up a turtle nest while using an excavator, and most of the eggs were crushed and broken, except for 6. My mom brought the 6 eggs to me, and I have no clue as to what I should do. Right now they are in a large flower pot or dirt, sitting about three inches under the surface. The flower pot is sitting beside a window that gets sun during the day. The eggs look like the first picture on this web page.
if it's possible to get sand, that would be better. Just keep them about 4-5 inches from the surface, and you can keep them in the sun all day (as they would be in the wild). Their mom doesn't look after them at all anyways. Not sure what the dimpling could be a sign of, but it is normal.
Q: Has anyone tried it? Is it a fun substrate? Is it easy to mold into shape? Can I use it for my two baby leopard geckos? How many bags would work for a 30 gallon terrarium? Why can be used if I don't want to use balloons for molding? Water bottles maybe? What else?
I would use what u r comfortable with if it is for reptiles and says safe for rep tiled and ur kind of lizard then it is ok to use especially if the leopard geckos picture is on it. I wouldnt make it i would just buy the thing or something like it it may not work the way u want it to and can turn into a big project.
Q: I have dreams about bridges. Somebody tried to transport a excavator across a stone bridge in my dream and the bridge collapsed. I need to learn to dream walk to put it back together. It is VERY important to the safety of the United States. It has something to do with the plates of Joseph Smith so any shamans who can show me how to dream walk would be appreciated, thank you.
sure! I enjoy that always. And the goals which come actual, are most likely dreamt years in the past, and normally while i used to be wakeful. It would even be recommendation, that did not make experience on the time. Like, as soon as, I used to be sitting in a automobile and it got here to my brain Remember that during Bades?en(a pool neighborhood, do not pass there most likely) if you are sitting at THIS factor, there is 2 approaches to return there. You will pick the incorrect. two years later, I went to the pool, having forgotten approximately the dream. And I needed to uncover my household once more, however I could not. Then I remembered, I'd selected the incorrect approach. Really creepy.
Q: My neighbors are using my driveway to unload equipment into their backyard. The reason they are using my driveway is because their house blocks all of their backyard from the road so they are using my driveway to unload excavator and backhoe to dig up their backyard.My mom drove down the driveway this morning and they workers had their truck parked in our driveway. He moved it right away but I still think this is not very polite.I don't mind them using my driveway but no one has asked or said anything to me. I was wondering what I should do?I was thinking about making the owners sign a contract saying that they know they dont own the property that they are using but can use it as long as I say so.
No, no contract. Take photos when you catch them for evidence because large yard materials like excavators going through your yard to get to there's can ruin your landscaping. Tell them they should have asked before assuming, that you understand the predicament they're in and that you want them to sign a contract saying there completely responsible for any landscaping and yard damage they cause to your property. Both of you need to sign and print and DATE! And make a copy for both of you. Give them the copy. If they don't agree to this you will call the police for trespassing, and damage, as well as the fact that if they're so desperate to get into they're yard they can just take off a tier of they're fencing and access they're own yard with a wheel barrow or whatever fits. Sucks to be them, they should have thought about it. Not yoir problem. Theirs.
Q: We built our own house two years ago and moved in April 2008. We had the excavators back-fill after inspections. Since then the soil has been settling down to the point now I can see the top of the tar on the foundation. How long does this continue? It seems to have slowed down this past year, but it has messed up my plans of planting around my house. I want to put more dirt around the foundation to build it back up where it is suppose to be, but then I'd have to wait on that to settle. That is a lot of dirt. I'm debating on doing it myself or have the excavator come back in and do it for me.
Although the ground never finishes settling most settling will occur in the first 4 years. I suggest you fill in with dirt now and then again next season. Planting will help bind the dirt and can be started after this first fill.
Q: Name of Aplicant : Md.Nasir UddinQualification : Diploma in Mechanical EngineerEmployee : Simplex Infrastructure LimitedDesignation : Oversear Gr-II (Mechanical)Currant city : DhakaHome District: ComillaExperience : 04 (four) years RunningContract no
sturdy for you..... some day i'm going to bypass on your 360 so which you will get yet another view..........do you deserve a megastar particular why not i voted for Bush , supplying you with a megastar won't be in a position to be any worse :-) i visited your 360, it replaced into lovable, all purple and girlie....you get carry of lots of pals....have a advantageous day sweetie and that i'm hoping you get your next a million,000 perspectives relatively quickly so which you will get yet another megastar....

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords