WN dredging pump
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
D:1000mm
Q:16000-25000m3/h
H:25-80m
The pump has a single-stage,single-suction and double pump shells structure. Seen from the inlet end, therotary direction of the right pump is counterclockwise while the left one isclockwise. The pump is the domestic largest dredging pump applied to 13500m3trailing suction hopper dredger of Shanghai Waterway Bureau.
It is widely applied todredging, silt clearing and hydraulic filling with rivers and lakes, ports anddocks all over the country such as, YangtzeRiver Basin, YellowRiver Basin, Liaohe River Basin,Pearl River Delta, Huaihe river basin, etc. The products are also sold toEurope, Middle East and Southeast Asia.
dredging pump is new type dredging pump,making full use of advanced CAD software ,siming to china 's river lake and sea situation:they haven't been repaired for many years and now they are in great need to dredge and fill hydraulically.
this series of dredging pump has characteristic features:easy installation ,long-life service ,high efficiency,reliable bearing lining and good economical efficiency ,this type of pump can meet dredging ship's requirements completely and each set of dredging pump has passed the inspection issued by CCS
- Q: The famous type of cutter suction dredger
- MAN provides engines for the world's largest suction hopper dredger.
- Q: What is the working principle of a cutter suction dredger?
- Construction principle of cutter suction dredger:The dredger is in place, the steel pile excavation construction method, horizontal positioning dredging and filling, it is with a fall in the channel center line of the main hull positioning pile as the center of the rotation, the role of the reamer for traversing on lateral swing in the channel width, the construction method of excavation section of soil layer cutting cutter.
- Q: How much dredging can the 4000 side /h suction dredge dredge in one day? Soft silt
- The content of dredger dredging is generally 15 - 25%, 4000 way water flow you can count themselves, can use Baidu Search Xintuo heavy machinery, specializing in the production of dredger, dredging, pumping sand and other equipment, gold rush ship products exported to Africa and South Asia and other countries and regions
- Q: Who has the construction plan of dredger dredger after dredger dredging and dredging with dredger barge?
- Would dig into the mud barge, barge by suction dredger, using force pump suction dredger through pipelines on shore
- Q: Does dredging dredger need relevant qualification?
- But if the local government regulations must be legitimate formal dredging project, estimated to need to apply for a ship's certificate, it is equivalent to a person's identity card! If you need Qingzhou Wynn mine, you can go through the whole process, the relevant costs to consult manufacturers.
- Q: Classification of trailing suction dredgers for trailing suction dredger
- Suction dredger is flexible, high efficiency, strong wind waves, suitable for coastal ports, the wide river and ship anchorage operation in large waves and without the cover of coastal and estuarine areas, should choose the self-propelled trailing suction dredger. Soil works suitable for loosening and less than clay hardness.
- Q: 3800m3 cutter suction dredger
- The 3800m3 cutter suction dredger says 3800m3 of sediment can be dug per hour!I designed the dredge pump, the ship is generally named after dredging flow, but also by the flow of water named
- Q: What is the difference between a cutter suction dredger and a trailing suction dredger?
- TSHD is installed through the chain of dredge bucket will be dug out of the bottom mud, stored on a ship or barge dredger edges.
- Q: The working principle of a trailing suction dredger
- The ship is equipped with one or several sets of centrifugal pumps, centrifugal pumps for absorbing water and mud from the bottom of the vessel, into the mud tank. These operations are carried out on the voyage, while air while digging, mud tank fill to throw mud mud area, through the Bilge mud. Handle cases
- Q: What are the crew members on the dredge?
- But in general, the dredger crew responsible for the work can be divided into: navigation, communication and work positioning on the ship, electrician, turbine, maintenance, and operation personnel (dredging) and special equipment (such as grab dredger crane and grab operation, cutter suction, suction dredger winch, water pump operation etc.).
Send your message to us
WN dredging pump
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches