General Introduction

u This cutter suction dredger is designed to operate in sheltered inshore waters and under tropical climate conditions. Build under enterprise standard.

u The whole dredger is dismountable in road transportable sections.

u The engines and dredge pump are located in the center pontoon, the 2 side pontoons serve as fuel bunkers, ballast tanks and store.

u Engine room and pump section are accessible by watertight hatches

u Cutter shaft runs on roller type bearings in an enclosed shaft housing flooded with lubrication oil a lock oil tank to ensure a positive pressure inside the bearing housing is located on top of the wheelhouse.

u The spacious control cabin is ergonomically designed fitted on a raised platform with all around non obstructed view ,2 operators consoles containing engine instrumentation and controls for winches, dredge pump, suction and discharge pressure gauges, navigation light controls, airconditioned and well insulated .

u Below the control cabin is a changing room located with table, chairs and washbasin

u The underwater section of the dredger is protected with a marine coating system and cathodic protection for use in a saltwater environment


     TECHNICAL SPECIFICATION YS-CSD200P

No.

Item

Description

Remark

1.

General Principle  

(1). Overall Length

22m

(2). Side Pontoon Size

14m

(3). Main Pontoon Size

10.0m

(4). Breadth

4.6m

(5). Moulded Depth

1.6m

(6). Mean Draft

1.0m

(7). Dredging Depth

8m

(8). Pumping Distance

1000m

(9). Pump Flow Capacity

800m³/h

(10).Suction Pipe Dia

300mm

Out Diameter

(11) Discharge Pipe Dia

300mm

Out Diameter

2.

Main Pontoon

(1). Dimension

10m*2.2m*1.6m

(2). Bottom Plate Thick

8mm

CCSB marine plate

(3). Side Wall Thick

6mm

CCSB marine plate

(4). Front and Rear

14mm

CCSB marine plate

3.

Side Pontoon

(1). Dimension

14m*1.2m*1.6m

(2). Bottom Plate Thick

8mm

(3). Side Wall Thick

6mm

(4). Front and Rear Thick

6mm

4.

Main Engine

Drive dredger pump only

(1). Make

WEICHAI

(2). Model

6160

Marine Engine

(3). Power / rpm

 300 Kw @ 1000rmp

(4). Fuel Consumption

40L/h

(5). Cooling Style

Water Cooling

6.

Axle Generator  

Make

STANFORD

Power / rpm

24Kw

7.

Harbor Generator

Drive hydraulic pump &

axle generator

Make

WEICHAI +STANFORD

Power / rpm

24Kw

Fuel Consumption

4L/h

Cooling Style

Air Cooling

Output Voltage

220V/ 380V

8.

Dredge Pump

Make

SHIJIAZHUANG

Model

200G-G

Suction Pipe Diameter

250mm

Discharge Pipe Diameter

200mm

Head

65m

Rpm

1000rpm

Water Flow Capacity

800m³/h

9.

Gearbox

Model

FDL-320

Ratio

1: 1

10.

Cutter

Style

Hydraulic Motor+ Planetary Gearbox

Cutter Power

55kw

Crown Diameter

900mm

Cutter Out Diameter

1000mm

Blades

          5pcs

High manganese alloy

Cutter Teeth

          28pcs  

High manganese alloy

Rpm

       0-10-30rpm

11.

Ladder Winch

Hydraulic Drive

Winch Motor Brand

      NINGBO XULI  

 

First Layer Pull

4 Ton

Wire Rope Dia

16mm

Wire Rope Capacity

120m

Wire Speed

0-20m/min

12.

Swing Winch

Hydraulic Drive  

Winch Motor Brand

NINGBO XULI

First Layer Pull

4 Ton

Wire Rope Dia

18mm

Wire Rope Capacity

120m

Wire Speed

0-20m/min

Quantity

2 sets

14

Spud

Length

12m

Diameter

325mm

Weight

          2200Kg

Each

     

15

Spud Cylinder

Cylinder Stroke

2.0m

Cylinder Dia

125mm

Working Pressure

16Mpa

Travel Speed

0.2m/s

17.

Anchor

(1). Type

HHP Anchor

(2). Weight

200Kg

18.

Operation Cabin

(1). Operation Board

Control all dredger movement commands and monitor equipments running condition. PLC system from SIMENS

(2). Adjustable Chair

For dredger master. Leather.

(3). A/ C

One set  

19.

Hydraulic System  

A. System Introduction

Hydraulic system is designed to supply power for winches, cutter, spud cylinder. Hydraulic pump separately is driven by engine free end.

B. Hydraulic Motor

From YINING which is Italy-China Joint Venture Brand

Excellent performance and usage life.

C. Hydraulic Pump

NANJING

20.

Painting Principle

Introduction

Do sand blasting before welding. Use good quality marine paint with greater thickness. Paint system is 3 or 4 layers with minimum thickness of 400 micron on the below water line area. Fix anti-rust device inside and outside of pontoons.

19.

Electrical System

Introduction

All electrical components are from famous brand as Omron and CHINT. Equip overload protection box to control safety. Use high quality electrical marine type cables (smoke and halogen free).

20.

Navigation Tool

(1). Elec-mag Compass

Equipped

(2). VHF-Radiotelephone

Equipped

21

Optional Equipments

(1) Pump Booster

Increase pumping distance

(2) Spud Carrier

Stroke-4meter

(3) Concentration Meter

(4)Flow Capacity Meter

Pipeline

(1). HDPE pipe

ID-285mm OD-315mm  Thickness-15mm

Length-11.5m/pcs

(2). Rubber Hose

ID-300mm Length-1.2m

(3). Floater

ID-315mm Length-1100mm  OD-1100mm

                  *Quantity depends on real pumping distance*

Q: Advantages and disadvantages of trailing suction dredger for trailing suction dredger
In dredging, sediment laden with large amounts of water is transported to the dumping area, thereby affecting production. The suction boat can be used in infrastructure dredging and maintenance dredging, but not in narrow water areas
Q: What is the working principle of a cutter suction dredger?
The working principle of cutter suction dredger: to locate the pile as the center, swing to dredge, forward, like walk, another piece of steel columns alternately changing piles, cutter dredging process fanned forward. The operation of the cutter suction dredger can be completed continuously, such as dredging, transporting mud and unloading mud. It is a kind of dredger with high efficiency and low cost.
Q: How much dredging can the 4000 side /h suction dredge dredge in one day? Soft silt
The content of dredger dredging is generally 15 - 25%, 4000 way water flow you can count themselves, can use Baidu Search Xintuo heavy machinery, specializing in the production of dredger, dredging, pumping sand and other equipment, gold rush ship products exported to Africa and South Asia and other countries and regions
Q: Who has the construction plan of dredger dredger after dredger dredging and dredging with dredger barge?
Is it a filling scheme for dredger? How about a suction dredger on the side of Qingzhou? Customer feedback is also OK, you can come and have a lookSpecific contact, see user name, basic data
Q: Does dredging dredger need relevant qualification?
I can do it for you or not! No, oh, no!
Q: 3800m3 cutter suction dredger
Should be the hour efficiency of 3800 cubic meters, 3800 cubic meters of water or flow, I feel your problems are wrong, some 3800 type dredger, Holland IHC company, but refers to the total installed power. So I think it is type 3800, not 3800M3.
Q: Who knows what's the name of the biggest dredger in China?
Tianjin Waterway Bureau of the pumping strength slightly stronger its name to "day" at the beginning of the word, is the largest dredger and Tianqi Tianlin, nominal production in my impression is 4200m /h fand the two sister ship, is currently the largest dredger.
Q: What is the difference between a cutter suction dredger and a trailing suction dredger?
Extend the straw to the bottom of the water, turn on the mixer, and stir up the mud at the bottom of the water. Then suck the mud out of the pipe and send it to the site by the pipe.
Q: The working principle of a trailing suction dredger
The ship is equipped with one or several sets of centrifugal pumps, centrifugal pumps for absorbing water and mud from the bottom of the vessel, into the mud tank. These operations are carried out on the voyage, while air while digging, mud tank fill to throw mud mud area, through the Bilge mud. Handle cases
Q: What are the crew members on the dredge?
But in general, the dredger crew responsible for the work can be divided into: navigation, communication and work positioning on the ship, electrician, turbine, maintenance, and operation personnel (dredging) and special equipment (such as grab dredger crane and grab operation, cutter suction, suction dredger winch, water pump operation etc.).

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords