CSD-300 Cutter Suction Dredger
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
General Introduction
u This cutter suction dredger is designed to operate in sheltered inshore waters and under tropical climate conditions. Build under enterprise standard with reference to ZC standard,China.
u She is of all welded steel construction ,bottom plate 8 mm thickness and shell plating 6 mm thickness, frame distance 500 mm, with 2 fixed spuds on the aft ,ladder support A frame in the front and 3 hydraulic operated winches ,2 double bollards(fwd and aft) and 1 single bollard in the center on each side. 2 anchor boom each side.
u The whole dredger is dismountable in road transportable sections.
u The engines and dredge pump are located in the center pontoon, the 2 side pontoons serve as fuel bunkers, ballast tanks and store.
u Engine room and pump section are accessible by watertight hatches
u Cutter shaft runs on roller type bearings in an enclosed shaft housing flooded with lubrication oil a lock oil tank to ensure a positive pressure inside the bearing housing is located on top of the wheelhouse.
u The spacious control cabin is ergonomically designed fitted on a raised platform with all around non obstructed view ,2 operators consoles containing engine instrumentation and controls for winches, dredge pump, suction and discharge pressure gauges, navigation light controls, airconditioned and well insulated .
u Below the control cabin is a changing room located with table, chairs and washbasin
u The underwater section of the dredger is protected with a marine coating system and cathodic protection for use in a saltwater environment。
TECHNICAL SPECIFICATION CSD300 | ||||
No. | Item | Description | Remark | |
1. | General Principle |
|
| |
| (1). Overall Length | 36m |
| |
(2). Side Pontoon Size | 25m |
| ||
(3). Main Pontoon Size | 16.0m |
| ||
(4). Breadth | 6.5m |
| ||
(5). Moulded Depth | 2.0m |
| ||
(6). Mean Draft | 1.2m |
| ||
(7). Dredging Depth | 15m |
| ||
(8). Pumping Distance | 1500m |
| ||
(9). Pump Flow Capacity | 2000m³/h |
| ||
(10).Suction Pipe Dia | 450mm | Out Diameter | ||
(11) Discharge Pipe Dia | 450mm | Out Diameter | ||
|
|
| ||
2. | Main Pontoon |
|
| |
| (1). Dimension | 16m*3.5m*2.0m |
| |
(2). Bottom Plate Thick | 10mm | |||
(3). Side Wall Thick | 8mm | CCSB marine plate | ||
(4). Front and Rear | 16mm | CCSB marine plate | ||
|
|
| ||
3. | Side Pontoon |
|
| |
| (1). Dimension | 25m*1.5m*2.0m |
| |
(2). Bottom Plate Thick | 8mm |
| ||
(3). Side Wall Thick | 6mm |
| ||
(4). Front and Rear Thick | 6mm |
| ||
|
|
| ||
4. | Main Engine |
| Drive dredger pump and hydraulic pump | |
| (1). Make | SINO-Petrol JICHAI ENGINE |
| |
(2). Model | 12V190ZLC | Marine Engine | ||
(3). Power / rpm | 720Kw @ 1450 rmp |
| ||
(4). Fuel Consumption | 130L/h |
| ||
(5). Cooling Style | Water Cooling |
| ||
|
|
|
| |
6. | Axle Generator |
| Driven separately | |
| Make | STANFORD |
| |
Power / rpm | 24Kw |
| ||
|
|
| ||
7. | Harbor Generator |
| Drive hydraulic pump & axle generator | |
| Make | WEICHAI +STANFORD |
| |
Power / rpm | 24Kw |
| ||
Fuel Consumption | 4L/h |
| ||
Cooling Style | Air Cooling |
| ||
Output Voltage | 220V/ 380V |
| ||
|
|
| ||
8. | Dredge Pump |
|
| |
| Make | SHIJIAZHUANG |
| |
Model | 300G-G |
| ||
Suction Pipe Diameter | 350mm |
| ||
Discharge Pipe Diameter | 300mm |
| ||
Head | 65m |
| ||
Rpm | 550rpm |
| ||
Water Flow Capacity | 2000m³/h |
| ||
|
|
| ||
9. | Gearbox |
|
| |
| Model | GC650 |
| |
Ratio | 2 : 1 |
| ||
|
|
| ||
10. | Cutter |
|
| |
| Style | Hydraulic Motor+ Planetary Gearbox | ||
Cutter Power | 130kw |
| ||
Crown Diameter | 1400mm |
| ||
Cutter Out Diameter | 1500mm |
| ||
Blades | 5pcs | High manganese alloy | ||
Cutter Teeth | 33pcs | High manganese alloy | ||
Rpm | 0-10-30rpm |
| ||
|
|
| ||
11. | Ladder Winch |
| Hydraulic Drive | |
| Winch Motor Brand | XVLI | Imported Brand | |
First Layer Pull | 6 Ton |
| ||
Wire Rope Dia | 22mm |
| ||
Wire Rope Capacity | 120m |
| ||
Wire Speed | 0-20m/min |
| ||
|
|
| ||
12. | Swing Winch |
| Hydraulic Drive | |
| Winch Motor Brand | XVLI | Imported Brand | |
First Layer Pull | 6 Ton |
| ||
Wire Rope Dia | 20mm |
| ||
Wire Rope Capacity | 120m |
| ||
Wire Speed | 0-20m/min |
| ||
Quantity | 2 sets |
| ||
|
|
| ||
13. | Anchor Boom Unit |
|
| |
| Winch Motor Brand | XVLI |
| |
First Layer Pull | 4 Ton |
| ||
Wire Rope Dia | 18mm |
| ||
Wire Rope Capacity | 100m |
| ||
Wire Speed | 0-20m/min |
| ||
Boom Length | 12m |
| ||
Boom Diameter | 219mm |
| ||
|
|
| ||
14 | Spud |
|
| |
| Length | 18m |
| |
Diameter | 480mm |
| ||
Weight | 4200Kg | Each | ||
| ||||
15 | Spud Cylinder |
|
| |
| Cylinder Stroke | 2.5m |
| |
Cylinder Dia | 160mm |
| ||
Working Pressure | 16Mpa |
| ||
Travel Speed | 0.2m/s |
| ||
| ||||
16. | Deck Crane |
|
| |
| Loading Capacity | 3Ton |
| |
Boom Turning Radius | 3.5m |
| ||
| ||||
17. | Anchor |
|
| |
| (1). Type | HHP Anchor |
| |
(2). Weight | 500Kg |
| ||
| ||||
18. | Operation Cabin |
|
| |
| (1). Operation Board | Control all dredger movement commands and monitor equipments running condition. PLC system from SIMENS | ||
(2). Adjustable Chair | For dredger master. Leather. |
| ||
(3). A/ C | First floor and second each set. |
| ||
(4). Lounge | First floor cabin has space for two persons rest. | |||
| ||||
19. | Hydraulic System |
|
| |
| A. System Introduction | Hydraulic system is designed to supply power for winches, cutter, spud cylinder and anchor boom. Hydraulic pump separately is driven by auxiliary engine.
| ||
B. Hydraulic Motor | YINING from Sino-Italy Joint Venture as our hydraulic winch motors brand as its excellent working performance and durable usage life. | |||
C. Hydraulic Pump | NANJING | |||
| ||||
20. | Painting Principle |
|
| |
|
Introduction | Do sand blasting before welding. Use good quality marine paint with greater thickness. Paint system is 3 or 4 layers with minimum thickness of 400 micron on the below water line area | ||
| ||||
19. | Electrical System |
|
| |
|
Introduction | All electrical components are from famous brand as Omron and CHINT. Equip overload protection box to control safety. Use high quality electrical marine type cables (smoke and halogen free). | ||
20. | Navigation Tool |
|
| |
| (1). Elec-mag Compass | Equipped |
| |
(2). VHF-Radiotelephone | Equipped |
| ||
| ||||
21 | Optional Equipments |
| ||
(1) Pump Booster | Increase pumping distance | |||
(2) Spud Carrier | Stroke-4meter | |||
(3) Concentration Meter |
| |||
(4)Flow Capacity Meter |
| |||
| Pipeline |
| ||
(1). HDPE pipe | ID-410mm OD-444mm Thickness-17mm Length-12m/pcs | |||
(2). Rubber Hose | ID-400mm Length-1.5m | |||
(3). Floater | ID-440mm Length-1200mm OD-1200mm | |||
*Quantity depends on real pumping distance* |
- Q: The famous type of cutter suction dredger
- The leading dredging expert, Jan De Nul, will further expand its fleet of ships, which will build a self propelled suction dredger, named JDN8069, at the Croatia shipyard UljanikBrodogradiliste. After completion, the ship will become the world's largest suction suction dredger, compared with Luxemburg, JDN dredging group currently has the world's largest suction suction dredger, "J.F.J. DeNul", power 50%. JDN8069 ship is expected to be delivered in early 2017, global operations.
- Q: Advantages and disadvantages of trailing suction dredger for trailing suction dredger
- Therefore, the utility model is very suitable for the construction of canals and canals in ports or navigable ships. The disadvantage of a trailing suction dredger is that the bottom of the dredger is hard to dig
- Q: What is the working principle of a cutter suction dredger?
- The working principle of cutter suction dredger: to locate the pile as the center, swing to dredge, forward, like walk, another piece of steel columns alternately changing piles, cutter dredging process fanned forward. The operation of the cutter suction dredger can be completed continuously, such as dredging, transporting mud and unloading mud. It is a kind of dredger with high efficiency and low cost.
- Q: How much dredging can the 4000 side /h suction dredge dredge in one day? Soft silt
- The pump in the cabin and the underwater pump are full load. The length of the pipeline is within 3 kilometers, and the depth is about -16 meters. According to the rate of 18 hours per day, the production rate is 61200 according to 3400.The actual amount should be between 45000 and 55000.
- Q: Who has the construction plan of dredger dredger after dredger dredging and dredging with dredger barge?
- Is it a filling scheme for dredger? How about a suction dredger on the side of Qingzhou? Customer feedback is also OK, you can come and have a lookSpecific contact, see user name, basic data
- Q: Does dredging dredger need relevant qualification?
- But if the local government regulations must be legitimate formal dredging project, estimated to need to apply for a ship's certificate, it is equivalent to a person's identity card! If you need Qingzhou Wynn mine, you can go through the whole process, the relevant costs to consult manufacturers.
- Q: Who knows what's the name of the biggest dredger in China?
- Guangzhou Waterway Bureau has the largest grab ship, the maximum bucket capacity of 50, but the efficiency is not as good as the Shanghai Waterway Bureau fighting capacity of Xinhai 27 party round clam.Most of the ships I've seen before, as well as a dredge called a chain bucket dredger, are now out of date.
- Q: What is the difference between a cutter suction dredger and a trailing suction dredger?
- The work of a cutter suction dredger works through an agitator in the head of a straw and straw.
- Q: The working principle of a trailing suction dredger
- The ship is equipped with one or several sets of centrifugal pumps, centrifugal pumps for absorbing water and mud from the bottom of the vessel, into the mud tank. These operations are carried out on the voyage, while air while digging, mud tank fill to throw mud mud area, through the Bilge mud. Handle cases
- Q: What are the crew members on the dredge?
- But in general, the dredger crew responsible for the work can be divided into: navigation, communication and work positioning on the ship, electrician, turbine, maintenance, and operation personnel (dredging) and special equipment (such as grab dredger crane and grab operation, cutter suction, suction dredger winch, water pump operation etc.).
Send your message to us
CSD-300 Cutter Suction Dredger
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords