• Whole Aluminum Formwork System from CNBM, China System 1
  • Whole Aluminum Formwork System from CNBM, China System 2
  • Whole Aluminum Formwork System from CNBM, China System 3
  • Whole Aluminum Formwork System from CNBM, China System 4
Whole Aluminum Formwork System from CNBM, China

Whole Aluminum Formwork System from CNBM, China

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
50000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of  Whole Aluminum Formwork Description 

Whole Aluminium Formwork System is designed to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. All main components are manufactured from high grade aluminium alloy. This structural grade aluminium has exceptional properties being extremely light in weight but also heavy-duty and durable. When incorporating this into a design which utilizes standard components and allows several possible plan and elevation variables, it provides a lightweight solution for a large area slab formwork system.

 

2. Main Features of  Whole Aluminum Formwork

-Light and easy assemble

-Simple structure.

-Competitive prices

 

3. Whole Aluminum Formwork Images

Whole Aluminum Formwork System from CNBM, China

Whole Aluminum Formwork System from CNBM, China

4. Whole Aluminum Formwork Specifications

1: MaximumColumn Size:900 x 900mm

(2’-11.5”x 2’-11.5”)

2: DesignConcrete Pressure: 1,800 psf (90 kN/m2)

3:StandardPanel Width 900mm, 750mm & 600mm

(2’-11.5”,2’-5.5” & 1’-11.5”)

4:StandardPanel Height: 3.0m, 2.4m, 1.2m 

 

5.FAQ of  Whole Aluminum Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your project.       

    . Please feel free to customize.  

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issues


Q: What is the development prospect of aluminum template design?
High quality and stable performance: aluminum alloy template level and vertical degree can be a good guarantee, and the template itself does not absorb water, concrete molding quality is high, so no need for expensive and long plaster work, tiles can also be directly pasted in Inside and outside the wall. In addition, the aluminum alloy template system is based on architectural drawings and then accurate use of computer software and machinery made, so the construction of high precision, especially doors and windows, hydropower equipment with the location and size are accurate and effective Reduce the amount of construction materials used in the latter part of the construction, cost savings.
Q: In the Sheng-aluminum template installation workers, how to develop prospects
Can go to feel, the elimination rate is very high, most of them are left, remember: have the strength to be able to endure hardship, to listen to Sheng Sheng, if you do not need special money, and physical fitness is not good, labor intensity More than your imagination
Q: What is the change in the aluminum template?
Aluminum template system components need to be designed according to the characteristics of the floor, the design of technical staff capacity requirements are higher. Approximately 80% of the modules in the aluminum template system can be recycled in multiple projects, while the remaining 20% can only be recycled in a class of standard floors, so the aluminum template system is suitable for high-level buildings with high levels of standardization. And villa group.
Q: Now the domestic use of aluminum template project more?
Traditional template construction cycle is long, dirty, chaotic, noise, resulting in a large number of construction waste, building materials, resource consumption, high labor costs, and the construction quality is difficult to guarantee. Compared to the traditional construction methods, the use of aluminum alloy template floor can be a whole casting molding, flatness and verticality better, smooth surface plastering, and can be reused more than 200 times. This can not only save a lot of manpower, material, but also can be recycled, energy saving and environmental protection, significant economic benefits.
Q: Whether a shear wall aluminum template and wood template can be mixed
The high strength and stability of the aluminum template are good, and the surface roughness of the concrete is high and the precision is high, which can be removed from the surface. The fixed method is simple and quick,
Q: Aluminum template of the aluminum template advantage characteristics
In areas with high urbanization, the following technical advantages can be demonstrated: 1) Short construction period. Aluminum template system for the quick-release mold system, a set of normal construction of the template can reach four days a layer, and can be better to start the construction of the pipeline, greatly improving the construction schedule, saving management costs. 2) the number of repeated use, the average use of low cost. Aluminum template system using the overall extrusion of aluminum alloy profiles to do the raw materials, a set of specifications can be used to modify the construction of more than 300 times. A set of template purchase prices are spread out than the traditional template to save a lot of cost. 3) convenient construction, high efficiency. Aluminum template system assembly is simple, convenient, the average weight of about 20kg, completely by the manual handling and assembly, do not need any mechanical equipment to help, and the system design is simple, the workers get started speed and template flip speed quickly. Skilled installation workers per person per day can be installed 20-30 square meters, significant savings in labor costs.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords