• Concrete Pouring Aluminum Formwork System System 1
  • Concrete Pouring Aluminum Formwork System System 2
  • Concrete Pouring Aluminum Formwork System System 3
  • Concrete Pouring Aluminum Formwork System System 4
  • Concrete Pouring Aluminum Formwork System System 5
  • Concrete Pouring Aluminum Formwork System System 6
Concrete Pouring Aluminum Formwork System

Concrete Pouring Aluminum Formwork System

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 m²
Supply Capability:
5000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete pouring aluminum formwork system


Concrete pouring aluminum formwork system Advantage

1. Light weight, high strength

 

The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.

 

2. Various sizes, high accuracy

 

The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.

 

3. Safe and convenient construction

 

High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training. 

 

4. Long time used

 

With the lowest average lost, aluminum formworks can be used up to 300 times.

 

5. Wide range used

 

The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

 

6. Excellent quality


The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.

 

7. High efficiency

 

According to different climatic conditions, the formworks can be removed in 18-36 hours.

 

8. Recyclable value

 

The used aluminum material is of greater recyclable value,several times higher than steel.

 

9. Independent support system

 

The gap between the formwork support is totally enough for passing, moving and pulling.

 

10. Dependable safety, environmental

 

The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.


Concrete pouring aluminum formwork system picture

Concrete Pouring Aluminum Formwork System


Concrete Pouring Aluminum Formwork System


Concrete Pouring Aluminum Formwork System


Concrete Pouring Aluminum Formwork System

FAQ


How test the quality?


we have strict quality control department, and when finished the production, we'll try installation first at our factory to find whether have probelm.

Q: What is the development prospect of aluminum template design?
High quality and stable performance: aluminum alloy template level and vertical degree can be a good guarantee, and the template itself does not absorb water, concrete molding quality is high, so no need for expensive and long plaster work, tiles can also be directly pasted in Inside and outside the wall. In addition, the aluminum alloy template system is based on architectural drawings and then accurate use of computer software and machinery made, so the construction of high precision, especially doors and windows, hydropower equipment with the location and size are accurate and effective Reduce the amount of construction materials used in the latter part of the construction, cost savings.
Q: In the Sheng-aluminum template installation workers, how to develop prospects
First, it is obeying the instructions. Then, hard work hard not to suffer. Finally, either honestly go to a climb, or put you out. Solution is completed, I was Sheng through drops!
Q: What is the change in the aluminum template?
Aluminum template design research and development and construction applications, is a major development of the construction industry, the standard aluminum template is also in accordance with the needs of national society, to create a professional green construction, green building, environmental protection and energy conservation, efficient construction industry leading building aluminum template The
Q: Now the domestic use of aluminum template project more?
Traditional template construction cycle is long, dirty, chaotic, noise, resulting in a large number of construction waste, building materials, resource consumption, high labor costs, and the construction quality is difficult to guarantee. Compared to the traditional construction methods, the use of aluminum alloy template floor can be a whole casting molding, flatness and verticality better, smooth surface plastering, and can be reused more than 200 times. This can not only save a lot of manpower, material, but also can be recycled, energy saving and environmental protection, significant economic benefits.
Q: Whether a shear wall aluminum template and wood template can be mixed
The high strength and stability of the aluminum template are good, and the surface roughness of the concrete is high and the precision is high, which can be removed from the surface. The fixed method is simple and quick,
Q: Aluminum template of the aluminum template advantage characteristics
In areas with high urbanization, the following technical advantages can be demonstrated: 1) Short construction period. Aluminum template system for the quick-release mold system, a set of normal construction of the template can reach four days a layer, and can be better to start the construction of the pipeline, greatly improving the construction schedule, saving management costs. 2) the number of repeated use, the average use of low cost. Aluminum template system using the overall extrusion of aluminum alloy profiles to do the raw materials, a set of specifications can be used to modify the construction of more than 300 times. A set of template purchase prices are spread out than the traditional template to save a lot of cost. 3) convenient construction, high efficiency. Aluminum template system assembly is simple, convenient, the average weight of about 20kg, completely by the manual handling and assembly, do not need any mechanical equipment to help, and the system design is simple, the workers get started speed and template flip speed quickly. Skilled installation workers per person per day can be installed 20-30 square meters, significant savings in labor costs.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords