• Walk Through Frames Scaffold System for Sale System 1
  • Walk Through Frames Scaffold System for Sale System 2
  • Walk Through Frames Scaffold System for Sale System 3
  • Walk Through Frames Scaffold System for Sale System 4
  • Walk Through Frames Scaffold System for Sale System 5
  • Walk Through Frames Scaffold System for Sale System 6
Walk Through Frames Scaffold System for Sale

Walk Through Frames Scaffold System for Sale

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
100 set
Supply Capability:
10000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Walk Through Frames Scaffold System for Sale


Outside Diameter: 1.69" 
Wall Thickness: 0.095" 
Lock: Drop Lock 
1st Lock: 6" from top of frame leg 
Lock Span: 4'

Coupling Pin Hole: Drilled at 45° Angle 
Coupling Pin Hole Location: 2½" from the top of the frame leg. 
Blue powder coating prevents rust and minor scratches.

 

Frame Scaffolding Advantages:
1) Reasonable structure, simple assembly, quick operation, safety & reliability;
2) Easy to carry and operate

3) Wide applications, for both inside and outside construction


Name

Main Frame Scaffolding H Frame Scaffolding

Size

5’x5’

Main Material

Q235

Surface Treatment

powder coating

Color

blue

Certificate

OSHA

Service

OEM Service available

MOQ

one 20'container

Payment

L/C,T/T

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request





Walk Through Frames Scaffold System for Sale

Walk Through Frames Scaffold System for Sale

Walk Through Frames Scaffold System for Sale


Walk Through Frames Scaffold System for Sale


Walk Through Frames Scaffold System for Sale

Walk Through Frames Scaffold System for Sale

Walk Through Frames Scaffold System for Sale

Walk Through Frames Scaffold System for Sale

Walk Through Frames Scaffold System for Sale




why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 

Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

Our firm belief that our customer's success are the only guarantee of our success .




OEM severice avalible

1)our ability to customized production to meet customer's specifications and requirements

2)our focus on building deep long-lasting relationship with our customers 

3)our commitment to meet customers needs  

Quality comes first ,customers are the highest ,operate with honest





Q: What are the requirements for the construction of the scaffold eye in the building?
Calculation basisScaffolding input: for the template support part of the steel pipe material in accordance with the 1.5 layer of the amount of consideration: the amount of external scaffolding steel pipe in accordance with the full closed scaffolding consideration; safety net in accordance with the external scaffolding full consideration.
Q: Cantilever scaffold technical disclosure
The surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scarring, delamination, dislocation, hard bending, burrs, indentation and deep drawing.
Q: What is a bowl buckle scaffold?
Compared with other types of scaffolding, bowl buckle type multifunctional scaffolding is a new scaffold with broad development prospects.
Q: How to set up the temporary structure of the external structure of the balcony on the two structure
Earthwork:The pile cap is shallow, the foundation beam and sand filling quantity is less, the depth is to the outdoor floor 1.5m, so the earthwork construction adopts the mechanical leveling site construction scheme. Backfill soil must be layered compaction, density of not less than 0.9. Construction lap should be compact, interval time should not be too long, in case of rain water, the construction of various types of pipe should be synchronized with the foundation construction.
Q: What are the full house scaffolding specification
Preparation of "full house scaffolding construction plan" according to the specification including but not limited to the following:1 "steel pipe scaffold fastener" (GB15831-2006)2 "technical code for safety of high level construction work" (JGJ80-1991)3 "technical code for safety of scaffold for building construction" (JGJ202-2010)4 "code for safety of steel tubular scaffold with couplers in construction" (JGJ130-2001)
Q: The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
Schedule A.0.2 role: the calculation of scaffolding, the need to calculate the bearing capacity of the scaffolding
Q: Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q: A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q: The outer hanging scaffold board 12 embedded parts embedded in the crack?
Cantilevered scaffold generally has two kinds: one kind is each layer of a pick, the vertical rod at the bottom of the top in the construction site, floor beam or wall, outward tilt after fixed on the upper part of the erection of scaffolding construction, rail laying layer, construction of a story, to be transferred to the upper layer, and then re ride scaffold provides a layer of construction; the other is the multilayer cantilever scaffold, the full height is divided into several sections, each section of the erection of a height of not more than 20m, the use of cantilever beam or cantilever frame for scaffold based subsection overhanging scaffolding section, this method can use scaffolding over 50m the overhanging scaffolding facade to be set up scissors.
Q: What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords