• Unisulated Aluminum Flexible Duct for HVAC System 1
  • Unisulated Aluminum Flexible Duct for HVAC System 2
  • Unisulated Aluminum Flexible Duct for HVAC System 3
  • Unisulated Aluminum Flexible Duct for HVAC System 4
  • Unisulated Aluminum Flexible Duct for HVAC System 5
Unisulated Aluminum Flexible Duct for HVAC

Unisulated Aluminum Flexible Duct for HVAC

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
100000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1.Structure of Aluminum Flexible Duct for HVAC

Aluminum Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation    applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible, it is easy to run  around and through obstacles in the building.

Flexible Duct Usage:

1. Ventilation system, Extraction of solvents, Extraction of corrosive gas and fumes

2.Vehicle construction, Engine construction, Exhaust fumes extraction

2.Main Features of Aluminum Flexible Duct for HVAC

1. It's a range of fully flexible un-insulated aluminum PVC laminated ducting, it is easy to connect to ducting

2. Highly flexible

3. Excellent resistance to chemicals

4. Small bending radius

3. Aluminum Flexible Duct for HVAC Images

 

4. Aluminum Flexible Duct for HVAC Specification

PROPERTIES

VALUE

DIARANGEMETER

80~1200MM(3”~48’’)

TEMPERATURE RANGE

-30~+250

VELOCITY OF AIR FLOW (MAX)

20 m/s

WORKING PRESSURE

2500 Pa

BENDING RADIUS

0.54*D

STANDARD LENGTH

7.6M OR 10M

5.FAQ

We have organized several common questions for our clientsmay help you sincerely

 ①What’s the Application for the products?

Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation    applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible,it is easy to run  around and through obstacles in the building.

     What’s the Advantages for the products?

              No need special tools for cutting

  In case of fire no toxic gas are emitted

The product have been successfully tested for fire resistance

Can be bent in any direction

     How long can we receive the product after purchase?

In the purchase of product within two working days, We will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 7 to 10 working days can be served.

 

 

Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.
Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
After learning that feel boring, to diverted it, brush point repair it. Architectural design institute will need to design equipment (that is, plumbing) design talent, that is, will generally participate in architectural design, the wages should be
Q: Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
The general level of more than 12 layers when you need to use.
Q: Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
Q: What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q: External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q: Ventilation is very good, why still have to install fresh air system
Also known as foam board, EPS board, is containing volatile liquid blowing agent of the polystyrene beads can be preheated by heating, heated in the mold and the formation of white objects
Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Polystyrene should not be polycyclic aromatic. Polycyclic aromatic groups generally refer to aromatic groups when multiple benzene rings are used. Not all of the hydrocarbon chemical products are carcinogenic, and our bodies are producing hydrocarbon compounds all the time. Polystyrene carcinogenicity is small. General benzene ring on the more substituents, the toxicity is relatively small, such as toluene is less than the toxicity of benzene. Of course, there are many compounds with benzene ring, so there are a lot of scholars to study with our body creatures do not meet the quality of raw materials to do the polymer, such as lactic acid production of polylactic acid, but the current Can be put into use much.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords