Aluminum Flexible Duct Uninsulated for HVAC
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 100000000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Aluminum Flexible Duct Uninsulated for HVAC
Introduction
This type of duct is made of reinforced aluminum foil coating.The inner part is filled with highly tensile spiral steel wires to support the duct.It is generally applied on low to medium air velocity with temperature variation system.This product has passed GB8624B1 fire resistant test.
Specification Description
Thickness of aluminum foil | 0.0065mm |
Thickness of PET | 0.012mm/0.015mm |
Density of cotton | 16kg/m3;20kg/m3;32kg/m3 |
Thickness of cotton | 25mm |
Diameter of steel wire | 0.8mm/1.2mm |
Glue | hot melt adhesive /polyurethane |
Caliber | 4"~20" |
Package | Box/bag |
Length | 6m/10m |
Technical Target
Operating temperature range | -30oC~140oC |
Max air velocity | 30m/s |
Max operating pressure | 2500pa |
Meltingpoint of hot melt adhesive | 130oC |
Parametric Table
Number of plies | Max operating temperature | Materials |
Single ply | 120oC | single-ply aluminum foil and single-ply PET film compound |
Double plies | 140oC | single-ply PET to place in double-ply aluminum foil |
Four plies | 220oC | Doulble plies of single-ply aluminum foil |
Six plies | 250oC | Double plies of double-ply aluminum foil |
We are pleased to supply products according tothe requirement of our clients!
Production Flow
- Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
- But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
- Q: Air to water heater host and air conditioning host is not the same
- This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
- Q: Air conditioning ventilation when the sound is a big reason
- According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
- Q: US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
- Among them, the extruded polystyrene gypsum composite board is based on paper gypsum substrate, the use of adhesive and extruded polystyrene board through the factory processing compound
- Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
- Extruded board of course, can generally use this to do, indoor and outdoor to do almost, most of the outside is done because of saving space inside the room. Recommended: do indoors, because I was doing the external walls, the insulation often do, the wall is not very good for the first time, because you do before the insulation wall itself is the weight of the valve valve closure of the bone shop stall wipes , Benzene board sticky benzene board is not very strong, live well for a few years, bad two or three years there will be signs of shedding, looking twice thinking.
- Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
- From the outside: ① rigid waterproof casing is only composed of steel casing and wing ring, simple structure; ② flexible waterproof casing mainly by: flange casing, seals, flange pressure plate, wing ring, bolts, nuts Composition, complex structure From the waterproof performance up to choose: ① rigid waterproof casing is outside the wing (ring made of steel ring on the steel pipe), installed in the wall (mostly concrete wall), for the general pipe wall, ; ② flexible waterproof casing in addition to the external wing ring, the internal file ring and the like, the flange wire, there are sets of sales, but also their own processing, for the need for shock absorption pipeline, such as and pump connected When the pipe is through the wall In other words, if the wall on both sides of the waterproof performance, it is necessary to use flexible waterproof casing; if only to consider the pipe through the wall, without considering the wall, the wall on both sides of the waterproof performance and displacement of the pipeline deformation You can use rigid waterproof casing
- Q: What is the whole heat exchange fresh air ventilator?
- (GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
- Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
- 2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
- Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
- Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
- Q: HVAC Heating: What are the main components of the air distribution system?
- (HS Code) Yes, the tax rebate is 13% (April . 2009 latest data). Floor of the board of the tax number is, the tax rebate is 9% (June . 2009 the latest data), floor board is the inspection of goods, exports need to be checked. There is nothing to understand where to add me MSN:
Send your message to us
Aluminum Flexible Duct Uninsulated for HVAC
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 100000000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords