trolley mechanism 3JXD1
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction
On the basis of absorbing advanced foreign technology, our company developed the JXD trolley luffing mechanism independently for small and medium-sized tower cranes.
This series of trolley mechanism consists of electromagnetic double-speed change-pole motor, semi-concealed planetary reducer, drum, frame and other components.Its characteristics include compact sturcture, high driving efficiency, and low noise, safe and reliable braking, accurate positioning, pleasing in appearance and so on. When users have higher requirements to the trolley running, variable- frequency speed regulation motor with the same interface and relevant electric contol system may be changed to form the variable-frenquency speed regulation trolley mechanism.
Performance parameters
Model:3JXD1
Motor Power(KW):3.3/2.2
Rated single rope tension (N):3400
Single-rope linear velocity(m/min):40/20
Rope capacity(m):59
Wire rope diameter(mm):7
Relevant parameter of the suitable tower crane
--Max lifting load(t):8
--Max crest(m):61
- Q: The crane will only be needed once. Is it possible to hire them?How much in general would a company charge to bring one in?
- This Site Might Help You. RE: How much does it cost for a crane to come to a worksite and put a roof on a house being built? The crane will only be needed once. Is it possible to hire them? How much in general would a company charge to bring one in?
- Q: Would you say that Ichabod Crane is socially awkward??
- absolutely.
- Q: A solid answer and links would be nice.Your help and/or attempts to help are appreciated
- www.pacificfriend.ca/html/one_tho... This site will give you the story of the Japanese girl during the time of WWII. It is a touching story.
- Q: What qualifications do you need to be a Crane Operator in QLD, Australia?
- You need to do a specific amount of hours in training to be a crane operator in Australia, I know that in Sydney, you are certified by the WorkCover Authority, or that's how it was many yeas back. Special emphasis is on loads, and point of load. We do not need a mobile crane tipping over do we. Safety, working near electrical, and on soft ground. Weight you can extend to on a jib. etc.
- Q: He is one of my favorite poets. I want to read more of his work.
- How about my favorite poem about Hart Crane? AT HART CRANE’S TOMB by Glenn Robert Swetman In his mind’s dark, he spoke a frivolous age where marriage of the like was spring, where vitelline worlds of virgin instinct were crushed in the obscene cleanliness of a raccoon’s paw. Did he imagine that his great sun could come trailing yellow handkerchiefs of light, like a queer comet? No, there is something out there that commands, and not worlds of perfect clipping will turn these rotund hedges into maypoles—and live. That’s why the green expands as it reaches. He must have seen this finally. His leap Into the green sea was, aesthetically, clean.
- Q: I have to build a hydralic system that can pick up a paper clip . the supplies you are allowed to use are 10 straws, 5 pipe cleaners, 1 yard of masking tape. 10 note cards. 2 syringes and tubing. 5 rubber bands. 8 popsicle sticks. 2 feet of string. 1 magnet. Please help.
- build a basic crane out of your materials and thread the string to the magnet hold it on with tape secure opposite end of the string to the plunger on one syringe. and fix this syringe(syringe 1) to the frame of the crane. position the plungers of both syringes at mid point, and fill both with water, and fill your tubing with water. connect the needle ends of both syringes together with the tubing. pushing the plunger on syringe 2 will cause the plunger in syringe 1 to move out. pulling the plunger on syringe 2 will cause the plunger on syringe 1 to retract and can be used to lift the paperclip.
- Q: Like those three hundred or four hundred meter tall skyscrapers, where are the bottom of these tower cranes installed?It doesn't go up from the ground, little by littleWill the crane not fall down?
- A firm foundation is built before the tower crane is used, and then the crane is fixed to the foundation
- Q: I can't seem to find the item I'm looking for on-line. Maybe some fellow crane operator happens to know where I can find this. It's a quick releasing crane hook, it drops the load on cue. I think it would probably be remote-controlled.
- We manufacture a QUICK RELEASE FOR CRANE look at www.craneequipment.ca
- Q: Can the attached arm of the tower crane be welded?
- The following points: the calculation of tower crane according to the instructions provided with the attachment of the building, a maximum load attachment device (Fig. 14-44), therefore, should be in the way of adhering bar load as the design or check attached bar section basis.
- Q: Is the first entry into the construction project? Or direct access to fixed assets?
- First in the construction, some costs incurred during the installation, after installation costs together included in the original value of fixed assets.
Send your message to us
trolley mechanism 3JXD1
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords