Tower Cranes New Design Electric QTZ80(PT5610)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ80(PT5610) Description
Feature: Tower Crane Condition: New
Application: urban construction Rated Loading Capacity: 6T
Rated Lifting Moment:400KN.M Max. Lifting Load:6T
Max. Lifting Height:130M Span: 56M
Model Number:QTZ80(PT5610)
Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate
Colour: Orange/ Yellow
After-sales Service Provided: Overseas third-party support available
QTZ80(PT5610) Features
1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary or Travelling, external or internal climbing tower crane
4. Impeller blasting or rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Engineers available to service machinery overseas.
QTZ80(PT5610) Specification
QTZ80(PT5610) Pictures
QTZ80(PT5610) FAQ
Q: Do you have any certificates?
A: We have passed CE certificate and ISO9001:2000 Quality Control System.
Q: What is counter weight? How kinds?
A: Counter weight is for balance the suspension mechanism. There are 2 kinds of counter weight, one is made by iron, the other is by concrete.
Q: Do you have any other types of suspended platform?
A: Yes, we have. Such as round suspended platform, using for the chimney, and slewing cradle, right angle platform, double deck platform, etc. We have strong technical team, we could design the suspended platform according to the customer’s request.
- Q: have you noticed that there has been an exceptionaly high volume of cranes falling over in the U.S.A. this year? 2 cranes went down this week, one in Texas killing a man. seems like there has alot of this lately, what the hell is going on with the cranes? ever night i turn on the news its like a deadly crane accident took place today . thanks.
- My brother is a crane driver, and its scary when you hear about these accidents. Last week a man was killed in a quarry when the crane he was in touched an electric wire
- Q: how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
- Usually it is the rigger who attaches the lifting gear not the crane operator who needs to know about centriods and even then the real trick is getting the slings or other lifting devices in the exact place. That tends to be a bit of trial and error unless the lifting points are clearly marked.
- Q: how to do tower crane maintenance?
- Tower cranes in construction is being inspected as part of everyday maintenance. Usually, Safety In charge or a mechanical engineer do the inspection on site. Some pointers for inspection are: 1. Machine checking including motor 2. Emergency break 3. Lifting cable checking 4. Power panel 5. others Not only the tower crane is being checked, the operator and rigger also attends daily safety toolbox to update themselves on daily safety hazards on site
- Q: is was about making this game where this guy knows crane style
- There okorder /
- Q: Is there a certain direction and reason a construction worker will leave a crane facing a certain direction.
- I don't think there is a particular direction unless prevailing winds are a factor. Here in Las Vegas, cranes, when idle don't seem to have a pattern. At least from what I have seen.
- Q: Today, my boyfriend surprised me with an origami bird he'd made for me the night before, just for no reason. He told me he'd tried to make a crane but it got to be to complicated. I thought an was an incredibly sweet gesture, and I thanked him thoroughly. I was wondering if it would be nice to give him an origami something back? I found a really easy video on how to make cranes and I made one, but I don't want it to seem like I'm trying to show him up, I just want to show my gratitude. Would it be best to give him the crane, give him a different origami animal, or just let the whole thing go? Sorry if it seems like I'm over thinking this, I just really like him :)
- i really dont think he would want a crane back... because he made that crane especially for you ^_^ and you should just tell him how sweet you thought it was that he made one for u =]
- Q: These cranes always stay higher than the construction process but I have never seen how they are extended to stay above all of it. They come in two formats, free standing and those attached to the building. The possibilities that I thought of was that maybe they use another crane to lift the housing and the horisontal arm to put in more modules into the vertical part; or that they extend it by some way by putting modules in at the top or bottom and that the crane has some self-lifting mechanism to accommodate the insertion of more modules. However, I have never seen this being done, nor does the construction of these cranes point to its ability to do so. The only other possibility that I could think of was that the crane is set up at the outset to be higher than the completed height of the building, hence there is no need to extend it but this does not explain how they do it for very high buildings where the crane is attached to the building and seems to grow higher with the building.
- The cranes are self erecting. The cranes tower is raised in sections. The lowest section is jacked up to the correct height and then a new section inserted and so on.
- Q: What is the maximum weight an industrial crane can lift?
- Last okorder /
- Q: i need to know:how long is the stock (extended and non-extended)how wide is the stockand how thick is the stockthanks.
- ever think of googling standart crane stock ?
- Q: live in marshes???
- Seem for wild animal rehab centers or just google search these in ur area or name ur local animal refuge and explain whats occurred and ask if they could advise a place to name.
Send your message to us
Tower Cranes New Design Electric QTZ80(PT5610)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords