Tower Crane TC7034 Construction Equipmen Wholesaler Sales
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC7034 Description:
1.CMAX Tower Crane TC7034 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC7034 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC7034 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC7034 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC7034 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC7034 Parameter:
Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50
Max height with attachment (m) 200
Working range can be adjusted (m) 50、55、60、65、70
Min working range (m) 2.5
Max lifting capacity (t) 12
Tip load @ 50m (t) 3.4
Tower Crane TC7034 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC7034 Diagram:
Tower Crane TC7034 Technical Sheet:
Tower Crane TC7034 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC7034 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “34” means the tip load is :3.4 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: where can i find the xxx video of bob crane?
- I think they're in police custody or destroyed. Some of the women in his videos were suspects (or at least persons of interest). Police feel his murder may have been by a jealous husband or boyfriend. In just recent years someone was tried for the murder and they were found not guilty. If you ever do find videos of Crane tell me where.
- Q: I was wondering if this is possible. The wall we have designed is very close to an existing retaining wall. In order to properly form and waterproof the wall we would have to demo that existing retaining wall. My idea was to build it off site, waterproof it, and then crane it into its location. Is this possible? any similar methods? thanks
- Possible but difficult. You could tell us what the wall is made of? Assuming stone, then you can't lift a stone wall unless you have a steel plate under it, as it will collapse otherwise. That gets complicated. Yes, you could build it with a 1/2 inch steel plate under it, and lift it that way, assuming it is not too long, and crane it into position, but you then have to slide the plate out without cracking the wall, also difficult. The plate is expensive, the crane is expensive. But what do you gain? You still have to demolish the old wall, you still have to build a new one, so what would you gain by building it somewhere else and moving it?
- Q: I have a 2 year old bearded dragon, and there r tons of crane flies flying around everywhere outside. i was wondering if she can eat them in small amounts?
- I wouldn't recommend it. I couldn't tell you if they are safe, but, at the very least, there is a very real risk that they may have been exposed to pesticides and other chemicals... Even if the crane flies themselves are safe for the dragon to eat, they may be exposing him to chemicals... And parasites, for that matter. It's all around not a good idea to feed wild-caught bugs.
- Q: Okay, well obviously, in The Legend of Sleepy Hollow,he was ugly, but wat exactly made him ugly?? it tells you, but its way too complicated for me. Could anybody just make it... simpler?
- His okorder /
- Q: I used to buy a new tower crane that was attached to someone else's unit and (the key Gou Er). Now I have set up a company myself and bought a key, Gou Er. The question is, now how can I put it back from someone else's key dog and bring it back to my own dog?Know about the urgent urgent urgent urgent call to inform the mobile phone can ah ~ ~ ~ ~ ~ ~ thank you!
- Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
- Q: i have a female Doberman 4months old. running here n there, we spend time with her morning and night, four days per week we go to a big ground and walking with her more than a hour per day, is it adequate? she seems very happy and waiting for us on every evening (me and my wife) also i need an advice on her crane? i have put her in some what big (5ft 4ft) place beside my front door, not fully covered but well sheltered by the house roof/. is it ok to have an open crane like that?
- This is a little difficult since your spelling and syntax leave a lot to be desired. An open crate which I think is what you are referring to is usually not adequate unless you live in a very benign climate. Not too hot or too cold, not rainy or windy. Most dogs like a house or crate that is sized to them so they feel like they are in a small cave or shelter that they can defend from sneak attack by other dogs or even cats. Her short hair coat and dark color mean she needs to be protected from both too much sun and too cold weather. Temps below 40f. or above 90f she should have heated or cooled shelter or be in the house with you. If she is outside exercising in temps below 32f. she should have a dog coat and booties. Adding a good size solid wall crate to her shelter area will probably be plenty and it is a good idea to have her used to a crate in case she needs to be transported to a vet or stay in a kennel overnight in an emergency. Is she allowed in the house with you? At 4 months I doubt she is reliably house trained and that is something which should be accomplished easily in the next 2 or 3 months but it does require that there be someone home with her to take her out at least every 2 - 3 hours until she gets in the habit of holding it until she is let out. She is developmentally capable of that but needs to be taught. It sounds like you are spending quite a lot of time with her and getting her plenty of exercise and that is vital. Dobies are big lap dogs that like to be right there with you whatever you are doing and it seems like she has that too. Good luck and life with your dobe. They are one of my favorite breeds.
- Q: did stephen crane win any awards?
- Stephen Crane (November 1, 1871 – June 5, 1900) was an American novelist, short story writer, poet and journalist. Prolific throughout his short life, he wrote notable works in the Realist tradition as well as early examples of American Naturalism and Impressionism. He is recognized by modern critics as one of the most innovative writers of his generation.
- Q: Lets say you are calling to get a crane truck to lift something, and they have 3 sizes of crane trucks. 17T (with a 70 ft boom), 23T (with a 101 ft boom), and 35T (with a 115 ft boom).All they ask for is how high you are lifting your equipment, how far over, and how many pounds it is.How do you use this information to calculate which size crane is used?
- I am not sure that you are giving us sufficient information. I presume that your crane truck has the boom hinged quite close to the ground, but I am sure that the specified lifting weights will not be achieved until the boom makes an angle of at least 45 degrees with the ground. The 115 foot boom will then sweep a circle of 115 x cos(45) = 81.3 feet, and lift a maximum of 115 x sin(45) = 81.3 feet above the hinge. If the boom is elevated to a 60 degree angle, the circle swept will be only 57.5 feet, but it will lift 99.5 feet. If the boom is lowered to 30 degrees, the circle swept enlarges, bt the distance lifted drops, and the weight lifting capability will also be derated. If the crane has a tower and the weight rating is for a horizontal boom, the maths are quite different.
- Q: what does a paper crane represent/symbolize?
- to get well. if someone you know is sick the Japanese say a thousands cranes will make them well.
- Q: when a skyscraper is done being built, how does the crane come down?
- Most probably you are referring to the Tower Crane. Interesting questions should have followed, like: How is it constructed while the construction is in progress? How is the placement of the Tower Crane determined? What happens to the space occupied by the Tower Craneafter work completion? How far should the 'boom' (the arm that has a moving pulley) go? Anyway, your question is a good one, because when I had my first construction work, the Tower Crane was already there and I was thinking of how to dismantle it afterwards. The dismantling process, is done part by part, set by set starting from the top going down. Another interesting question is: How would that excavating truck or bulldozer be able to get out of that deep matt excavation after all excavation works have been accomplished? It is interesting to note that an earth ramp is created while excavation progress, until the machine is down deep in the excavation and seems that it is impossible for it to get out after excavation work is done?
Send your message to us
Tower Crane TC7034 Construction Equipmen Wholesaler Sales
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords