• Tower Crane TC7021 Construction Equipment Wholesaler Sales System 1
  • Tower Crane TC7021 Construction Equipment Wholesaler Sales System 2
  • Tower Crane TC7021 Construction Equipment Wholesaler Sales System 3
  • Tower Crane TC7021 Construction Equipment Wholesaler Sales System 4
Tower Crane TC7021 Construction Equipment Wholesaler Sales

Tower Crane TC7021 Construction Equipment Wholesaler Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7021 Description:

1.CMAX Tower Crane TC7021  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7021 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7021 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7021  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7021  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7021  Parameter:

 Max. working range 70m, tip lifting weight 2.1T and Max. lifting weight 12T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 40、45、50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 12

Tip load @ 50m (t) 2.1


Tower Crane TC7021   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7021Diagram:

Tower Crane TC7021 Construction Equipment Wholesaler Sales

Tower Crane TC7021 Construction Equipment Wholesaler Sales

Tower Crane TC7021 Technical Sheet:

Tower Crane TC7021 Construction Equipment Wholesaler Sales

Tower Crane TC7021 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7021 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “21” means the tip load is :2.1 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: How to choose tower crane in engineering, such as arm length and lifting weight?
1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
Q: Synopsis for the poem Lost Dances Of Cranes?
If this is the poem, you will find several comments at the link provided. Your fields are empty now. Only your ghosts dance while cranes of another kind dance cities into being. All that remain of you are a fading crackle of your energy and some grainy video footage that people in the new cities will watch to marvel at the wonders the world once held. craftygreenpoet.blogspot .uk/20...
Q: I already have 864 cranes and I wanna know what kind of wishes can I make? And are there consequences?Can I wish something like my mom won the lottery and we become rich? (Just an example!)And can you wish for death? (Just a question!)
You can make whatever wishes you want. Just remember that the wishes you make reflects what kind of person you are. So maybe you should make wishes you can be proud of. Also remember, if wishes were horses beggars would ride If you for example would wish that you would have $10, your wish is most likely to be fulfilled if you manage to sell each origami crane for 1 cent... Generally wishes come true if you really work for them, Not by sitting, doing nothing and wishing.
Q: I know, do you know?
They build it on the ground, raise it up with another crane, and then lift the counter weights up!
Q: why do siberian crane migrate in india?
The Siberian Cranes nest in western Siberia . During Winter season in Siberia , they migrate to India which is their wintering ground.The migration route stretches for 4000 miles. Their resting place at the time of migration is the Lake Ab-i-Estada in Afghanistan. The Kaladeo Ghana National Park or the Bharatpur National Park has been declared a world heritage site because the Siberian Crane traverses nearly half of the globe to reach it. The Siberian Crane is presently an endangered species. Larger numbers of birds have been hunted down over the years especially when they undertake the perilous journeys across the Himalayas to reach the wet land. They are shot down in Pakistan to be gifted to friends and relatives. This has led to a severe decline in the number of Siberian Cranes in the world. The immediate need of the hour is to provide safety to the Siberian cranes along their migration route. This popular visitor has not been seen in the last two years in India. The last pair of Siberian Cranes which had made the Bharatpur Bird Sanctuary their seasonal home in the year 2002 was not seen in the year 2003. Their absence is indeed painful and one of the aims of the Crane foundation is to bring back the Siberian Crane to India.
Q: I am making a lot of little paper cranes, and so far I have 144 cranes. I want to know what different number of cranes mean. Like, what do 100 cranes mean? Good luck? Long life? I don't know!!! So what do 100 cranes and 1000 cranes mean?!? Please answer if you know, this question is almost driving me crazy!!!!
A Japanese legend indicates that anyone who folds 1000 paper cranes will be granted a wish. Sadako Sasaki was a Japanese girl who died from radiation sickness from the A-bomb dropped on Hiroshima. She wanted to fold 1000 cranes before her death at the age of 12. There is a peace monument to her memory in Hiroshima, and people from all over the world send paper cranes to the site.
Q: How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
Building Cranes
Q: A crane lifts a 1265 kg steel beam vertically 26 m, it then stops and swings the beam 3 m horizontally into a position where the welders can secure it into its proper position. What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
Q: I've been watching Passions for years and I don't understand what in the world is going on between Fancy and Pretty Crane... what did Pretty do to her??
It has something to do with Fancy taking a boy away from Pretty that she liked a lot when they were younger. You know Fancy used to be a *****.
Q: We had a very large tree removed from beside our house. The crane parked in the driveway and caused four very large depressions and crushed concrete.
Yes- it almost certainly will be covered. Most (if not all) homeowners policies provide coverage for driveways, walkways, etc. See your policy for specific language. I was an adjuster for 15 years, and I handled this sort of claim on a regular basis. It is very common for large vehicles to damage driveways, especially dump trucks. As long as there is sufficient evidence that the crane caused the damage (rather than normal wear and tear) it will almost certainly be covered. Your homeowners insurance will then subrogate against the tree removal company.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords