Tower crane is used to lift, lower and horizontally move materials in construction and other industry. It has large lifting capacity and lifting height, wide moving range, and can rotate. It basically consists of base foundation, mast, slewing unit, working jib, counter jib, counterweight, hook, and operating cabin.
Features:
1. High working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
2. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
3. The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
4. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
5. LVF: Frequency control, variable speed, smoothness and high stability, non-striking.
6. Moment motor, high stability, long working life.
7. SM: Three-speed change pole motor, simple in structure, economical ,fitting.
Specifications:
- Q: How come you never see cranes being transported from one site to another?
- Many are too large to be transported whole, and are assembled on-site (or even build for a single on-site use).
- Q: JKD (Jeet Kuon Do)These are the best ones closest to my areaand i want to know which one is the best in terms of fighting (got the most effective and powerful swift moves)also one which has the best weaopn training and teaches you good trapping and pressure point techniquesWhich is the one which is shown in the movies most and what movies You dont need answer all of them just the main question which one of these are the best for fightingthnxxx
- Er... fake-ish. Any approach that emphasizes stand-up combating and have an impact on-most effective approaches would not have as well an reply as grappling/groundfighting techniques, however hitting any person is larger than not anything in any respect. I additionally do not suppose that the majority streetfights turn out to be at the floor, except you imply one fighter finally ends up at the floor upon getting sucker-punched. And kung fu is a beautiful extensive time period, and it isn't a well concept to color all Chinese techniques, of which I was once as soon as informed there have been over four hundred distinct varieties, with the identical brush. Some techniques, corresponding to puppy boxing, truthfully revolve round a downed opponent attacking a status opponent. But if you are pronouncing that finding out CMA's won't make you a well groundfighter, I agree.
- Q: a crane lifts load of 500kg mass to a distance f 20m in 10s at a constant velocity. how much work is done?
- work done(W) is given by the change in the potential energy(P.E). here, initial P.E = 0. final P.E = mgh = (500)(10)(20) = 100000 J =100 KJ (kilo joules) therefore work done = 100 KJ. here distance means vertical height.But if the crane takes the load parallel to the ground ,then work done will be zero.Time is given here to calculate the power of the crane given by work/time = 10 KW(kilo watts).
- Q: What is the easiest way to transport vertically? What is applicable?What is the difference between tower crane and tower crane?
- Tower crane, tower crane, also known as tower craneTower crane = tower crane = tower craneThere are many ways of vertical transportation. Construction elevator hoist etc..Tower crane features: large operating space, mainly used in housing construction materials vertical and horizontal transmission and installation of building components.It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
- Q: What kind of equipment must be installed on luffing trolley of horizontal luffing tower crane?
- It must be installed:To prevent the trolley cable broken car slip away;The car must have a support wheel to prevent the trolley from hanging in the middle.
- Q: How do cranes get from one construction site to another without hitting streetlights, wires, car, buildings?
- They are disassembled and loaded onto flat bed trailers. The larger the crane the more flat beds.
- Q: Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
- Fast Crane = A unload x /hour Slow Crane = B unload y /hour A + B = 8 hours x /hour + y /hour = 8 hours (average rate) average rate = (x + y) / 2 so 8 hours = (x + y) / 2 and x + y = 16 since the slow crane is 12 hours longer, x must be 2 hours, since they will both take 2 hours and the slower crane will take 2 hours plus 12 hours equalling 14 hours. The rate of crane A is 2 hours to unload and the rate of crane B is 14 hours to unload. The average rate for both to unload is 8 hours. There were certain assumptions made to solve this puzzle and it is not clear how they actually operate on the ship while unloading. ~~ The most practical way to unload the ship is *NOT* to use the slower crane since it takes longer for them to work combined, than for the faster crane to work alone !! A tricky but fun question !! :-b
- Q: what is the proper way to fold a paper crane?
- I would go to a library or a book store and find a book on origami.
- Q: What are the common problems encountered in hiring cranes for house constructions?
- Access, I assume you need a Franna. Possibly for frames and or trusses to the second level or steel beams. You will be limited by reach if the crane can only access the front of the house. In which case you may need a slew crane 30t or larger. Know the weights of what has to be lifted and the distance from the crane to where it will be placed. A crane cannot set up or travel over underground services or recently filled excavation. These things could mean the crane has to set up even further away from the house. If the crane is for unloading trucks, access again. Cranes need to stay about 3meters from power lines which is a common problem bringing gear onto site. While a slew crane generally sets up in one position for all lifts (some can travel) a Franna is designed specifically for pick and carry. It can unload trucks and travel the gear onto site under the power lines. Provided it isn't lifting extra large items. Speak with the provider about what has to be done, it will be all to familiar for any decent company. As long as access is fine and underground services won't hinder you they should know exactly what you need. Be prepared, usually a minimum 4hr hire. If you think the task is going to take longer you need to plan what has to be done and have everything ready for placement. Organization is paramount, you don't want a crane and it's crew sitting there doing nothing because you didn't plan ahead. Hope this helps, I could have been more specific if the question had some details.
- Q: I read this book recently and i got emotional over it. It relates so much to my life and i think maybe i know what my dad was thinking before he died. I was just wondering what was your reaction after reading this short story?
- This book gave me lots of hope. I really loved to hear about Sadako and how she folded so many cranes. I wanted to believe that she would finish the paper cranes and she would get better. When she died in the ending it was very sad. Someone with so much hope and motivation doesn't deserve to die. The book also made me think a lot about why Sadako was sick in the first place. She was only two-years-old when the Americans dropped the bomb on Hiroshima, but she was still eventually killed from it. This book shows the long-lasting effects war has on a country and its people. It really makes you think twice about war. I really enjoyed reading this book. It was an easy read that I had a hard time putting down. Every chance I got I read this book! While it was sad in the end, it was great to hear about Sadako's life and how her friends finished her paper cranes for her. The plot was interesting and exciting. I really like the main character too. Sadako was a very brave, strong person that I wish I was more like. She woke up every day with the will to live and that gave me a lot of hope.
Send your message to us
Tower Crane TC6024 Construction Machiney
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 15 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords