Tower Crane TC6024 Construction Equipment Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC6024 Details:
Minimum Order Quantity: 1unit Unit: unit Loading Port: China main Port
Supply Capability: 5unit/month Payment Terms: T/T or L/C
Tower Crane TC6024 Description:
1.CMAX Tower Crane TC6024 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC6024 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC6024 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC6024 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC6024 Parameter:
Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50.5
Max height with attachment (m) 200
Working range can be adjusted (m) 48、54、60
Min working range (m) 2.5
Max lifting capacity (t) 10
Tip load @ 50m (t) 2.4
Tower Crane TC6024 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC024 Diagram:
\\
Tower Crane TC6024 Technical Sheet:
Tower Crane TC6024 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: Where was the construction machinery conference held in 2015?
- Organizer: China Academy of machinery science and engineering machinery and military modified vehicle testing center, Shandong Bada International Engineering Machinery Company Limited, Shandong Bada Luqiao Construction Co. Ltd. and Shandong northern Luqiao Engineering Company Limited. Organizer: Shandong Bada international engineering machinery City, Lee brothers auction, Beijing Shengda Trade Center, Hing Beijing power machinery and equipment in the international science and Technology Co Ltd
- Q: Changsha Sanlian Building Machinery Fittings Factory
- The company in Changsha Hongdun business online can not find, provided by his address: two Changsha section of Xingsha Economic Development Zone Yuan Ming Road, I checked 114 specially call 12580 to booking the hotel near the road, not the road. Definitely a liar.
- Q: What is the use of spare parts prices in Chinese market by foreign companies?
- You might be gathering information for him. You have no data for one person, if there are several people? They can analyze a lot of things through big data. You can't find out, you're OK. Once you find out, your whole life is over.
- Q: How are the machine parts stacked?
- Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
- Q: What kind of electrical equipment do you have? What are the main components of each device?
- 1 、 electrical equipment part of electrical equipment mainly refers to: substation and distribution of power equipment and local scattered power, lighting distribution box. Such as: dry type power transformer, high voltage and low voltage power distribution cabinet, control the use of DC cabinet (with battery), standby uninterruptible power supply cabinet, lighting distribution box, power distribution box (cabinet), power factor capacitor compensation cabinet and standby diesel generator etc.. The utility model is characterized in that the rated voltage is mostly 10KV380V/220V by the combination of independent functional electric components, and the voltage is only 24V or 12V in the control system only.
- Q: What type of industry does the machinery and building accessories processing belong to?
- Every industry has average tax rate, the contribution of each this argument does not exist, the industrial enterprise is nade VAT. The more value-added products you pay more.
- Q: Where are the mechanical pressurization air supply facilities set up?
- The purpose of setting up a mechanical pressurization air supply smoke prevention system is to provide evacuation routes and shelters without smoke interference in the event of a fire in the building. Therefore, in the closed door, pressing position, and the fire floor must maintain a certain pressure difference, the position of the air pressure value is a relative positive pressure); at the same time, in the open part of the pressure when the door can have enough air velocity in the opening section, to effectively prevent the intrusion of flue gas, the safety of personnel ensure evacuation and refuge.
- Q: Construction machinery production need to deal with what documents?
- At all levels of production safety responsibility system, mainly refers to: the legal representative of the safe production responsibility system; the responsible person in charge of safety production safety responsibility system; the technical director (Chief Engineer) production safety responsibility system; the safety department (Department) Changan production responsibility system; responsibility for production safety, the project manager; specifically (and) post safety responsibility system for production safety; construction technician (technician), safety production responsibility system; 8 class (Group) Changan production responsibility system; workers, production safety responsibility system. Departments responsible for production safety system, mainly in accordance with the functions of enterprises set up departments, the corresponding formulation of the responsibility system for safety in production.
- Q: What are the construction materials, components, fittings and equipment in construction?
- 3. Equipment: a complete device which belongs to the unique function of each function of the construction project. There are systems, equipment and conventional equipment, such as: elevator, automatic fare collection, HVAC, gas fire protection, etc..
- Q: What functions should be achieved in mechanical structure design?
- The design of mechanical structure is based on the overall design, according to the principle of the program to determine and draw a specific structure, in order to reflect the required functions. Is the working principle of the abstract concrete into some parts, the specific content in determining the structure of the material, shape, size, tolerance, heat treatment and surface conditions at the same time, we must consider the process, strength, stiffness, accuracy, and other parts of the relationship between each other and other issues. So, the direct product structure design is the technical drawings, but the design work is not a simple mechanical drawing, drawing only express design language, specific integrated technology is the basic content of structural design.
Send your message to us
Tower Crane TC6024 Construction Equipment Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords