• Tower Crane TC6014 Construction Machiney and Equipment System 1
  • Tower Crane TC6014 Construction Machiney and Equipment System 2
  • Tower Crane TC6014 Construction Machiney and Equipment System 3
  • Tower Crane TC6014 Construction Machiney and Equipment System 4
Tower Crane TC6014 Construction Machiney and Equipment

Tower Crane TC6014 Construction Machiney and Equipment

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
15 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Introduction:

Tower crane is used to lift, lower and horizontally move materials in construction and other industry. It has large lifting capacity and lifting height, wide moving range, and can rotate. It basically consists of base foundation, mast, slewing unit, working jib, counter jib, counterweight, hook, and operating cabin.


Features:

1. It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
2. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
3. The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
4. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.


The advantages of our company's products

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
9. Engineers available to service machinery overseas.
10. For warranty, it is 12 months from the B/L date.What's more, some free easy worn spare parts are provided together with the crane.


Specifications:

Tower Crane TC6014 Construction Machiney and Equipment

Tower Crane TC6014 Construction Machiney and Equipment


Tower Crane TC6014 Construction Machiney and Equipment

Q:Tower crane four limit, two insurance, two insurance what is that?
Refers to the air switch and the electric leakage protector in the electric tray.
Q:They seem to be the tallest thing around, so what put them up?
Large cranes are built in sections imagine like an erector set. When there is a large building to be built the crane arrives in smaller easier to manage pieces and assembled on site.
Q:Can anyone give me a very accurate slow step-by-step video of how to make the prison break crane perfectly?Its hard to follow the directions on a diagram online so I need a good video.
you okorder and there ou can search prison break crane!!!
Q:Are tower cranes the same as tower cranes?
Tomato, you tomato, potatoes, you potatoTalent exchange of tower crane and tower crane
Q:or is jason mraz just making up things for lyrics?
No. They are lifted into place in sections by one or more other cranes, the telescopic arm kind, which are either in a nearby street or on the building site. I watched several being built and then dismantled over a period of three years at a large development across the street from my house. However, I saw a TV programme about how they built one on top of a mountain, and there they used helicopters to lower the sections into place.
Q:what does the expression, fate is a ninny woman, mean. from open boat by stephen crane?
Well, it means Crane was sexist, for one thing. :o) I think it means that he thought that fate could be fickle, capricious, and not appear to be very smart compared to how we would like things to turn out.
Q:How does a person go about becoming a Gantry Crane Operator? And what is it like?
First you need an opportunity to operate a Gantry Crane, then you will to to get a crane operator license. Finally, you need to find a company who needs a Gantry Crane operator, but if you have located the first step, then you have found someone.
Q:I was half way through this book and had to stop reading it because school got in the way. I'm back to reading it and I got to the part where Katniss made a noose and tied it around a dummy and showed it to the Gamemakers. And she wrote 'Seneca Crane'. I don't remember who that was. If it was even a person, I guess it was. But can you just explain who or what 'Seneca Crane' is and why Katniss would do that? Thanks.
He was the previous head gamemaker, and President Snow basically declared that he had Seneca Crane executed. Crane allowed Peeta and Katniss to live and cut off the final moment of the berries, which to Snow was an act of defiance. I think Katniss hanging the doll was just a symbolic act, implying that the gamemakers are really all just puppets under the Capitol.
Q:Before the Advent of the Railroad Steam Recovery Crane Car (pictures below), how were Locomotive Steam Engines recovered after a derailment from the 1830's to the 1890's?
Block and tackle. Some disassembling required. Consider this Stonewall Jackson raided Grafton WV and took several locomotives over land to a southern rail head. The special equipment was developed due to increased engine size. When steam cranes were/are used temporary tracks are laid at the wreck site for several reasons. one of which is to get equipment in and the other is to haul the wreckage out. The actual number of cranes required depended on the engine/s in the wreck, location on the wreck, skill of the operators and extent of damage. If the locomotive was damaged to much, it might be cut up. If the location was too difficult for recover, they were abandoned or buried. Rumor has it that there are several locomotives left at the bottom of slides awaiting for some one with enough money to recover them for restoration. Like the story of legend concerning a 1953 Corvette in a old barn. Hope that answers all your questions.
Q:Is the pink paper crane used to represent Lulu?
i really dont know what i can say to that so ill just shut up

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords