Tower Crane TC6014 Construction Building Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC6014 Description:
1.CMAX Tower Crane TC6014 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC6014 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC6014has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC6014 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC6014 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC6014 Parameter:
Max. working range 60m, tip lifting weight 1.4T and Max. lifting weight 8T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 46
Max height with attachment (m) 138
Working range can be adjusted (m) 48、54、60
Min working range (m) 2.5
Max lifting capacity (t) 8
Tip load @ 50m (t) 1.4
Tower Crane TC6014 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC6014 Diagram:
Tower Crane TC6014 Technical Sheet:
Tower Crane TC6014 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC6014 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “14” means the tip load is :1.4 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: ok, how do you make a paper crane. i've totally tried with a direction and marked paper, but that didn't work out. by the time i gave up the paper was all smooth cuz it was so worn. anything would help, links, step-by-step instructions, both. whatever. 10 pts to whoever tells me, and i succeed. sweet
- not a joke lol.
- Q: a crane lifts load of 500kg mass to a distance f 20m in 10s at a constant velocity. how much work is done?
- work done(W) is given by the change in the potential energy(P.E). here, initial P.E = 0. final P.E = mgh = (500)(10)(20) = 100000 J =100 KJ (kilo joules) therefore work done = 100 KJ. here distance means vertical height.But if the crane takes the load parallel to the ground ,then work done will be zero.Time is given here to calculate the power of the crane given by work/time = 10 KW(kilo watts).
- Q: Are there any special requirements for the installation of wall fittings of tower cranes?
- The angle of the two member of the wall shall not be less than 60 degrees and shall not exceed 90 degrees;
- Q: Plus why the symbiot instead of bringing the dark side of the carrier brought the gay and jerk side?
- 1) Something happened to the crane - it doesn't matter what - it was an excuse to bring out spiderman, What happened isn't important. It was a kind of malfunction anyway - NOTHING to do with any villians 2) Gay and jerk side? He wan't being gay, but because he was a jerk in the first place that is why he didn't really know how to dress up properly and being up himself means he doesn't recognise it - which by the way, was well scripted into the movie. It was a bit of a comic relief. The symbiot brought out the darker side of him but that doesn't mean it KNOWs to make him behave appropriately.
- Q: How big is the contactor lifting? How big is the car and how big is the turn?
- This is not very good answer, the United States originally used Tianshui 213, and then used the Japanese MITSUBISHI, used Schneider, LG, star power, Eaton.
- Q: They like fly on peoples face, i dont know why they come up on the face and it creeps me out, i have no idea why it comes inside of the house in the first place?
- I killed a Crane Fly because I thought i was a type of mosquito. Now I feel rather bad about it. After looking seeing how Crane Fly's look online.
- Q: I have always wondered how they get cranes off the top of huge buildings when they finish building them.I have had many people tell me how they THINK the cranes are taken off. But I want to know for sure. Can anyone give me some evidence? A web site or something??When I say big building I mean like 100 storeys.I have been told things ranging from a helicopter takes them offToThey build tracks down the side of the building and drive it downAndThey pull it to pieces and take it down the elevator.These MAY be real but sound like wild guesses to me.So does anyone know the answer?
- Large okorder .
- Q: The fight sequence on the construction crane between 007 and villain Molakka was mezmorizing. But would the laws of gravity allow for it to happen in real life? I mean, acrobats perform similar stunts, but could the average super spy and villain?
- anything scripted in general is not realistic,
- Q: I need to know exactly how much weight they can lift also how much do they weight?how long is thier life-time?in what temprature they can work?does mosture do any harm to them?for installation , do they need foundation?the exact height and width?
- You need to be more specific. The lifting capacities for container cranes varies significantly, as does any other crane. Some of the variation is based purely on load (horsepower) availability; some is based on speed (rpm) for lift/drop portions of the cycle. Cranes like these operate year-round, at ports all over the world. Some ports have average ambient temperatures in the range of 45 C, with highs up to 60 C. Others can be as low an average as 10 C, with a low peak as much as -50 C. Moisture will, over the long haul, harm them - they're metal constructs, and thus are prone to oxidation. Using corrosion-resistant materials and/or coatings will certainly prolong their usable lifespan. The crane drives (electric motors and power electronics) are also susceptible to moisture and other contaminants. All true dockside cranes require some sort of permanent foundation; it's usually part of the pier construction itself. However, there are portable cranes that operate without one. There is also more than one crane manufacturer out there - all will have their trade secrets that will make each look a little different than the rest. It will generally also reflect in their operation parameters, and in their expected life cycle.
- Q: im 35 and in august i get my license back and i am going after my childhood dream of being a crane operator and was wondering how i need to go about achieving this?
- I agree. There are schools (USA) that teach this kind of thing. You attend, receive a diploma attesting to your success then you can approach prospective employers that hire people with these skills. I wish you the best. :)
Send your message to us
Tower Crane TC6014 Construction Building Machinery Distributor Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords