• Tower Crane TC5516 Construction Equipment  Sales Building Machinery Distributor System 1
  • Tower Crane TC5516 Construction Equipment  Sales Building Machinery Distributor System 2
  • Tower Crane TC5516 Construction Equipment  Sales Building Machinery Distributor System 3
  • Tower Crane TC5516 Construction Equipment  Sales Building Machinery Distributor System 4
  • Tower Crane TC5516 Construction Equipment  Sales Building Machinery Distributor System 5
  • Tower Crane TC5516 Construction Equipment  Sales Building Machinery Distributor System 6
Tower Crane TC5516 Construction Equipment  Sales Building Machinery Distributor

Tower Crane TC5516 Construction Equipment Sales Building Machinery Distributor

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC5516 Description:

1.CMAX Tower Crane TC5516  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5516  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5516 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5516  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5516  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5516  Parameter:

 Max. working range 55m, tip lifting weight 1.6T and Max. lifting weight 8T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 44

Max height with attachment (m) 150

Working range can be adjusted (m) 44、50、55

Min working range (m) 2.5

Max lifting capacity (t) 8

Tip load @ 50m (t) 1.6 


Tower Crane TC5516   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5516 Diagram:

Tower Crane TC5516 Construction Equipment  Sales Building Machinery Distributor

Tower Crane TC5516 Construction Equipment  Sales Building Machinery Distributor


Tower Crane TC5516 Technical Sheet:

Tower Crane TC5516 Construction Equipment  Sales Building Machinery Distributor

Tower Crane TC5516 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5516 for example, the first two letters “TC” means Tower Crane, “55”means jib length is 55 meter, and the last two letter “16” means the tip load is :1.6 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: What does tower crane 400tm mean?
Lifting torque of 400 tons. Meters, also known as 4000KN/m, refers to the QTZ400 tower crane, the general maximum lifting capacity of 25 tons, big arm 70 meters, the most front-end hanging 5.2 tons, independent height of about 70 meters. Normally we say QTZ40 tower crane is lifting torque of 40 tons. Meters, 400KN/m.
Q: ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
Q: I need to draw an injured crane (the bird) with an arrow in its wing, lying on the ground...preferably with a splayed wing.How do I draw this? Sketches would help.Thanks.
Shoot a crane with an arrow and take a picture. Life drawing and technology mesh well.
Q: You see cranes on the floor which rise about 50 metres, but sometimes, when building high sky scrapers, I see cranes on the 70th floor or the 80th floor. How do they put the the crane so high up there when it can only go up high around 60-70 metres?
The cranes are built in the elevator shafts and moved up as needed during work progress.
Q: Tower crane demolition safety technical disclosure, how to write?
Baidu search:Tower crane removing and lowering joint safety technical disclosure.
Q: Could anyone tell me how they erect a construction crane.Some how they just are suddenly THERE, as If by magic.It seems as though the Boom part of the crane must be kind of JACKED up into place.That is the only way I can see them getting those GIANT concrete blocks into the back end of the boom. It doesn't seem possible otherwise. The only other thing I can thing of is the bulk of the pieces are brought in by helicoper and attached.Everything kind of makes sence except the Giant concrete blocks used as a counter weight. ALSO, if the blocks are needed to act as counterweigth to the CRANE itself..why doesn't the Crane fall over when it picks stuff up???
How do they erect the construction cranes? Not very well according to the news of them toppling down of late. Seriously, the cranes are lifted upward one or two floors at a time as the building progresses upward - this is usually accomplished by pulling them up into place with heavy cables and powered winches.
Q: how do construction crews put up a crane?
They assemble it on a concrete foundation using a mobile crane. To grow taller, the top unit of the tower crane has a jacking mechanism that lets it raise itself up and insert another tower section.
Q: Can the attached arm of the tower crane be welded?
The calculation of the attachment of tower crane mainly includes three parts: attachment rod calculation, connection calculation of attached bearing and calculation of attached frame. (1) the attachment bar calculates the attachment bar and is calculated by the compression member of the pivot shaft hinged at both ends. 1) the internal forces of the attached rod and the internal force of the connecting rod are taken as required by the instruction; if the specification does not specify, or when the spacing between the two supports connected with the building is changed, the calculation shall be carried out.
Q: (Fujian) white crane
There is no Fujian White Crane in NY. There is one instructor in south west NJ who teaches White Crane and if you're willing to travel that far(near Philly), I'll give you his address. I did hear of someone in China Town in Manhattan but I have searched and search and found nothing. Fujian/Fukien White Crane is the ultimate. If you do find someone, let me know.
Q: Is stature of the crane a Japanese, Chinese, or Okinawan form?
Found in kata from all 3 sources okinawan japanese and chinese .GANAKAKU KATA in shotokan CHINTO in okinawan kata and in FUKIEN CRANE STYLE for chinese. GANAKAKU means crane on a rock.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords