• Tower Crane TC4808 Construction Equipment Sales Building Machinery Distributor System 1
  • Tower Crane TC4808 Construction Equipment Sales Building Machinery Distributor System 2
  • Tower Crane TC4808 Construction Equipment Sales Building Machinery Distributor System 3
  • Tower Crane TC4808 Construction Equipment Sales Building Machinery Distributor System 4
  • Tower Crane TC4808 Construction Equipment Sales Building Machinery Distributor System 5
  • Tower Crane TC4808 Construction Equipment Sales Building Machinery Distributor System 6
Tower Crane TC4808 Construction Equipment Sales Building Machinery Distributor

Tower Crane TC4808 Construction Equipment Sales Building Machinery Distributor

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC4808 Description:

1.CMAX Tower Crane TC4808  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC4808  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC4808 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC4808  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC4808  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC4808  Parameter:

 Max. working range 48m, tip lifting weight 0.8T and Max. lifting weight 4T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 31.5

Max height with attachment (m) 110

Working range can be adjusted (m) 38、43、48

Min working range (m) 2.25

Max lifting capacity (t) 4

Tip load @ 48m (t) 0.8


Tower Crane TC5013   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5013 Diagram:

Tower Crane TC4808 Construction Equipment Sales Building Machinery DistributorTower Crane TC4808 Construction Equipment Sales Building Machinery Distributor

Tower Crane TC4808 Technical Shee:

Tower Crane TC4808 Construction Equipment Sales Building Machinery Distributor

Tower Crane TC4808 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC4808  for example, the first two letters “TC” means Tower Crane, “48” means jib length is 48 meter, and the last two letter “08” means the tip load is :0.8 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: i saw a PS3 in a claw crane game at Six Flags Over Georgia i wonder how you can win it. It is possible to win it... somehow. I thought that the strategy was to lift the prize that is closest to the hole. I almost won a Kinect that way. So are there any other strategies??? Don't say buy 1 or there isnt a way to win because there is.
The crane machines work in such a way as to only make the claw strong enough to hold prizes after a certain amount of attempts so as to limit the amount of prizes taken.
Q: There is no CAD map attached to embedded parts of tower crane?
Where there are special drawings, we are using the embedded parts of tower crane attachment reinforced pre buried above 32mm (with hook) in concrete beam column, with the head of the thread and attached connection
Q: For those of you who know about the tradition where you make origami cranes and can make a wish, is it 999 cranes or 1,000 cranes? Cuz I just finished making 999, but I'm not sure if it's actually supposed to be a thousand instead.
It is susposed to be 1000 cranes. You string them in 10 sets of 10 cranes. [thats how I remember!]Can you send me your way of folding them? I can't find one that works right for me, they always turn out a little wrong. :[
Q: i need a list of materials and a step by step precedure
things neded
Q: Why does the correspondant keep repeating If i am going to be drowned? IF I am going to be drowned -- if I am going to be drowned -- if I am goi
I like Persipho's answer. But I have to disagree on one point. Nature is not hostile. It's indifferent. If you try to swim the English Channel and are able to go 21.5 miles instead of 22 miles you will drown. Nature doesn't care if you go all that distance just to drown, This is the irony. It doesn't matter if you go 10, 15 or 21.5 miles. If you get a cramp you will probably drown. Nature doesn't care. That's what the correspondant means. In the story a bird watches them and is completely indifferent. The indifference of nature is part of the School of Naturalism that Stephen Crane, Jack London and others belonged to.
Q: Thanks to anyone who helps ^^
crane - tsuru flower - hana, kusabana, seika butterfly - cho, kocho cherry blossom - sakura sword - katana
Q: When you're training to work in construction, do you need to do a seperate course or qualification in order to be able to operate a crane? Or are all construction workers taught it in training?
Of course you need specialised training! Crane operators have to sit several courses in safe crane operations. Crane operators tend to just work cranes and not help with general building work as they earn more money and it is only cost effective to have them on site when they are actually needing to use the crane.
Q: Im looking for more information on Overhead Cranes!?
You would get lot of information on Over Head Cranes as permanently installed material handling equipment for various industries, if you google search under EOT CRANES. As I know, in steel industries their capacities can go up to 400 Tons. EOT cranes are electrically powered and electrically controlled systems. These cranes are categorized for maintenance application and production application. At times their design and construction are quite complicated specially those of production application such as Steel melting shop of steel plant.
Q: Formulas for calculating outrigger pad sizes, centre of gravity of loads, outrigger loadings
If you are going to be operating a crane, you need to do this on your own. People's lives will depend on you having a good knowledge in this area. .
Q: I know that an ancient Japanese legend promises that anyone who folds a thousand origami cranes will be granted a wish by a crane, such as long life or recovery from illness or injury. This summation, or something like it comes up in every search I do for the legend. Is there a full story that goes with the original legend? If so I would very much like to read it. Wikipedia doesn't have it. Also, while Sadako's story is very touching, it is not the one I'm looking for.
We just finished learning about this in school. It goes back really far, but this is what i know of. A long time ago when heroshima, the atom bomb hit, there were only few survivors. one little girl, i dont remeber her name, was told she was going to die. he heard an old legend that if someone were to fold 1000 paper cranes in one year, they would recive a wish that would come true. The littl girl started folding paper cranes so she could wish that she would live and everyone would have world peace. She sadly died before she was able to fold all 1000 cranes, but ever since a paper crane was a symbol of peace. She has a statue in japan and every year they recive thousands of paper cranes made from children around the world that they hang on her statue.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords