• TOWER CRANE QTZ160 new type of large tower crane for construction System 1
  • TOWER CRANE QTZ160 new type of large tower crane for construction System 2
  • TOWER CRANE QTZ160 new type of large tower crane for construction System 3
  • TOWER CRANE QTZ160 new type of large tower crane for construction System 4
  • TOWER CRANE QTZ160 new type of large tower crane for construction System 5
TOWER CRANE QTZ160 new type of large tower crane for construction

TOWER CRANE QTZ160 new type of large tower crane for construction

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TOWER CRANE QTZ160 new type of large tower crane for construction

 

1. Brief Introduction
QTZ160 Tower Crane is a new type of large tower crane for construction developed through adopting technology by Shandong Huaxia Group in 2000. During designing, general operations like limited meta count of steel structure parts, parameter optimization of entire crane, stability check of entire crane and choice of each mechanism, etc. are completed with computerized tower crane design platform, which has reached international leading level.
Max. hoisting moment of QTZ160 (6516) Tower Crane is 1940kn/m, and each index of performance occupies leading position among domestic products of the same grade. Its advantages are as follows:

 

  1. Hoisting arm can reach 65m, which largely increases covering area, and its working scope can satisfy constructions of more than two buildings simultaneously.

  2. It has many working modes with largest application range.

Groundwork is poured on the ground without under frame, and tower crane is fixed directly on the groundwork. This method makes tower crane spare groundwork section and crossing girder, and separate working height of tower crane is 46.2m under such condition.
If construction object is high, tower crane can adopt attaching mode, and hoisting height can reach 161-200m. If it is required to be higher under special conditions, please contact our company.
No matter which kind of mode is adopted, hoisting arm has lengths of 55m, 60m and 65m, which can be chosen according to different objects.

 

  1. It adopts hydraulic hoisting system to increase or reduce standard sections, which makes height of tower crane rise or fall according to height of construction to adapt construction of different buildings.

  2. Working speed is high, timing performance is good, and working efficiency is high.

Hoisting mechanism adopts double speed double pulley winding motor to realize low speed on heavy load and high speed on light load, and max. speed can reach 100m/minute. Start and brake are steady, impact is small, and operation is convenient. Swing mechanism adopts domestically advanced frequency conversion timing project, which makes start and brake become steady and reliable.

 

  1. Horizontal Arm Frame and Trolley Radius

The tower crane adopts horizontal arm frame, load is hung in hoisting trolley, and radius is realized through horizontal movement of trolley on arm frame. Compared with luffing jib tower crane, working is steady, installation is convenient, and radius application is wide, which can make hoisting performance be fully exerted, enlarge storing range of construction materials, and make disposal of general construction ichnography be convenient.

 

  1. Safety devices are complete, and there are brakes fixed in each mechanism, which can ensure working safety. There are safety protecting devices like hoisting height restrictor, trolley radius restrictor, moment restrictor, hoisting weight restrictor and swing restrictor, etc. fixed in tower crane.

  2. Driving room is set separately on side with good field of vision and large working space, which create better working environment for operator.

  3. Operation is convenient, and maintaining is simple.

Electric control system adopts domestically advanced PLC control with automatic malfunction judgment, overload and over moment safety chain protection, motor overtime protection, program controller of famous Japan Mitsubishi Company, transducer of Japan Yaskawa Company, relay of OMR Company and contactors manufactured through introducing technology of TE Company, which makes its reliability be much higher than general electric control systems. It is safe and reliable with less malfunctions.
There is no central collector to avoid disadvantages of short circuit and creepage because of damp and make entrance and exit of driver be easy.

2.Structure Figure

3.Form of Hoisting Performance of QTZ160 (6516) Tower Crane


Scope R
(m)

Hoisting Weight Q (kg)

Arm Length of 55m

Arm Length of 60m

Arm Length of 65m

A = 2

A = 4

A = 2

A = 4

A = 2

A = 4

5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
4 7 5 5
4 4 6 2
4 3 2 7
4 1 9 8
3 9 6 0
3 7 4 3
3 5 4 5
3 3 6 4
3 2 7 8
3 1 9 7
3 0 4 3
2 9 0 0

5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
4 9 2 4
4 5 8 6
4 2 8 7
4 0 1 8
3 8 9 4
3 7 7 6
3 5 5 8
3 3 6 0
3 1 7 8
3 0 1 2
2 9 3 4
2 8 5 9
2 7 1 8
2 5 8 8
2 4 6 6
2 3 5 4
2 3 0 0

5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
5 0 0 0
4 6 9 8
4 3 3 0
4 0 0 9
3 7 2 5
3 4 6 6
3 2 4 8
3 1 4 4
3 0 4 5
2 8 6 1
2 6 9 4
2 5 4 2
2 4 0 3
2 3 3 7
2 2 7 4 .
2 1 5 6
2 0 4 6
1 9 4 4
1 8 4 9
1 8 0 4
1 7 6 0
1 6 7 8
1 6 0 0

1 0 0 0 0
8 7 5 3
7 6 7 8
6 8 1 9
6 1 1 9
5 5 3 2
5 0 3 7
4613
4245
3924
3640
3381
3163
3059
2960
2776
2609
2457
2318
2252
2189
2071
1961
1859
1764
1719
1675
1593
1515

 

4. Main Technical Parameter


Working Level

Hoisting Mechanism

M5

Swing Mechanism

M5

Traction Mechanism

M4

Hoisting Height (m)

Ratio

Separate Fixed Type

Attached Type

a=2

46.2

161-200

a=4

46.2

100

Max. Hoisting Weight (t)

10

Scope

Max. Scope

65

Min. Scope

2.4

Hoisting Speed

Speed

Ratio

a=2

a=4

Hoisting Weight (t)

5

2.5

10

5

Speed (m/min)

50

100

25

50

Stable lowering-speed

Speed(m/min)

3

Motor Model

YZRSW280-4/8

Power (KW)

55

Rotate Speed (r/min)

1440/700

Swing Mechanism

Motor Model

YEJ132S-4B

Power (KW)

5.5×2

Swing Speed (r/min)

0-0.61

Rotate Speed (r/min)

1440

Form of Technical Performance

Traction
Mechanism

Motor Model

YZTDE180-4/8/24

Power (KW)

5/3.7/1.1

Speed (m/min)

58/29/9.5

Rotate Speed (r/min)

1440/690/210

Hoisting
Mechanism

Motor Model

Y132M-4

Power (KW)

7.5

Hoisting Speed (m/min)

0.4

Rotate Speed (r/min)

1440

Working Pressure (Mpa)

25

Crane Weight

Arm Length (m)

55

60

65

Balance Weight (t)

14.9

16.15

18.15

Total power (KW)

62

Working Environment Temperature (℃)

-20-40

5. Form of Main Metal Structure Components


Name

Figure

Main Material and Specification

Remark

Reinforced Section

Main Chord: Angle Iron 140×140×40 with seal board

Size: 1850×1850
Total Height: 2800

Standard Section

Main Chord: Angle Iron 140×140×40

Size: 1850×1850
Total Height: 2800

Hoisting Arm

Upper: Angle Iron 2<100×100×8
2<80×80×8

Space joist frame structure welded with V-iron and angle iron = 10 sections

Lower: Angle Iron 2<120×120×10
2<100×100×10
2<80×80×8

Balance Arm

Angle Iron
125×125×12
90×90×10

Space joist frame structure welded with V-iron and angle iron = 2 sections

Upper Rotating Platform

δ24 Steel Plate

Box Structure

Lower Rotating Platform

δ24 Steel Plate

Box Structure

Cover Frame

Angle Iron
125×125×12

Space joist structure for hoisting

 

Q: Would you say that Ichabod Crane is socially awkward??
Slightly, but he's a quirky character. As described in the story, Ichabod Crane is a school teacher who travels to Sleepy Hollow to teach the children of the area. This, in company with his ability to ingratiate himself, persuades many of the townspeople to successively lodge him at their homes for a week at a time, which serves as his sole means of lodging. He follows strict morals in the schoolroom, including the proverbial Spare the rod and spoil the child; outside the schoolroom, he is shown to have few morals and no motive but his own gratification. Despite being thin, he is capable of eating astonishingly large amounts of food and is constantly seeking to do so. In addition to this, he is excessively superstitious, often to the extent of believing every myth, legend, tall tale, etc. to be literally true. As a result, he is perpetually frightened by anything that reminds him of ghosts or demons. If you're talking about the movie Sleepy Hollow, then, Constable Ichabod Crane is a fictional character, played by Johnny Depp. He is a New York policeman with an interest in science, sent to Sleepy Hollow to investigate a string of grisly murders. As in the original story, his horse is named Gunpowder. Ichabod's most notable traits in the movie include an ahead-of-his-time liking for post-mortem examinations and scientific methods, as well as his being very quirky.
Q: i need the names of the organisms. like names of insects or fish or what ever they eat. give the organism's name. don't just say fish or insects. i need specific names.this is for a biology project.
Diet okorder /.. I'm sorry, I couldn't find any specific names, but here are some general ones. Sorry again.
Q: I'm a bit confused as to what happened to him. I guess I skimed a bit at a certain important part of the book. When Seneca Crane's name was written on the dummy during training, why did the people gasp at the name written in berry juice? What happened to him? PS. I am at the begining of Mockingjay. So no spoilers please. (:
Seneca Crane Hunger Games
Q: i probably sound like an idiot asking this question :Pis it electricity? fossil fuel burning involved? pulleys? how does the pulley work? any human power involved? specifically, how is it stupid to lift a chair that can be lifted by a person, with a crane?
A crane is a pulley and using simple machines like wedges, screws, pulleys etc. takes less work.
Q: Tower cranes should stop working when the wind speed is greater than the magnitude.
Rules for safety regulation of tower crane,The installation of tower crane is strictly prohibited at grade 4 or above
Q: inventor of junk yard electromagnetic crane?
British scientist William Sturgeon invented the electromagnet in 1824. The crane for lifting heavy loads was invented by the Ancient Greeks in the late 6th century BC. Who put the two together idk.
Q: Are the creators of the Karate Kid movies apologetic about the white crane defensive stance?
The movie was not a documentary, nor was it a how-to. As a result, the writers are given what's called poetic license to portray movements in any manner they wish, whether or not the techniques, philosophy, or theories behind them are accurate. I have never heard of anyone being apologetic about the movies or any of the techniques therein. But, I don't think they ought to be. The movies on both sides of the generation gap that separates them are equally entertaining.
Q: What other animals are there in an Eurasian Cranes habitat?
For example the Spreewald is representative of an ecosystem, the Eurasian Cranes live in. You find there also: Eurasian river otter (Lutra lutra), black stork (Ciconia nigra), white-tailed eagle (Haliaeetus albicilla), osprey (Pandion haliaetus), European fire-bellied toad (Bombina bombina) and several dragonfly species such as the beautiful demoiselle (Calopteryx virgo), banded demoiselle (Calopteryx splendens), several club-tailed dragonflies (Gomphus vulgatissimus, G. flavipes, Ophiogomphus cecilia) and a range of other invertebrates. www.bfn.de/0203_spreewald+M520875...
Q: Is the first entry into the construction project? Or direct access to fixed assets?
First in, in construction projects, and so on arrival booking use state, from the construction project into fixed assets. Increase in fixed assets, depreciation from the beginning of next month
Q: How to distinguish self lifting tower crane with counterweight and lifting tower crane without counterweight
2 the tower crane without counterweight is mainly the city fast loading tower crane. It is characterized by the absence of balance arm, and it is impossible to have counterweightThe layman can not tell the can see the appearance, there are long steel structure before and after the weight of the tower body, and no weight of the tower body with only one steel structure (i.e. jib crane, structure)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords