TOWER CRANE PT5510 featuring good lifting performance
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
The flat top tower crane is more and more popular among customers with its beautiful appearance and quick and safe disassembly, and its application range is also expanded constantly. The PT series product is the new product with domestically advanced level and capability of international market competition, and the main models include PT5510-6t, PT7023-12t and PT7528-18t. |
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | ||
Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | ||
PT5510 | 6 | 12.7 | 55 | 1 | 40 |
PT7023 | 12 | 18.1 | 70 | 2.3 | 50 |
PT7528 | 18 | 16.8 | 75 | 2.8 | 60 |
- Q: i am making a wired crane robot to pick and drop a wooden block of about 5*5*10cm dimension. I would like to know wat r the different possible lifting mechanisms by which i can lift the wooden block.Ideas other than the normal claw shaped lifters
- There are different attachments that you can put on the end of your crane to pick up this block. You can make a set of forks (like a forklift) that would slide under the block (block would have to be elevated on a skid). You can pick up this block with a suction cup. You can also pick up the block by clamping the sides of the block by replicating a scissor type mechanism.
- Q: Where you stand on one leg with your hands up and out to sides.Isn't standing on one leg in a fight leaving you exposed and vulnerable? What techniques can you actually do from that stance anyway (other than jumping up and kicking with the leg that was on the ground like the karate kid).
- Good question. Apart from the aspect of training, if you use it as a stance like in The Karate Kid in a real street fight or in a pub, it is comically useless. Movies are only movies and the moves are choreographed to captivate the audience's romanticism with Kungfu. But, having said this, the crane stance if used as a transitional move is a practical technique but both outstretched hands are either spear-hands or tiger-claws, not crane-beaks rising from the sides as in The Karate Kid. Or, if targeting only to the frontal opponent, both hands are forward, one fore and the other behind the front hand. The lifted leg is a frontal leg block either with the shin or knee. The knee must reach your solar plexus as a proper position. The whole centre-line is protected for an immediate instance, and is particularly used when there is a sneak attack from the front. But, don't ever use it as a stance waiting for an attack nor with any fanciful stances for that matter in real situations. To be effective with this technique, the person must be able to resist a frontal push while standing on one leg. To achieve this, he has to spend long hours on the 'horse-stance'. The common term for this single-legged stance is Golden Cockerel Standing On One leg, Jin Zi Du Li (my romanisation of Chinese is not to be trusted, but it sounds somewhat like that in Mandarin). As I said earlier, this is a transitional technique and really what follows after is the interesting part.
- Q: I have always wondered how they get cranes off the top of huge buildings when they finish building them.I have had many people tell me how they THINK the cranes are taken off. But I want to know for sure. Can anyone give me some evidence? A web site or something??When I say big building I mean like 100 storeys.I have been told things ranging from a helicopter takes them offToThey build tracks down the side of the building and drive it downAndThey pull it to pieces and take it down the elevator.These MAY be real but sound like wild guesses to me.So does anyone know the answer?
- Large okorder .
- Q: if i make 1000 origami cranes what does that mean?doesnt it mean that you get a wish or something? cause i heard a story about it a long time ago but i dont remember. im pretty sure that if you make 1000 cranes you get one wish
- I don't get it. Who's going to grant you a wish? The magic crane genie? Buddha? Why not try praying to God who might be able to help you, without going to all of the work and giving yourself paper cuts.
- Q: Lifting tower crane tower more than 45 meters, the demolition cost and how to adjust the field Sinotrans transportation fees?
- Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
- Q: What is the standard weight of a tower crane for 1.6*1.6*3 and 1.6*1.6*5m? Kg?
- The standard weight of tower cranes for 1.6*1.6*3 and 1.6*1.6*5m is 500KG
- Q: I need to go to a tower crane school inside Las Vegas, where do i go? At least inside Nevada. Not Arizona or Utah or California.
- check with the International Union of Operating Engineers. I know that in the past, they provided the training, and past the general operators certification, there is a Crane certification, and possibly also a Tower Crane endorsement.
- Q: Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
- Lifting mechanism in tower crane: M5. Luffing mechanism: M4 is the working system
- Q: what does the expression, fate is a ninny woman, mean. from open boat by stephen crane?
- Well, it means Crane was sexist, for one thing. :o) I think it means that he thought that fate could be fickle, capricious, and not appear to be very smart compared to how we would like things to turn out.
- Q: When should a crane be load tested?
- if crane using regularly more then 8 hrs test should be every 4 months 8 months and full sevice at 12 months............ Load Testing Services ACECO provides inhouse vertical load testing services for load bearing equipment. Examples of equipment that can be load tested: ? Below the hook lifting devices ? Hoists ? Hooks ? Testing can be performed to meet ASME B30.20, B30.10, and B30.16 as well as ANSI N14.6. ? Standard inhouse 50 ton load testing capacity. ? Ability to test higher load capacity devices (Up to 5,000,000 pounds). ? Have tested up to 640,000 pounds (320 tons). ? Engineering manufacturing available to provide lift fixtures for test purposes. ? Can provide nondestructive testing of critical welds and critical locations. ? Inhouse capability to make weld repairs using AWS D1.1 qualified procedures and welders. ? Calibrated test weights available. ? Testing can be performed in accordance with 10CFR50,Appendix B Quality Program. ? Certificates of Test and/or Test Reports can be provided. ? Can provide onsite load testing services, including supply of calibrated weights.
Send your message to us
TOWER CRANE PT5510 featuring good lifting performance
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords