Tower Crane Main Section TC5613 in China
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC5613(QTZ80)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Specification of Tower Crane
Technical Sheet for TC5613
Free standing height (m) | 46 | ||||
Max height with attachment (m) | 150(200) | ||||
Working range can be adjusted(m) | 44、50、56 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 8 | ||||
Tip load @ 56m(t) | 1.3 | ||||
Hoist mechanism | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZRWFc250M-4/8 30/30KW | ||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||
Motor | |||||
Slewing mechanism | Speed(r/min) | 0~0.6 | |||
Motor | YZR132M2-6-3.7KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 14.1 | ||||
Mast section size(L×W×H)m | 1.8×1.8×2.5 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 42 | ||||
Power supply requirement (KVA) | 190KVA for generator | ||||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 179A | ||||
Rated working voltage & current | 380V 128A |
Loading diagram:
56m jib length:
R | 2.5—13.7 | 14 | 20 | 24.9 | 26 | 32 | 35 | 38 | 44 | 50 | 56 |
a=2 | 4t—24.9m | 3.80 | 2.94 | 2.63 | 2.36 | 1.94 | 1.63 | 1.38 | |||
a=4 | 8t—13.7m | 7.79 | 4.12 | 3.92 | 3.72 | 2.86 | 2.55 | 2.28 | 1.86 | 1.55 | 1.30 |
50m jib length:
R | 2.5—15.1 | 16 | 22 | 26 | 27.6 | 32 | 35 | 38 | 42 | 50 |
a=2 | 4t---27.6m | 3.34 | 2.99 | 2.70 | 2.37 | 1.88 | ||||
a=4 | 8t-15.1m | 7.48 | 5.15 | 4.22 | 3.92 | 3.26 | 2.91 | 2.62 | 2.29 | 1.80 |
44m jib length:
R | 2.5—16.3 | 20.9 | 26 | 29.8 | 32 | 35 | 38 | 40 | 42 | 44 |
a=2 | 4t---29.8m | 3.69 | 3.31 | 2.99 | 2.79 | 2.63 | 2.48 | |||
a=4 | 8t---16.3m | 6.0 | 4.64 | 3.93 | 3.61 | 3.23 | 2.91 | 2.72 | 2.55 | 2.40 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: Formulas for calculating outrigger pad sizes, centre of gravity of loads, outrigger loadings
- If you are going to be operating a crane, you need to do this on your own. People's lives will depend on you having a good knowledge in this area. .
- Q: In the end of chapter 16 of Catching Fire the 2nd book of the Hunger Games it says the name she wrote in the dummy, was Seneca Crane. Who is that?!,
- Seneca Crane was the man who ran the Hunger Games in the year that Katniss was in it. He was killed in the end because in the time HE ran the games, TWO people were allowed to win, and President Snow had him killed. It effected the Gamemakers when she wrote it on the dummy because they were shocked and reminded about punishments if they run the games wrong.
- Q: How many meters does the tower crane installation height require expert proof?
- The mounting height of the tower crane is determined by the manufacturer's manual,It has nothing to do with experts,After the tower crane is installed, it needs to go through the provincial construction quality and safety supervision station, and the designated testing institution will meet the technical requirements of the production plant, and the method can be used only after the use of the permit.
- Q: What is the most amount of weight lifted by any crane?
- Depends on the capacity of crane...there is no standard for it
- Q: This poor little guy has been out on my balcony where I smoke my cigarettes for two days now. One wing is badly mangled and he can't fly away, I thought to just let him work it out yesterday in hopes of him healing on his own somewhere, but today he was climbing on my leg as if asking for help and I feel horrible for him now...he's suffering, he hasn't gone far in at least 24 hours I feel I should feed him and give him water until he heals...what do crane flies even eat?? Any advise aside of killing him and putting him out of his misery would be great!!
- Well, it looks like they only have a lifespan of a 2 weeks at the most, so I'd just make him comfortable and let nature do its thing. According to Wikipedia, adult crane flies don't really eat--they just hang out and mate... If you really want, I suppose you could put some sugar water in a bottle cap or something for him.
- Q: For my science fair project we have to build someething using simple machines, me and my partner decided to do the crane, but we havent been able to find any place that shows intructions on how to build it. If you can please included a step by step plan, the things you will need ( whether or not they are hard to find/ and if so where i might be able to find them ), and your sourcetruely i appreciate this sooo much thankyou in advance everything counts so please make it as detailed as possible and if you know any other sites that show please include thank you sooo much :)
- you are totally just trying to avoid doing this work by yourself. anybody with two eyes can just look up crane on google and learn how it works. they are super simple just go to the library or something. or better yet go look at a real crane.
- Q: I can't find anything about this online, and I've never heard of it before.... I'm looking nearby for a Karate club to join, and came across this.I've heard of white crane kung fu, but not karate...
- Probably an Okinawan style of Karate with strong ties to Chinese White Crane Kung Fu.
- Q: What is the admissible weight of a crane?
- Depends on how it is transported - you have to give more information on the kind of crane and where it will be used.
- Q: Firstly, I realize that the 1000 paper crane thing is based on faith and not science. I'm not stupid. Secondly, Do the 1000 cranes have to be in the same place? If I send one of my cranes to a friend across the country, would that no longer count as part of my 1000 cranes?If a crane gets destroyed, must I start over or replace that crane?If anyone has any knowledge or link pertaining to the 1000 paper crane myth, please post it. Thank you.
- The myth seems to surround the FOLDING on the 1,000 cranes - it is the sacrifice on the part of the person doing the folding that is the magic not the cranes themselves. See the Wiki......
Send your message to us
Tower Crane Main Section TC5613 in China
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords