Tower Crane Building Machines with ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detail of Tower Crane
Feature: Tower Crane Condition: New Application:Building,Construction,Industrial
Rated Loading Capacity: 1.6-8T Rated Lifting Moment:100KN.M Max. Lifting Load: 8T
Max. Lifting Height: 200M Span: 2.5-55M Place of Origin: China (Mainland)
Brand Name: CMAX Model Number: TC5516(QTZ100) Certification: ISO,CE
Warranty: 1 Year Free standing height (M):44 Max. Working Range(M): 55
Tip Lifting Weight(T): 1.6 Working Range(M): 45,50,55 Climbing speed(M/MIN): 0.5
Counterweight(T): 17.6 Working Temperature(°C): -40-+60 Type: Topkit Tower Crane
Delivery Date:25-30 days Mast Section Size(L*W*H)MM:1600*1600*3000
Main Features of Tower Crane
1. TC5516(QTZ100) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 55m, TC5516(QTZ100) tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3. It is original in design, reliable in operation and satisfactory in shape.
4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.
5. Provide stepless speed regulation. Oustanding in working efficiency, operating stability and reliability.
6. Reduce future maintenance cost.
7. With scientific layout and beautiful appearance.
8.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys.
9.After sales service will be offered which will get rid of all your worries in the purchase of our products
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What kinds of tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane , top less tower crane and luffing tower crane.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: What is the function of the balance valve in the hydraulic jacking system of tower crane?
- The function of the balance valve is to maintain the balance of the oil pressure, the hydraulic oil delivery flow is stable, so that the tower crane jacket and the upper part of the lift, disassembly, standard time, lift and smooth.
- Q: What are the special operators of tower cranes?
- The tower has special operations personnel of heavy machinery refers to the construction site in the tower crane division signal cable, installation and disassembly, the driver, and the demolition work of gondola installation, may cause serious harm to themselves, others and the surrounding facilities operations personnel.
- Q: who invented cranes?
- Lost in the mists of time. We know that the Babylonians and Egyptians used simple cranes a few thousand years BC.
- Q: Can someone tell me the difference betweem safe working load and capacity of a crane?If possible, please provide reference along with tour answer.thanks for the help!!!
- Swl Crane
- Q: how long do i have to work as a yardhand in oilfeild to become a crane operator?
- You need to get licensed or certified to operate the crane. make sure you are qualified before you start complaining about not getting more challenging work. The world needs ditch diggers to so get back to work.
- Q: My friend from the internet has an injured crane in her backyard, does anyone know how to keep it calm so she can bring it to the humane society? She says she's called very animal rescue place she knows and none can help so now she's just sitting with it because kids keep throwing sticks at it.
- First of all, tell your friend to beat those idiot kids. Second of all, tell her to give it water and food. Tell her to keep calling places because that is nonsense animal rescue are denying to help.
- Q: Any difference?
- The crane part can be identical, but the vehicle part differs: in the former case it's a road-going (even multi-axle) truck, in the latter case it's an off-road vehicle with oversize all-terrain tires and appropriate traction and transmission capabilities. In either case, the vehicle must be stabilized on adjustable hydraulic struts before hoisting.
- Q: I looking for information on the surname Crane.?
- According okorder /
- Q: I used to buy a new tower crane that was attached to someone else's unit and (the key Gou Er). Now I have set up a company myself and bought a key, Gou Er. The question is, now how can I put it back from someone else's key dog and bring it back to my own dog?Know about the urgent urgent urgent urgent call to inform the mobile phone can ah ~ ~ ~ ~ ~ ~ thank you!
- Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
- Q: Trying to find an estimated weight for a mobiles crane with a 5 tonne capacity ?
- It is not the weight of the crane alone that matters. But to some extend if the crane is light, this could create a torque when carrying a heavy load and the crane could collapse. Therefore I am speculating that inorder to lift 5Tonnes, the crane must be more than 5 tonnes to balance out the moments resulting in a torque The internal structure of bolts and trusses must be able to handle heavy loads and their are several calculations done to find each forces acting on the members of a truss. For eg: By using Pin Joint Analysis
Send your message to us
Tower Crane Building Machines with ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords