• Timber Beam Formwork for Cantilever Climbing Formwork System 1
  • Timber Beam Formwork for Cantilever Climbing Formwork System 2
Timber Beam Formwork for Cantilever Climbing Formwork

Timber Beam Formwork for Cantilever Climbing Formwork

Ref Price:
$60.00 / m get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
200 m
Supply Capability:
80000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Cantilever Climbing Formwork Description

Cantilever Formwork is  mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed.

 

2. Main Features of Cantilever Climbing Formwork

-Easy construction

-Economical and Rapid

-Perfect surface

3. Cantilever Climbing Formwork  Images

Timber Beam Formwork for Cantilever Climbing Formwork

 

Timber Beam Formwork for Cantilever Climbing Formwork

 

4. Cantilever Climbing Formwork Specifications

Main cantilever FormworkPJ200 & PJ240,CB-240 etc

The Structure Sketch PJ200

Timber Beam Formwork for Cantilever Climbing Formwork

 

Timber Beam Formwork for Cantilever Climbing Formwork

 

Anchor  system

Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring

Tensile bolt M30/L= 110

Anchor shoe

Bowl-climbing cone M30/D15

High-strength rod D15

Ancor plate D15

 

Timber Beam Formwork for Cantilever Climbing Formwork 

 

5. FAQ of Cantilever Climbing Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Cantilever Climbing Formwork and avoid extra expenses for customers.

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of Cantilever Climbing Formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.

 

Q: What is the use of building wall formwork support? Thank you
Multicard support beams with multi support beams in visa, visa in early removing system to save 32% than ordinary plywood sold cuplok supporting system construction.
Q: Technical specification for construction formwork safety JGJ162-2008 who has made me please
Template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation workload. To improve the reuse rate.The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.
Q: 1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
General principles for the implementation of 1.0.1 in the construction of formwork engineering in China to implement the principles and policies of safe production, to achieve advanced technology, economic and reasonable, easy to apply and to ensure safety in production, the development of this specification. 1.0.2 This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction. 1.0.3 template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation work to improve the reuse rate. The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.
Q: 86335 template support, what is the concept of those advantages
Product features:Features: keel tight flexible connection not only makes the operation simple and easy, and the structure is stable.Features two: retractable keel allows you to adapt to any size.Features three: the column and the keel of the clever self-locking connection is not only simple and stronger.Features four: tie rod light not only save material, and is more flexible and firm, flexible fastener is a mustFeatures five: compared to the wooden beam structure is more accurate, more secure.Features six: the construction site is beautiful and clean, greatly enhance the corporate image, highlighting the strength of enterprises.Features seven:: labor, material saving, time saving, more security.Features eight: do not use wood, energy saving and environmental protection, the product can be reused, so that the construction cost is greatly reduced.Improve efficiency: construction without any technology, will be, efficiency increased by 600%.Do not use: do not use a round nail, wire, wood, without any tools to reduce the cost of a large number of countries can save a lot of wood.High safety: complete steel structure, standard fasteners, tight structure, compact connection, safe and reliable.Beautiful and neat: construction site clean and orderly, easier to manage, improve the image of the project. High precision and stability.
Q: Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
Suggest that you chose to do it according to the roof beams, concrete inclined roof more difficult to operate, workers are not professional if vibration is not so dense, it is easy to Water Leakage.If you really want to use the concrete will have to change the roof to flat roof, since the construction of the team is easy to build, more secure.Cast in place concrete roof generally according to 12CM~15CM.
Q: What is the building template support
In the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket, built into the scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords