• Three Jaw Anchor Plate System 1
  • Three Jaw Anchor Plate System 2
  • Three Jaw Anchor Plate System 3
Three Jaw Anchor Plate

Three Jaw Anchor Plate

Ref Price:
$1.50 / pc get latest price
Loading Port:
XINGANG
Payment Terms:
TT
Min Order Qty:
2000 Unit/Units pc
Supply Capability:
5000 Unit/Units Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details of Three Jaw Anchor Plate:

Place of Origin:  China (Mainland) 

Model Number:  scaffolding parts 

Type:  Scaffolding Parts 

Scaffolding Part Type:  screw,nut,pin,plates 

Color:  Red Blue or AS Customized 

Thickness:  3-6mm 

Length of Screw:  195mm 

Application:  Scaffolding Props 

Pin:  straight with metal cap,line straight without metal cap,chain,G-style

cerificate:  ISO9001:2008 

Packaging & Delivery of Three Jaw Anchor Plate:

Packaging Detail: In Pallet or Carton or As Requirement

Delivery Detail: Within 25 Days after Receiving your Deposit

Specifications of Scaffolding Wing Nut for Constrution:

Surface Finish:Galvalized,Painted

Material:Q235

Usage:Scaffoldings Props

steel scaffolding Wing Nut:

1.Diamater of nut:60-75mm

2.Thickness of screw:15-30mm

3.Thickness of nut: 15-30mm

4. Length: 195mm

5.plate:Square,Flower,U head

6.nut:Cup pattern,common

7.pin:G pattern,7 pattern,common

About us:

A) We have much experience in designing and producing the Building steel pipe props .

B) Our pruducts are widely exported to more than 10 countries and regions and very popular among US , the Middle East, South America and Europe and so on.

C) our mission is "quality priority and customer first" .

Our products and services have received good evaluations from customers.

 

We are specializes in designing & manufacturing of various kinds of  formwork systems, including H20 timber-beam formwork, aluminum formwork, steel (aluminum)- frame formwork etc.

All the equipments & formwork systems produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

 Three Jaw Anchor Plate

 Three Jaw Anchor Plate

 Three Jaw Anchor Plate

Q:What is an integrated climbing frame? What are the works? What are the advantages
. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q:The difference between the scaffold and the scaffold
Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
Q:The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q:Advantages and disadvantages of climbing frame and floor type scaffold
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
Q:What are the maintenance and maintenance of hydraulic climbing formwork
Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
We are an enterprise which is engaged in mechanical designing, processing, mold manufacturing and casting. Its customers are based on foreign investors, state-owned enterprises and medium-sized private companies. Because of the advanced technology, our products are involved in petroleum, metallurgy, mining, and textile, medical and other industries. The company makes a rapid rise in the machining area under the conduct of business philosophy “quality first, customer first” and the management principle “strengthen the management, continuous improvement”.

1. Manufacturer Overview

Location Hebei, China
Year Established 1987
Annual Output Value Below US$1 Million
Main Markets China; United States; Britain; Japan; Germany; Israel
Company Certifications GB/T19001-2008/ISO9001:2008 Quality Certification

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Xingang
Export Percentage 1% - 10%
No.of Employees in Trade Department 10-20 people
Language Spoken: Chinese; English
b)Factory Information  
Factory Size: Above 3,000 square meters
No. of Production Lines Above 10
Contract Manufacturing Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords