TC7034 with CE ISO Certificate Tower Crane Price for Sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our tower crane:
1, TC7034 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 70m, TC7034 tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3, It is original in design, reliable in operation and satisfactory in shape.
4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.
5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products
Advantage of our tower crane:
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Features of our tower crane:
Independent height (m) | 50 | ||||||
Max height with attachment (m) | 200 | ||||||
Working range can be adjusted(m) | 40/45/50/55/60/65/70 | ||||||
Min working range(m) | 2.5 | ||||||
Max lifting capacity(t) | 12 | ||||||
Tip load @ 48m(t) | 3.4 | ||||||
Hoist mechanism | Falls | 2 | 4 | ||||
Lifting capacity(t) | 0-3 | - | 0-6 | 0-6 | - | 0-12 | |
Speed(m/min) | 0-80 | - | 0-40 | 0-40 | - | 0-20 | |
Motor | YZPBF250-4-55W | ||||||
Trolleying mechanism | Speed(m/min) | 0-56 | |||||
Motor | YZPBE132M-4-7.5KW | ||||||
Slewing mechanism | Speed(r/min) | 0-0.6 | |||||
Motor | YLEW112M-6-120.N.M X2 | ||||||
Climbing speed(m/min) | 0.5 | ||||||
Counterweight(t) | 26 | ||||||
Mast section size(L×W×H)m | 2.0×2.0×3.0m | ||||||
Working temperature | -40-+60°C | ||||||
Total power (KW) | 95 | ||||||
Power supply requirement (KVA) | 190KVA for generator | ||||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | ||||||
Startup voltage & current | 380V×95%=361V 219A | ||||||
Rated working voltage & current | 380V 146A
|
FAQ;
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q: what is the common cause of crane accidents
- Although mechanical failure does occur, most crane accidents are caused due to human error. Here are some examples: 1) Operating a crane during adverse weather conditions, such as wind conditions 2) Overloading a crane/ improper load calculations 3) Inexperienced or untrained personnel 4) Improper rigging of the load 5) Bypassing safety devises 6) Improper selection of the crane for the environment (ground conditions, power lines etc.) based on the type of load 7) Shock-loading a crane 8) Failure to perform maintenance and inspections in accordance to manufacture specifications I hoped this helped Cheers
- Q: What makes a crane so strong?
- Cranes are built using a structural technique called a truss which is characterized by looking like a series of triangles connected together. That structure prevents the members from having to resist any bending loads. All of the truss members experience only tension and compression, no bending. That is an extremely efficient structure which is why they can be so strong without being monstrously heavy. Or if you prefer the short answer, engineers make the crane so strong.
- Q: please tell me thats not what i think it is O_O
- Omg! What primer is it? That sounds really fishy...
- Q: Okay, like a week ago I caught a daddy long legs (a crane fly) in my room with a mug and an envelope and I just left it there, when I removed it there were loads of little black dots on the envelope, I didn't really think about it cos I figured it was the coffee that was inside the mug or something. I got rid of most of them but didn't go out of the way if you know what I mean... And now there are loads of TINY little flies in my room. Could these be baby crane flies? Or something else? And if so how the hell do I get rid of them before they get huge and start reproducing all over again?!
- go to target and get a bug zapper its 2300 volts so when they hit the wires they are dead or spray poison in your room.
- Q: Plus why the symbiot instead of bringing the dark side of the carrier brought the gay and jerk side?
- what is with the gay?? Do you have an obsession with men or something?? Are you sure your not the one who is gay? Since when is sensitivity a sign of being gay?? who taught you that? You should really have a talk with yourself about your sexuallity.
- Q: What measures should be taken to make tower cranes stable?
- Increase deadweight and weight.Crane wire rope is phosphate coated steel wire, galvanized steel wire, stainless steel wire rope or coated steel wire rope, the use of atmospheric environment, patented technology to produce manganese phosphating coating of steel wire rope has the longest lifespan, heavy corrosion environment optimization of hot galvanized wire rope - double coating phosphating, phosphating coating to improve the wear resistance and corrosion resistance of steel wire that is not easy to wear and corrosion resistance is to improve the working life of the plain steel wire rope will be completely eliminated.
- Q: The fight sequence on the construction crane between 007 and villain Molakka was mezmorizing. But would the laws of gravity allow for it to happen in real life? I mean, acrobats perform similar stunts, but could the average super spy and villain?
- no. no fight scene in any movie is realistic.
- Q: my overhead crane refuse to work transvesely
- Limit switch replacement requires adjustment of the cranes travel limits. The limits are imposed by the manufacturer for the application. This service is normally factory authorized only.
- Q: Whats does the japanese crane symbolize?
- The Japanese crane symbolizes serenity and hope. It is a legend in Japan that if you fold 1000 paper cranes, any wish will come true. There is a story about a girl named Sadako who died from radiation in Hiroshima after WWII who tried to fold 1000 paper cranes to be brought back to health. She nearly folded 1000, and died before then. People come to Hiroshima still today with 1000 folded paper cranes to honor Sadako.
- Q: Do they need another crane to get the concerete blocks to the top? And how do they move the blocks from one end of the crane to another. This has been bothering me for some time so anyone who knows the answer I would love to hear it!
- Construction cranes are erected on site. They are usually assembled on the ground with small cranes, then lift themselves up. The erection sequence is carefully figured, so minimal other equipment is needed. For conventional cranes that are permanent and thus only assembled once, portable cranes are used to erect them. Still, generally pretty much on the ground. Some have counterbalances that are permanently fixed, others have a rail type mechanism that moves in and out.
Send your message to us
TC7034 with CE ISO Certificate Tower Crane Price for Sale
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords