• TC5510B tower crane System 1
TC5510B tower crane

TC5510B tower crane

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

·   Customer can tell Masan the detailed specifications and Masan can make the suitable products for customers.

·   Manufacturing Year: 2014

·    Jib Length: 55m

·   Free Height Under Hook: 40m

·  Max. Load: 6T

·  Tip load: 1T

·  Mast Section Dimension(m): 1.6x1.6x3 (L44)

·   Hoisting Speed(m/min) & power: 8.5/40/80 24Kw

·   Slewing Speed (r/min) & power: 0~0.8 5.5Kw frequency

·  Trolleying Speed (m/min) & power: 43.7/21.7 3.3/2.2kw

·   Cable specification: 3x162 +2x102

·   Power Supply: 400V(+6% -10%)50HZ

Q: The crane will only be needed once. Is it possible to hire them?How much in general would a company charge to bring one in?
of course you can hire a crane for the day, First contact a local crane hire company, they will probably visit your site to see what size crane you need, This will not come cheap, the driver has to be paid for the day and the crane costs have to be included,
Q: I am writing a short paper on the significance of the white doves and the crane in the book Sadako and I'm really not sure what to say.
Anyone who folded a thousand paper cranes would be granted a wish. Sadako wished to healthy again so that she could run and play like before, and she pursued her goal with such determination that, although she died of her disease, she succeeded in transforming the paper crane into a symbol of peace for children all over the world.
Q: For example, self lifting tower crane mounted to 10 meters or 2 floor use. How do you install the third floor now? Is it necessary to remove the crane?. Then add the length of the steel frame on the base seat, and then install the crane above him If so, then 2 cranes are needed. But how is another crane installed?Ask you experts on the construction site of self lifting tower cranes how to install?. Do you use hydraulic jacks like car jacks?
It is required from the upper plus height, then the crane through the motor (hydraulic is not I don't know if not carefully studied to estimate almost) slowly up, because the installation of crane is a separate Union, only the crane is fixed on the top, and is connected to the lower die width ratio some long, above there are for the installation of people stay small table, but also it can open from the opening above the dead ground fill and then fix it by bolt, and then put the live up to OK
Q: Notice of tower crane
Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
Q: It`s like a big box filled with toys and u insert a coin and then u have 2 handle the small crane to pick up a toy...
a claw machine
Q: I saw a picture of a oragami crane ring that was made out of money on a website but it diddint have any instructions on how to make it. I can already make the regular ring, but i would really like to try to make the crane ring does anyone know of any website that has instructions on how to make it??
I web-searched and found a picture which cited a Yahoo group as a source of further information. The group does *not* have an open archive. If you're interested in other money-fold projects, you may wish to consider joining that group. I'm listing a link for the group below.
Q: Are Crane Flies Venomous?
Crane flies are non-venomous and non-biting .It is a common myth that the daddy long-legs would be the most poisonous animal if only it knew how to use its poison, but this is false. There are 300 species in Britain with the commonest being the entirely harmless, if annoying, Tipula Paludosa. They are completely harmless and only live for around three days as adults.
Q: What does "slewing up" and "under rotating" in the slewing form of a tower crane mean?
As for the reasons, the main consideration is the actual needs.
Q: I have to read this book for an AP class next year. I did read the book and i don't understand how i can discuss the setting and its possible relationship to the theme. I looked stuff up on the internet and I've asked other people who have read the book and they're just as confused as I am. I need help!
I can't tell you what to write or what you see as the theme but one of the themes in the book is man versus nature. Maybe you could discuss the setting as part of nature and what Crane seems to be saying about it. One thing that might help is a poem Crane wrote which explains how he sees things. Maybe you already know it. It's titled A man said to the universe A man said to the universe, Sir, I exist! However, replied the universe the fact has not created in me a sense of obligation. An indifferent universe. Not unlike how Thomas Hardy saw things.
Q: total motor kw-100kw,crane class-m6,the crane should be operated on ups as the conventional electric supply is off , back up time require-30 min.
To account for the inefficiencies, and startup currents, you should have a 200 kW (200 kVA) inverter with peak power of 800 kW. The batteries would have to store and deliver about 150 kW. But lead acid batteries would need to be of a higher capacity to guarantee that power level for 1/2 hour, which calculates to 75 kW-hour. I'd say 100 kW-hour capacity. A large 12 volt battery can store about 100 amp-hours which translates to 1 kW-hour, so you would need 100 of this size batteries connected in series/parallel. I made a lot of guesses, you should get better numbers for the motors, the inverters and batteries for a more accurate calculation. An inverter of the size needed will not be a 12 volt unit, but probably 48 or 96 volts DC. so you need to configure your batteries in series parallel to get that voltage. Altogether, the 100 large batteries make this not a practical solution. There are lots of large cranes in the world, what do they use for backup? And why do you need backup. With no power, the clutches would keep the crane and loads fixed in position, my guess.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords