• Straddle Power Stacker--CLT13AC series System 1
Straddle Power Stacker--CLT13AC series

Straddle Power Stacker--CLT13AC series

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


PRODUCT NAME:Straddle Power Stacker--CLT13AC series
PRODUCT INTRO

1.Compact structure, good looking       
2.Hydrappp pump station from Italy,more stable when lifting goods.The power unit joins DC machine,wheel pump, valve plate and pipeline together;small,reliable,stable,low noise,save energy and environmental-friendly 
3.Curtis controller system,nimble,easy to operate,reliable,regenerative braking、plug braking and stepless speed regulating functions   
4.Large capacity battery,long lasting power,easy to charge

1KG=2.2LB 1INCH=25.4MM

Identification1.2ModelUnitCLT1325ACCLT1330ACCLT1333AC
1.3Power:electric(battery),diesel,petrol,
natural gas
electric
1.4Manner of operation(hand,pedestran,seated,
standing sorting-picker)
standing
1.5Load CapacityQ(Kg)130013001300
1.6Load Centre distancec(mm)500500500
1.7WheelbaseY(mm)141914191419
Weight2.1Weightkg110012001300
Wheels 
Types
3.1Tyres(rubber, highelastomer,pneumatic,
polyurethane
PU wheel
3.2Front wheel size787878
3.3Rear wheel size124124124
3.4Drive wheel230230230
3.5Track width(front)drive sideb10(mm)390390390
3.6Track width(rear)load sideb11(mm)608608608
Dimensions4.1Closed mast heighth1(mm)179020402190
4.2Lift heighth3(mm)90~250090~300090~3300
4.3Overall lengthl1(mm)180018001800
4.4Overall widthb1Ib2(mm)850850850
4.5Length between fork backrest and vehicle
body
Slell(mm)115011501150
4.6Overall fork widthb5(mm)560560560
4.7Turning radiusWa(mm)169016901690
Performance5.1Speed Load/unloadKm/h5.3/6.05.3/6.05.3/6.0
5.2Lifting speed Load/unloadKm/h707070
5.3Lowering speed Load/unloadKm/h100100100
5.4Brakesmm111
Motor6.1Drive motorkW1.61.61.6
6.2Lifting motorkW222222
6.3Battery voltage,normal capacityV/Ah24/21024/21024/210
6.4Battery weightKg210210210
6.5Battery dimensionsmm650x200x540

Related Products
Q: What kinds of tables are there? Which is better for the office?
Hand. This is a waste of time and noise. 2: electric. Electric lift, mute. The downside is that you need to replace the whole table. 3: lifting platform. This is a table that is on the table, which is placed directly on the table and does not need to be installed.
Q: Tomb raider 9 research base elevator to go to go to go to go to the order to pry the gear not to go down to go down to go down the card 3 to break up
When I play this card for a long time, also I am getting rid of the four is only the past, the front three gear easy to find, the fourth in 3, 4 layer between the right of the lift, there is a hole, was blocked by a few boards, you can go out from there the fourth also make it
Q: The ball of the universal milling and lifting platform rolls off, how to install,
Remove the screw and remove the poles, bearings, and bearings. Find a root (casing pipe diameter and the bottom of the screw thread diameter size, casing Canon and screw axis diameter size), the sleeves on the screw axis, the screw nut screw on the casing; When fully rotating to the casing, remove the casing and the screw nut. Slide to one end of the casing and the screw nut expose about half a circle ball nut (must pay attention to, don't put the ball, or ball will all fall out), with tiny rod or wire, adjust the position of the ball, with one or more of the position of the ball, then fill in falling ball (this step is very important, it is better to have a ball screw pair assembly experience to do); Once you have finished, put the casing on the shaft of the screw. Then turn the nut onto the screw.
Q: How does the platform maintain
Inspect hydraulic oil and oil level. The hydraulic oil should be 40 to 50 mm above the tank when the platform rises to the highest. When the oil is dark, the oil is sticky, or the oil has grit and other foreign things, the hydraulic oil should be replaced in time. The hydraulic system of lift platform applies 32 # hydraulic oil. A. check the hydraulic and pipe joints. The pipe is damaged and should be replaced immediately. Tighten the joint when the connection is loose.
Q: How do I design this hydraulic lift?
We recommend jinan tianfeng hydraulic efficiency, professional production of hydraulic lift and lift platform, which can be custom-designed according to customers' needs. The product is of good quality and reasonable price. Good after-sales service is guaranteed!
Q: There are several categories of mobile elevators
Knowledge of mobile elevators is almost there. Mobile hoist considering the mobile convenience more considering the high stability, wide operating platform and high bearing capacity, can make the work high above the range larger, more wide, many people work at the same time. Improving the efficiency of the work is a safe place for people.
Q: How does the elevator repair
For elevator maintenance the simplest way is to find the manufacturer directly to repair, after all, is their production, repair is good, also save time, our factory is the jinan day machinery, bought two or three years, rarely out of order, maintenance in time, high efficiency, under the baidu search them, you ask yourself, see how.
Q: What happens when the platform comes up and the power goes out.
Many platforms have an emergency drop.I hope my answer will help you.
Q: What hydraulic cylinder is used
It is better to use hydraulic welding double acting cylinder.I hope my answer will help you.
Q: What is the difference between elevator and elevator platform and high-altitude platform
The elevator will use the motor to reverse the deceleration and pull the cable to lift the basket. The platform, like the high-altitude operating platform, USES hydraulic oil to pressurize or unload the platform. High altitude (pinyin: gao kong zuo ye) refers to the work performed at a certain location on a high level. National standard GB 3608-2008 "high job grading" regulation: "where in the fall for more than 2 m height datum (2 m) to operate the heights of the likely to fall, are called high homework." According to this rule, the scope of the construction industry is quite extensive. When working in a building, operate on a shelf above 2m.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords