Straddle Power Stacker--CLT10AC series
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
PRODUCT NAME:Straddle Power Stacker--CLT10AC series | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
PRODUCT INTRO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1.Compact structure, good looking 1KG=2.2LB 1INCH=25.4MM
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Related Products | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
- Q:Do you have a personal elevator with hydraulic platform
- In homes that jump a layer or double entry house how to select the elevator, first of all let us clear the elevator and the elevator is introduced here, live in has crush that jump a layer or double entry house of friends, if you want to know more, can
- Q:What is the use of a silk pole elevator?
- It can be used in single or combination, which can be controlled by a certain degree of accuracy, which can be driven directly by electric motive or other power. It can also be manually, with the maximum input speed of 1500r/min, the maximum speed is 2.7 / min. There are different structural forms and assembly modes, and the height is customised according to the user's requirements. The change device can be self-locked.
- Q:Operation and attention of electric elevating platform car?
- ?Gives you an explanation of the items of electric elevator: In order to ensure the use of safety and keep the machine in good working condition, the appearance performance check should be performed first. The inspection is as follows: Using the operating: A, the power cord is in good condition; B, the buttons are valid; C, oil pipelines, etc. D, the intersections of the intersections of the arm frame are fastened.
- Q:The ball of the universal milling and lifting platform rolls off, how to install,
- Screw pair after repair good, reinstall the screw pair, need to find a good accuracy of each connecting parts, including position accuracy, positioning accuracy, etc., such as straightness, coaxial degree, parallel degree, diameter jumped, end or something. This is easy to say, but it takes care and patience to do it, and it is usually done by experienced machinery-fitter or fitter. If you can't do it, call the line cutting manufacturer and ask them to repair it.
- Q:Diablo ii flame volcanic mission will not be able to jump
- Go to the end of the board and move to the top of the board, then move to the opposite side of the position, shift the shift and then move the space.
- Q:Description of fixed hydraulic elevator
- Fixed hydraulic elevator products can be divided into cut and fork, double shear, guide rail, cylinder type and wall hanging type etc. Design is novel, dual ladder anti-rotating structure, double speed drop system, the largest rise in 35 meters, stable and reliable, beautiful, simple operation is the biggest characteristic of fixed hydraulic lift cylinder type. Double ladder anti-revolution structure ensures the safety and stability of the work. Also, considering the actual environment of the scene, the oil cylinder can be dumped and handled to ensure the maximum scope of the machine operation.
- Q:What is the phenomenon of the worker's transport of wood using a lift
- The elevator is divided into the following mobile, fixed, wall, tractive, self-propelled, vehicular, and retractable seven categories: mobile The shear fork lift platform is a special equipment for high-altitude operation. The mechanical structure of it, make the lifting platform lifting has high stability, wide operating platform and high bearing capacity, larger, and the area of aerial work for many people work at the same time. Lifting power is divided into 24 v, 220 v or 380 v power supply, diesel engine, with Italy and domestic hydraulic pump station, mesa use antiskid insulated gusset plate, with non-slip, insulation, safety, please be assured that use.
- Q:How does the elevator repair
- Professional personnel should not uninstall electrical appliances at will, in case of electric shock or mistake. The platform should be hoisted and supported when the platform is being repaired under the platform of the platform, so as to prevent the sudden descent of the platform, causing casualties. The overflow valve should not be adjusted arbitrarily. Every element in the hydraulic system works under pressure. Any adjustment of the overflow valve may cause the hydraulic system to operate improperly. There will be unnecessary damage to people, machines and things. In any part of the hydraulic system, the pressure oil must be unloaded first, lest the pressure oil spout and the table suddenly fall. Monthly maintenance A. Roller, shaft and bearing, oil cylinder pin shaft and bearing, arm hinge shaft and bearing, etc.
- Q:The hydraulic platform can't rise. Why?
- You can see here. Understand how the hydraulic platform works. A lot of things will be clear
- Q:What is the hydraulic platform driven
- Choose an electric motor or internal combustion engine based on load and situation
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Straddle Power Stacker--CLT10AC series
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords