• steel scaffolding frames/portable scafolding System 1
steel scaffolding frames/portable scafolding

steel scaffolding frames/portable scafolding

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Specifications

1. Reliable performance
2. Corrosion resistance
3. Durable finish standards

 

Product Name

OEM steel scaffolding frames/portable scafolding/adjustable work

Type

GTJ-F072

Material

Q235

Thickness

1.6mm to3mm or as your requirements

Surface Treatment

Galvanized, DIP Painting, Powder coated

color

Customised, normally we make it red(Dark red and Farrari red), yellow, green, blue and silver.

Dimension

Light duty 40-48mm, MID Duty 48-56/58mm, Heavy duty 48-60mm

MOQ

10tons

Product feature

Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
some times ppl die because of neglect and lack of mentainance so some have take responsobility for this
Q:From the Scarlet Letter, Ch. 10-12
Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.
Q:How to calculate the fastener type steel pipe scaffold
1.1.2 provides for the temporary structure of the scaffolding structure, the structure of the importance coefficient of gamma 0 take 0.9. ?The scaffold structure design of 1.1.3 on reliability requirements, considering that there is no enough statistical data accumulated by the situation, determine the probability limit state design, should be consistent with our historical experience, if using a single coefficient method was designed, the single safety coefficient should be satisfied: the strength calculation of K1 = 1.5 the stability calculation; K2 = 2. To this end, in the calculation of the introduction of the material strength of the additional coefficient of gamma 'm' or resistance to the addition of partial coefficient gamma 'R, gamma' R= gamma 0 gamma 'm=0.9 gamma' m.
Q:I know the ivy sort of glues itself to whatever surface with little sticky pads so that will take care of itself on the back of my house but can I use the existing Ivy for the wisteria to grab onto and climb up or will the wisteria be too heavy and pull the ivy down? I'd rather avoid having to build something for the wisteria to wrap itself around. Any suggestions? Thanks! : )
No, ivy isn't that strong. One can easily unzip it from the walls. Wisteria is way too heavy for ivy. Plus you have the root competition down below. Ivy creates an incredible dense mat of roots , little grows with it. Wisteria would have quite a battle on its hands for root space and nutrients.
Q:i have an interview tomorrow but have a scafold piercing in , its been in there for about 2/3 months nearly healed competely , how ling can i leave it out for , maybe 30-45 minutes? thanks
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
Q:What are the requirements for acceptance of external scaffolding? Want to know before
Hello, this has the following specifications: safety 1, set up a high level scaffolding, the various materials used must meet the quality requirements. 2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures. 3, scaffolding erection technical requirements shall comply with the relevant provisions of the code
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:Latch type disc scaffolding accessories are national patent products?
Also called chrysanthemum disc scaffolding, scaffold system, disc scaffolding system, buckle disc scaffolding, layher frame (layer frame, Lei Ya frame, because the basic principle of the scaffold is by the German LAYHER (Lei Ya)'s invention, the industry has been called the "thunder sub frame"
Q:Key points for safety of portal scaffolding
4, grade six and above six winds and rain, snow, fog should stop the scaffolding erection, demolition and construction operations.5, during the construction of the following shall not dismantle the rod: 1) cross support, horizontal frame; 2) even wall pieces; 3) reinforcement rods: such as scissors, horizontal reinforcement bar, sweeping pole, sealing rod, etc.;
Q:Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
nope! Cartilage piercings take about a year to fully heal up. Yes, you can get 2 separate bars, but let the piercer know thats what you want. Industrials are VERY hard to take care of. Make sure to listen to EVERYTHING the piercer says!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords