• 1219*1700 OEM Steel Scaffolding Frames/Portable Scafolding/Adjustable Work System 1
1219*1700 OEM Steel Scaffolding Frames/Portable Scafolding/Adjustable Work

1219*1700 OEM Steel Scaffolding Frames/Portable Scafolding/Adjustable Work

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1) Frame scaffolding is sturdy in structure and multi-functional in construction.

2)With large operation space , it is easy to walk through the frame scaffolfing system.

3)when frame scaffoloding used with ladder ,people can easily and smoothy access to the wall when doing construction and installation at heights

4)More than one set of frame scaffolding can be ranked to support heavier loads inside the building

Specification                                                                                                               

Item

Frame scaffolding

System

Frame system

Material

Q235,Material is as per customer’s demand with high tensile strength and yield stress

Surface treatment

Powder-coated or Galvanized

Color

Colorful or Galvanized

Size

OEM service

Customer’s size is also available

Certification

CE, ISO9001:2000,  SGS

Main market

America, South Asia, West Europe, etc

Advantages

Superior quality

Easy installation

Competitive price

Standard package

Promptly delivery

Minimum Oder

One container

Supply ability

25 container per month

Port

Qingdao

Currency

By USD

Payment

T/T 30% in advance or L/C

Package

Pallet, safe and standard package

 

STD/ Ledger(P.G.)         Size               Weight      
mmmmKG
Φ42*2.2/Φ42*2.01930*121915.05
Φ42*2.0/Φ42*2.01930*121914.33
Φ42*2.1/Φ42*2.01930*121914.43
Φ42*2.2/Φ42*2.01700*121913.51
Φ42*2.0/Φ42*2.01700*121912.88
Φ42*2.1/Φ42*2.01700*121913.2
Φ42*2.2/Φ42*2.01524*121912.21
Φ42*2.0/Φ42*2.01524*121911.64
Φ42*2.1/Φ42*2.01524*121912
Φ42*2.2/Φ42*2.0914*12199.56
Φ42*2.2/Φ42*2.01930*91414.19
Φ42*2.0/Φ42*2.01930*91413.47
Φ42*2.2/Φ42*2.01700*91412.65
Φ42*2.0/Φ42*2.01700*91412.02
Φ42*2.2/Φ42*2.01524*91411.6
Φ42*2.0/Φ42*2.01524*91411.03

 

Q: Exterior wall scaffold construction plan?
Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
Q: In the U.S.I live in Illinois as well so... yeah :DThank you!
I paid around $55 +tip for mine but it varies from place to place...just call the place you plan on going to and ask them how much they charge.
Q: What are the full house scaffolding specification
Preparation of "full house scaffolding construction plan" according to the specification including but not limited to the following:1 "steel pipe scaffold fastener" (GB15831-2006)2 "technical code for safety of high level construction work" (JGJ80-1991)3 "technical code for safety of scaffold for building construction" (JGJ202-2010)4 "code for safety of steel tubular scaffold with couplers in construction" (JGJ130-2001)
Q: The bottom of the cantilever scaffold must be provided with the sweeping rod
Steel pipe: (1) steel pipe with 48mm outside diameter, wall thickness of 3.5mm steel welded pipe No. 3
Q: A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q: According to the standard set up double scaffolding scaffolding to the number of meters per square meter
Once the calculation is qualified, you can according to the vertical distance
Q: Can you identify Scaffold Grade Aluminum tubing by looking at it.?
The grade or type of Aluminum Alloy materials can not be identified visually because they are almost all the same in appearance. Normally these materials are marked with there Alloy number or designation like, 6061- T6, at certain intervals so that users can distinguish them.
Q: Scaffolding scaffolding erection norms which requirements, who can say?
This problem is more professional, we must be more professional people to answer, just do this industry, here on the simple about the content, you can refer to see.
Q: Okay so I got a scaffold piercing about 5 days ago now. I've been cleaning it with Claire's piercing stuff. What I do is I pour it onto a little bit of loo roll and squeeze it all out on where the holes are. I have not been twisting it at all, but my friend told me that I should soak it in warm salty water and twist it twice a day. I have no idea what to do now as I have researched it and some people say that I shouldn't twist it because it will drag more bacteria into it and could get it infected. Also I have massive scabs around both ends of the bar, I've tried to pick them off as they are pretty uncomfortable, but it didn't work as they are rock solid, so how do I get these off? I have no idea what to do, my piercer didn't say anything about twisting it just cleaning it twice a day. Oh and if it helps I'm 13:) Thanks. X
Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
Q: I want to get a scaffolding piercing, but i just wanna know some information.. past experiences etc. So far i have two lobe piercings on both ears and the pain wasn't too bad, but i've never had a piercing on the upper ear. How much will it cost? (I live in the UK) Just some information i guess (: thanks
I have two lobe piercings on both ears, two cartilage piercings and an industrial that i got five months ago. I was expecting my industrial to be very painful but it wasn't that bad (i have a high pain tolerance though) its a bearable pain. Like all other piercings the healing process is the worst part and still when i bump it (like when im doing my hair) it hurts like a B****! lol. And don't play with it alot when you first get it, it causes scar tissue bumps. Use H20cean spray or you can do 1/4 tsp of sea salt and 1 cup of water to help heal it. The healing time is long, 4 months to a year. I paid $65 dollars in the us idk how much that is UK. It was definitely worth it though! Go for it :)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords